Manager- Production

AIS

Soniyana

On-site

INR 1,200,000 - 1,800,000

Full time

2 days ago
Be an early applicant

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Qualifications

  • Knowledge of manufacturing laminated glass processes.
  • Experience of 12–14 years in similar roles.
  • Ability to lead and motivate floor teams.
  • Strong cost and productivity focus.

Responsibilities

  • Monitor manpower productivity and plan vs actual across processes.
  • Drive PDCA cycles to improve productivity and reduce adjustments.
  • Ensure quality controls and timely QACR closures; implement countermeasures.
  • Achieve yield targets and monitor power consumption and material costs.
  • Lead safety initiatives including audits, near-miss reporting, and training.
  • Participate in new model feasibility and development aligned with budgets.

Skills

Manpower handling
Motivating

Education

B.E in Mechanical Engineering

Job description

Role Description Responsible to meet Section KPI inline with departmentobjectives and goals.

Role purpose Smooth functioning of process and achievingbudgeted targets

Productivity
  • Productivity Manpower productivity monitoring Checking plan v/s actual in each process
  • PDCA to improve productivity Selecting number of productivity improvementthemes .
  • Machine Up time Time Yield all Process
  • Reduction in adjustment time. Run PDCA /Improvement like Jisukane.
Quality
  • In house quality verification tocheck the flow out. Control and implementation of Countermeasurefor past quality issues .
  • Closing of QACR on time. Close with in standard time and conduct LayeredProcess Audit
  • Controlling next process claim ateach process Inhouse To control redbin rejection and work on ZERODEFECT
Cost
  • Achieving Glass yield target Yield controlling at each process.
  • Monitoring and controlling yieldof 5 worst models. To improve over all yield
  • Achieving Process yield target By controlling shaping yield and reduction inrejection.
  • To achieve power consumptiontarget To monitor power consumption w.r.t. target ateach process.
  • Controlling rework due to edgesealing and DNG To keep the cost /m2 with in target limit.
  • Monitoring consumption andreduction in consumption of consumable. To keep the cost /m2 with in target limit.
  • Localization trial andimplementation To reduce consumable cost.
Safety
  • Achieving safety target for reportable,restricted and man days loss injury. Making and follow up of annual safety plan
  • Reducing risk from equipments Risk assessment of equipments
  • Conducting safety audit Closing safety audit finding
  • Near miss reporting from floor tomake it more safe Number of near miss reporting
  • Safety training to operators. Giving training for KY and RA
New model development
  • Participate in feasibility meeting to check the model feasibility and giving proposal to make the model feasible. To achieve the Budgeted yield .
  • To develop the model as percustomer plan and time line Meeting Internal model development plan.
  • To undertake quality maturationactivity in new model on time. On time with target yields
System
  • Follow up of TQM ,TPM,ISO 14001 and IATF16949,ISO50001,OHSAS To meet all system requirements.
  • Process wise audit and updatingthe PQC table. To update PQC as per process improvement.
5 S audit and maintaining thelevel on floor. To keep the floor in neat condition
Suggestion collecting from floorand implementation which are in capacity of production. To improve participation of operator inimprovement activities. (KAIZEN)
Man power development
  • To increase participation in QC circleactivities To improve analysis approach .
Skill matrix updating andtraining for skill up
  • To improve skill level
Operator observance
  • To improve operator working method on floor.
Shop floor controlling
  • Conducting meeting with operator Achieving performance on machine.
Conducting weekly section meetingwith S/V
  • To improve shop floor performance.
Conducting improvement meeting do
  • Co-coordinating project for majoractivities on floor do
  • Working environment on shop floor do
Budgeting and capex approval
  • Controllingbudget and monitor capex activities.
  • Approving leaves of shift s/vprocess engg. And operator and doing required arrangement. To control the manpower allocation in shift
  • Conducting appraisal of processengg,shift s/v and operator. Submitting the performance sheet on time withrecommendation.
REQUIREMENTS
  • Knowledge Manufacturing of laminatedglass and solving the problem arises in different processes. Experience'(Number of years) 12~14 years
  • Skills Manpower handling, Motivating Qualification B.E in Mech engg.
INTERACTION
  • Internal Customers Other External parties/Vendors
  • NMD,QA,Maintenance,Project,HR, Materials, OE and After market Raw material supplier; raw glass and PVB
Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Assistant Manager- Production (Encapsulation)
Assistant Manager- Production (Encapsulation)

Asahi India Glass Limited (AIS) • Maharashtra

On-site
INR 600,000 - 900,000
Group Leader- Quality Assurance
Group Leader- Quality Assurance

Asahi India Glass Limited (AIS) • Patan District

On-site
INR 900,000 - 1,300,000
Senior Manager/Deputy General Manager Production
Senior Manager/Deputy General Manager Production

Calderys • Murwara

On-site
INR 900,000 - 1,500,000
Assistant Production Manager
Assistant Production Manager

Layam • Navi Mumbai, Pune District

On-site
INR 1,200,000 - 1,800,000
Group Leader- Customer Support
Group Leader- Customer Support

Asahi India Glass Limited (AIS) • Patan District

On-site
INR 600,000 - 900,000
Quality Assurance Manager
Quality Assurance Manager

Samyu Glass Pvt Ltd • YSR Kadapa

On-site
INR 1,800,000 - 3,000,000
Plant Head
Plant Head

Intellectual Capital HR Consulting Pvt. Ltd. • New Delhi

On-site
INR 3,500,000 - 6,000,000
Plant Head
Plant Head

Intellectual Capital HR Consulting Pvt. Ltd. • Ahmedabad District

On-site
INR 4,000,000 - 7,000,000
Plant Head
Plant Head

Intellectual Capital HR Consulting Pvt. Ltd. • Gurugram District

On-site
INR 4,000,000 - 7,000,000
Plant Head
Plant Head

Intellectual Capital HR Consulting Pvt. Ltd. • Mumbai

On-site
INR 4,000,000 - 7,000,000