Lucky-Tech in Bhiwandi, Maharashtra is seeking a Site Executive to supervise installations and commissioning for membrane and biogas projects. This role involves site coordination, quality checks, and ensuring timely project completion while managing client relations.

The ideal candidate should hold a Diploma or degree in Mechanical, Civil, or Electrical Engineering, with a strong understanding of installation processes and excellent problem-solving skills. The role requires traveling to various project sites.

Qualifications

  • Preparation of surfaces must be even and clean.
  • Ability to supervise installation processes.
  • Knowledge of safety standards on sites.

Responsibilities

  • Supervise installation activities and ensure compliance.
  • Coordinate with project teams and clients.
  • Prepare and submit daily project reports.

Skills

Mechanical / Civil / Electrical systems understanding
Ability to read engineering drawings
Site coordination skills
MS Excel knowledge
Problem-solving skills
Good communication
Installation and commissioning knowledge
Understanding of safety practices
Ownership mindset
Discipline and accountability
Willingness to travel

Education

Diploma / B.E. / B.Tech in Mechanical / Civil / Electrical Engineering

Job description

Diploma / B.E. / B.Tech in Mechanical / Civil / Electrical Engineering

About Company

LUCKY-TECH Membranes Pvt Ltd is a leading manufacturer and solution provider in the field of technical textiles and membrane-based engineering solutions. The company specializes in PVC/PVDF-coated membrane structures, biogas balloon systems, tensile architecture, industrial fabric solutions, and customized project installations across India.

The company focuses on quality execution, innovation, safety, and customer satisfaction while delivering projects across industrial and infrastructure sectors.

Job Purpose

The Site Executive will be responsible for supervising installation, commissioning, site coordination, quality checks, reporting, and execution activities for membrane and biogas projects at client locations. The role requires strong technical understanding, coordination skills, and execution monitoring to ensure timely and quality project completion.

Key Responsibilities

Supervise site installation activities as per approved drawings and standards.

Coordinate with project managers, installation teams, vendors, and clients.

Ensure proper installation of membrane systems, blowers, piping, control panels, and related accessories.

Monitor site safety, quality standards, and work discipline.

Conduct installation inspections, pre-commissioning checks, and commissioning support activities.

Prepare Daily Progress Reports (DPRs), site reports, and installation checklists.

Ensure proper alignment, fitment, and quality of membrane installations.

Verify readiness of civil platforms and installation surfaces before execution.

Coordinate material movement, site readiness, and manpower planning.

Identify and elevate technical or execution-related issues on time.

Support testing, trial runs, and handover activities.

Maintain professional coordination with clients during execution.

Ensure completion of projects within timelines and quality standards.

Skills Required

Basic understanding of mechanical / civil / electrical systems

Ability to read engineering drawings

Site coordination and execution skills

MS Excel and reporting knowledge

Problem-solving and troubleshooting ability

Good communication and team coordination

Knowledge of installation and commissioning activities

Understanding of safety practices at project sites

Ownership mindset

Discipline and accountability

Willingness to travel and work at sites

Detailed Site Tasks & Checks

Surface cleaning and leveling verification

SS flat positioning, marking, and drilling supervision

Verification of no damage to civil structures

Installation supervision of:

Blowers

Level transmitters

Gas PVRV systems

Air and gas piping systems

Ground sheet placement supervision

Rubber gasket marking and punching

Sikaflex application monitoring

Logo positioning verification

Inspection of membrane condition and cleanliness

Soap water leak test

Electrical checks for blowers and panels

Start-stop functionality checks

Equipment inspection and verification

Blower operation testing

Calibration of pressure transmitters

Calibration of level transmitters

Final installation verification

Client demonstration and handover support

Key Performance Indicators (KPIs)

Timely project execution

Safety compliance at site

Accuracy of reporting

Client coordination and satisfaction

Site issue resolution efficiency

Requirements

Task list

A INSTALLATIONCHECKS

1 Preparedness of platform Top Surface

a. Surface should not be uneven, debris free, no plaster on top

b. Steel should be cut and top surface should be plain.

2 Positioning of SS Flats on top surface of Platform

a. Positioning of SS Flats.

b. Marking & Drilling of SS Flats.

c. No damage to the Wall & top surface.

3 Installation of Accessories

a. Blower: Foundation & Installation, as per Dwg

b. Control Panel: Installation & cable connection to equipments, as per Dwg.

c. Level Transmitter And Pressure Transmitter: Rating, Installation & wiring, as per Dwg.

d. Gas PVRV & Air damper: Installation.

e. Airpiping, Gas Piping & Flange Installation: Sizes & Installations.

4 Membrane Placement

a. Placing of the ground sheet

b. Marking and punching of rubber gasket

c. Ensure membranes are free of damage & properly aligned

d. Cleanliness & dryness of Top Surface of ground sheet

e. Position of Logo on Outer Membrane, as per Client

f. Marking and punching of Inner balloon

g. Marking and punching of outer balloon

h. Applying Sikaflex between the rubber gasket & ground sheet

i. Placement of SS Flats over Outer membrane

j. Tightness of fastners with Hlti impact wrench

5 Visual Inspection of all Membranes & components

a. Physical condition

b. Installations & alignments

B PRECOMMISSIONING CHECKS

1 Soap Water Leak Test

2 Blower Electrical check

3 Blower Start Stop action w.r.t. pressure Set point

4 Electrical panel

5 Installation of view glasss

C STAGE CLEARANCE

Balloon is ready for Commissioning & Operation: Ok / Not Ok

For LTMPL Project supervisor

For Client Project Manager

D COMMISSIONING CHECKS

1 Pre Requisites

a. Power Availability Grid + DG set Backup Power + UPS Support

2 Commissioning Checks

a. Visual Check of installation completion

b. Blower On-Off Operation

c. Calibration of Level transmitter

d. Calibration of Pressure transmitter

e. PVRV water level check

OVERALLCONCLUSION: Installation & Commissioning activitiesare completed & acceptable OK / NOT OK

For LTMPL Project supervisor

For Client Project Manager

Sample responsibilities for this position include:

Responsible for knowledge of contracts, budget and operational requirements

Enforces compliance of customer work standards, company policy and procedures - Leads by example

Is able to establish effective relationships and communications, both internally and externally, with persons of all backgrounds and organizational levels

Accepts responsibility for his/her own performance and demonstrates the capability to assist other team members in reaching success within the organization and contributes to building a positive team environment

Mentors and trains new members of the team to meet or exceed program standards

Tracks time sheets and attendance for assigned personnel

Prepares accurate, precise, and timely reports • Enforces workplace security policies, procedures, and uniform standards

Executes guard mount briefings with clarity and command of the subject matter

Possesses and demonstrates a positive approach toward achieving outstanding customer satisfaction

Constantly seeks ways to improve and promote quality with existing and/or future innovations

Giving top priority to Personnel and then property safety

Developing and managing best in class reporting

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Engineer Project
Engineer Project

Hypro Group • Pune District

On-site
INR 400,000 - 600,000
Lead Project Engineer
Lead Project Engineer

Master Integrators • Navi Mumbai

On-site
INR 600,000 - 1,000,000
Senior Project Engineer
Senior Project Engineer

Talent Corner Hr Services • Pune District

On-site
INR 600,000 - 1,200,000
Site Manager- Hydro Power Plant
Site Manager- Hydro Power Plant

Randstad • Pune District, Mumbai

On-site
INR 1,800,000 - 2,400,000
MEP Execution - Mechanical, Wagle Projec...
MEP Execution - Mechanical, Wagle Projec...

Larsen & Toubro Limited • Mumbai

On-site
INR 2,500,000 - 4,000,000
Project Manager- Signalling
Project Manager- Signalling

TVM Signalling And Transportaion Systems • Pune District, Mumbai, Delhi

On-site
INR 900,000 - 1,300,000
Site Execution Engineer
Site Execution Engineer

Addverb Technologies • Dadri

On-site
INR 500,000 - 700,000
Site Engineer - Mechanical
Site Engineer - Mechanical

IncepBio Private Limited • Bengaluru

On-site
INR 600,000 - 900,000
Dy Manager Projects
Dy Manager Projects

Spruce Engineering • Visakhapatnam

On-site
INR 900,000 - 1,300,000
Manager Mechanical: Projects SMS
Manager Mechanical: Projects SMS

Jindal Stainless Limited • Hisar

On-site
INR 1,500,000 - 2,500,000