Jones Lang LaSalle Incorporated in India seeks a Commissioning Subject Matter Expert to provide end-to-end leadership for data center commissioning across design, construction and handover. You will drive strategies, review designs for testability, coordinate MEP/ELV/IT teams, lead IST, and ensure performance, resilience and safety requirements are met for mission-critical facilities.
With 15–20 years of experience, you will mentor teams, manage risk, and present readiness status to stakeholders
The Commissioning Subject Matter Expert (SME) is a senior technical authority responsible for providing commissioning leadership across the delivery of data center and missioncritical projects.
The role represents the clients operational and reliability interests, ensuring that all building systems are installed, tested, integrated, and validated to meet performance, resilience, redundancy, safety, and compliance requirements. The Commissioning SME supports projects from early design and commissioning strategy development through construction, Integrated Systems Testing (IST), operational readiness, and handover, with a strong focus on technical governance, systems integration, risk management, and performance assurance in fasttrack environments.
Provide endtoend commissioning technical oversight across data centre projects from early design through handover and operational readiness. Act as the commissioning technical authority, advising the client on commissioning strategies, sequencing, risks, and technical options. Develop, review, and manage the project commissioning plan in alignment with Employer’s Requirements (ERs), operational objectives, and resilience criteria. Support development and implementation of commissioning strategies aligned with program, phasing, live environment constraints, and reliability targets.
Mechanical, electrical, and plumbing (MEP) systems ELV, BMS, EPMS, DCIM, and control systems Fire detection, suppression, and life safety systems CSA interfaces impacting commissioning and access Ensure commissioning requirements are embedded in design specifications, sequences of operation, and control narratives. Verify compliance with: Local codes and authority requirements International standards and guidelines (e.g., ASHRAE, CIBSE, NFPA, IEC, ISO) Client data centre commissioning and reliability standards (e.g., Uptime Institute, client-specific protocols) Participate in design reviews, technical workshops, constructability, and value engineering sessions with a commissioning focus.
Review and approve commissioning-related submittals, including: Pre-functional checklists (PFCs) Factory Acceptance Tests (FATs) Site Acceptance Tests (SATs) Commissioning procedures and scripts Conduct site inspections and readiness reviews to verify installation completeness prior to testing. Support resolution of commissioning-related RFIs, nonconformances, and field changes. Monitor commissioning execution quality, documentation, and adherence to approved test protocols. Support punch list management and commissioning closeout activities.
Support phased commissioning strategies, including brownfield and live environment projects where applicable. Contribute to value engineering initiatives while safeguarding performance, reliability, and maintainability. Provide technical input to change management, variations, and claims related to commissioning scope. Support schedule and cost impact assessments in coordination with project controls teams.
Execution of Level 1–5 commissioning and Integrated Systems Testing (IST). Validation of redundancy, failover, and resilience under simulated fault conditions. Support operational readiness, training, SOP development, and handover documentation.
Support senior leadership in managing client expectations related to performance, reliability, and readiness. Clearly present commissioning risks, test results, and readiness status to stakeholders. Coordinate with designers, contractors, vendors, and operations teams. Maintain accurate commissioning records, test results, and acceptance documentation.
Bachelor’s degree in mechanical engineering, Electrical Engineering, Building Services Engineering, or a related discipline.
Certified Commissioning Professional (CCP), BCxP, or equivalent. Data centre commissioning certifications (e.g., Uptime Institute ATD, CDCP) are advantageous.
of experience in commissioning, testing, or technical advisory roles. Proven experience commissioning data centre or missioncritical infrastructure projects.
Strong knowledge of MEP, ELV, controls, and system integration. Familiarity with commissioning management tools, test scripts, and reporting platforms. BIM and digital coordination tools for commissioning readiness reviews. Strong technical reporting, documentation, and governance skills.
Strong leadership in multidisciplinary testing and commissioning environments. Clear communication with technical and nontechnical stakeholders. Detail-oriented with a structured, risk-based approach. Collaborative mindset with strong coordination and facilitation skills.