Senior Electrical Engineer – Data Center Construction Lead

SMEC (an SJ Group company)

Jakarta Pusat

In loco

IDR 90.000.000 - 130.000.000

Tempo pieno

3 giorni fa
Candidati tra i primi

Aumenta le possibilità di ricevere una risposta da questo datore di lavoro

Il tuo curriculum e una lettera di presentazione personalizzati, che corrispondono esattamente a ciò che sta cercando.

Supera i filtri ATS

Descrizione del lavoro

Surbana Jurong invites an Electrical Construction Leader to oversee critical power, installation oversight and coordination of engineers, vendors, and inspectors at our Jakarta project site. You will manage electrical room layouts, pathways, and QA/QC processes to ensure safe, efficient, and compliant delivery.

The role emphasizes collaboration with design teams, utilities, and commissioning to align with the data center power architecture, while maintaining schedules and safety standards.

Mansioni

  • Oversee electrical installation oversight including MV/LV switchgear, transformers, generators, UPS, cable trays, conduits, and distribution boards.
  • Coordinate electrical room layouts, ventilation, fire ratings, egress, grounding, and maintenance paths.
  • Lead design coordination, RFIs, submittals, shop drawings, and technical queries with engineering teams.

Descrizione del lavoro

Surbana Jurong invites an Electrical Construction Leader to oversee critical power, installation oversight and coordination of engineers, vendors, and inspectors at our Jakarta project site. You will manage electrical room layouts, pathways, and QA/QC processes to ensure safe, efficient, and compliant delivery.

The role emphasizes collaboration with design teams, utilities, and commissioning to align with the data center power architecture, while maintaining schedules and safety standards.

Ottieni la revisione del curriculum gratis e riservata.

o trascina qui il file.

Similar jobs

Offerte di lavoro simili che vale la pena confrontare

Lead Electrical Engineer - Data Center Power & Systems
Lead Electrical Engineer - Data Center Power & Systems

Surbana Jurong • Jakarta Pusat

In loco
IDR 450.000.000 - 750.000.000
Senior Electrical Construction Lead - Data Center Power
Senior Electrical Construction Lead - Data Center Power

SJ Group • Jakarta Pusat

In loco
IDR 350.000.000 - 550.000.000
Lead Electrical Engineer
Lead Electrical Engineer

Surbana Jurong • Jakarta Pusat

In loco
IDR 450.000.000 - 750.000.000
Lead Electrical Engineer
Lead Electrical Engineer

SMEC (an SJ Group company) • Jakarta Pusat

In loco
IDR 90.000.000 - 130.000.000
Lead Electrical Engineer
Lead Electrical Engineer

SJ Group • Jakarta Pusat

In loco
IDR 350.000.000 - 550.000.000
Electrical Supervisor (Data Center)
Electrical Supervisor (Data Center)

Confidential • Jawa Barat

In loco
IDR 167.400.000 - 290.160.000
Data Center Electrical Engineer – Lead System Design
Data Center Electrical Engineer – Lead System Design

MatchaTalent • Jakarta Pusat

In loco
IDR 200.000.000 - 320.000.000
Senior Data Center Electrical Engineer HV/MV/LV On-Site
Senior Data Center Electrical Engineer HV/MV/LV On-Site

PT Talenta Eksekutif Asia • Depok

In loco
IDR 200.000.000 - 360.000.000
Lead Electrical Engineer - Data Center Power & Systems
Lead Electrical Engineer - Data Center Power & Systems

CBRE • Jakarta Pusat

In loco
IDR 350.000.000 - 550.000.000
Data Center Electrical Engineer - HV/MV Systems Lead
Data Center Electrical Engineer - HV/MV Systems Lead

MatchaTalent • Jakarta Selatan

In loco
IDR 360.000.000 - 540.000.000