Field Safety Manager – Data Center Construction (Contractor)

Sheakley

St. George

Sur place

GBP 68 000 - 89 000

Plein temps

Il y a 10 jours

Une candidature complète en une minute

Un CV et une lettre de motivation personnalisés, prêts à envoyer.

Passez les filtres ATS

Résumé du poste

Sheakley is seeking a Construction Safety Manager for a Saint George, SC data center construction project. This 8‑month, 1099 contractor role focuses on hands-on safety leadership for mechanical construction activities, collaborating with field supervision, craft personnel, and project leadership.

The role emphasizes a strong field presence, oversight of hot work, crane and rigging, fall protection, and JHA/permit reviews in a fast-paced environment.

Qualifications

  • OSHA 500 or OSHA 510 Certification, or Higher Safety Designation
  • CHST, ASP, CSP or other BCSP credential
  • Experience supporting mechanical/piping/HVAC installation on large projects
  • Data center construction experience

Responsabilités

  • Oversee daily safety activities for mechanical construction operations
  • Maintain a highly visible field presence alongside mechanical crews and project supervision
  • Conduct routine site inspections, audits, field observations, and risk assessments
  • Monitor mechanical installation, piping, equipment setting, and material handling activities
  • Support safe execution of hot work, welding, cutting, and grinding operations
  • Monitor elevated work, aerial lift, scaffold, and fall protection activities
  • Support crane, rigging, and equipment placement operations
  • Monitor contractor compliance with OSHA regulations and project-specific safety requirements
  • Review Job Hazard Analyses (JHAs), permits, lift plans, and pre-task plans
  • Lead incident investigations and corrective action implementation
  • Maintain safety documentation, reports, inspections, and compliance records
  • Partner with project supervision to proactively identify and mitigate hazards
  • Promote a positive safety culture throughout the project

Connaissances

Safety leadership
Field presence
Hazard assessment

Formation

OSHA 500/510 Certification or higher safety designation
CHST/ASP/CSP or BCSP credential
Data center/mechanical construction safety experience

Description du poste

Sheakley is seeking a Construction Safety Manager for a Saint George, SC data center construction project. This 8‑month, 1099 contractor role focuses on hands-on safety leadership for mechanical construction activities, collaborating with field supervision, craft personnel, and project leadership.

The role emphasizes a strong field presence, oversight of hot work, crane and rigging, fall protection, and JHA/permit reviews in a fast-paced environment.

Obtenez votre examen gratuit et confidentiel de votre CV.

ou faites glisser et déposez votre fichier ici.

Similar jobs

Postes similaires à comparer

Field Safety Lead for Electrical and Data Center Build
Field Safety Lead for Electrical and Data Center Build

Sheakley • St. George

Sur place
GBP 85 000 - 102 000
Safety Manager
Safety Manager

Sheakley • St. George

Sur place
GBP 68 000 - 89 000
Safety Coordinator
Safety Coordinator

Sheakley • St. George

Sur place
GBP 85 000 - 102 000
Construction Safety Coordinator — On-Site Safety Lead
Construction Safety Coordinator — On-Site Safety Lead

U.S. Engineering • City of Westminster

Sur place
GBP 35 000 - 50 000
Year-end bonus
Health, dental, and vision plans
Paid time off
Senior HSE Lead – Construction (Data Centre) + Car Allowance
Senior HSE Lead – Construction (Data Centre) + Car Allowance

Kenton Black • High Wycombe

Sur place
GBP 50 000 - 70 000
Onsite Construction Safety Leader
Onsite Construction Safety Leader

Gilbane Building • Mirbister

Sur place
GBP 74 000 - 92 000
Benefits and retirement program
Senior EHS Lead: Data Centre Construction & Safety
Senior EHS Lead: Data Centre Construction & Safety

Highfield Professional Solutions Ltd • Leeds

Sur place
GBP 42 000 - 56 000
Data Center Construction Lead
Data Center Construction Lead

Nscale • Greater London

Sur place
GBP 104 000 - 149 000
Private medical cover
Pension
Generous leave
+1
Construction Supervisor: Infrastructure & Safety (Hybrid)
Construction Supervisor: Infrastructure & Safety (Hybrid)

Mace Consult • Grande-Bretagne

Hybride
GBP 55 000 - 85 000
Construction Manager (12-Month FTC) - Lead Safety-Critical Projects
Construction Manager (12-Month FTC) - Lead Safety-Critical Projects

Cornerstone • Poole

Sur place
GBP 45 000 - 65 000
Joint-contribution pension
Enhanced maternity & family leave
Life assurance
+2