Role Definition
Provisional Schedule
EPCI contact for OSS and HVDC converter station have been signed off on May 02nd 2024 between RTE and the consortium.
A high-level project program for the CM1-CM2 EXC/ISL is presented below:
Design phase CM1/CM2 EXC and ISL: 02/05/2024 – 31/12/2025
Fabrication CM1 EXC (Offshore section): 01/11/2024 – 31/01/2028
Fabrication CM2 EXC (Offshore section): 01/11/2025 – 30/05/2030
SCOPE OF WORK
1/ Technical support to Employer for Welding engineering topics
This includes:
Review and comments of EPCI Contractors proposed procedures likely:
Welding book (including WPQR booklet & WPS)
Weld map
Welding production testing plans
Welding consumable procedure
(This shall include necessary knowledge on welding, as well as materials aspects).
This review applies to EPCI Contractors procedures and their subcontractors as per MDR document.
3 main scopes identified to be quoted as lump sum:
Topside scope – indicative period oct 2025 for submitted first IFR (issue for review procedures)
Cofferdam scope – indicative period sept 2025 (issue for review procedures)
Jacket scope – indicative period oct 2025 (issue for review procedures)
Pile scope – indicative period july 2025 (issue for review procedures)
2/ Technical support in reviewing Non-Conformity Reports, Deviation requests, Technical queries during EPCI project.
3/ Site activities (optional scope)
Participation in technical inspections on site /yard depending on criticality / contractor appraisal
WPT tests witnessing on site
Main referenced applicable codes/standards
DNV-ST-0145 Offshore substations (governing standards)
DNV-OS-C401 Fabrication and testing of offshore structures