Job title: Flow Assurance
Sector: Oil & Gas
Starting date: ASAP
Duration: 12 months
Renewable: Yes
Location: France - Paris
Language: English mandatory
The purpose of the service activities is to carry out all the technical flow assurance studies for block 58, as part of the installations necessary for the development of the first field of B58. Carrying out all the flow assurance studies for GPI Suriname Project. Preparing and monitoring of the HIPS file, when necessary.
The activity takes place in the context of the execution phase of a major project in Suriname. The Suriname GPI is a multidisciplinary team that coordinates the studies managed by the Client OneTech on the Deep and Shallow Water discoveries of offshore Suriname Block 58. The technical challenges the GPI / Project will face are the reservoir development and management, FPSO, and subsea production/injection system. The Suriname Team will develop the Project with the objectives of maximizing economic results by optimizing the reserves, and the schedule, reducing the costs and the Greenhouse Gas (GHG) emission, while maintaining the technical quality of the installations, with high H3SE requirements and focusing.