Service Location : Paris or Pau
Target Start date : July 2025
Estimated Service Duration : 1 year renewable
Project : The activity takes place in the context of the execution phase of a major project in Suriname. The Suriname GPI is a multidisciplinary team that coordinates the studies managed by TotalEnergies OneTech on the Deep and Shallow Water discoveries of offshore Suriname Block 58. The technical challenges the GPI / Project will face are the reservoir development and management, FPSO, and subsea production / injection system.
The Suriname Team will develop the Project with the objectives of maximizing economic results by optimizing the reserves and the schedule, reducing the costs and the Greenhouse Gas (GHG) emission, while maintaining the technical quality of the installations, with high H3SE requirements and focusing.
The Service holder will coordinate the Budget & Cost Control activities for a Package of the B58 Suriname Project throughout the Project life cycle.
ACTIVITIES
The Service Supplier will participate actively in the Cost Control activities of one package (FPSO, SURF, SPS, Drilling) of B58 Suriname Project.
The Service holder will advise the Project Control Manager / Lead, as needed, and support the Project in all matters regarding the Cost Control structure, Cost Control procedures, Cost Control reporting and practices using the Cost Control tools (SAP, U-COST tool or similar).
Part of the Service will include, but not be limited to, preparing, analyzing, processing, and presenting all information and documentation related to the Project costs and expenditures, in close liaison with the Project Control Manager / Lead.
The service holder shall be very familiar with costs estimation processes, actuals, accruals, provision, forecast notions within a multi-year, multi-currency Project environment.
The service holder shall always compare initial budget, previous status to current forecast, justify the associated gaps with the support of the technical teams. The service holder shall highlight and escalate any issues presented regarding Budgeting and Costs and propose any mitigation action whenever needed / identified.
Technical Requirements :
Note : Only shortlisted candidates will be contacted for an interview. Thank you for your interest.