Activez les alertes d’offres d’emploi par e-mail !
Mulipliez les invitations à des entretiens
Aventa est à la recherche d'un expert en revêtement et corrosion pour soutenir RTE dans la gestion des projets CM1 et CM2. Le candidat idéal sera chargé de la supervision des activités de protection de surface, assurant la conformité avec les normes internationales. Le poste est principalement à distance, avec des déplacements occasionnels pour des inspections sur site en Europe.
Role Definition
Client: RTE (Réseau de Transport d’Électricité) Projects: Centre Manche 1 (CM1) and Centre Manche 2 (CM2) Document Type: Scope of Work / Technical Requirements for External Expertise
Objective of the Requisition
The objective of this requisition is to contract an external coating and corrosion expert to support RTE in monitoring and validating the surface protection and corrosion mitigation activities during the engineering, procurement, construction, and commissioning (EPCIC) of the Centre Manche HVDC offshore converter platforms CM1 & CM2.
The expert will assist the project management team in the review of technical documents, inspection procedures, and site supervision activities, ensuring alignment with international standards and project requirements.
Project Background & Scope
️ Platform Overview:
Two HVDC Offshore Substations (CM1 & CM2)
Each rated at 1.25 GW
Located in the English Channel
EPCIC Contractor: Consortium of Chantiers de l’Atlantique (CdA) and Hitachi Energy
Platform components:
6 structural decks
Helideck
2 heavy-lift cranes
Living quarters
Main Responsibilities of the Coating and Corrosion Expert
1. Document Review & Compliance Monitoring
Review EPCIC documentation:
Coating specifications
Painting plans
Surface preparation and application procedures
Corrosion protection philosophies
Review deviations, technical clarifications, and non-conformity reports.
Ensure all systems meet RTE standards and applicable international references.
Support the issuance of Comment Review Sheets (CRS) to EPCIC contractor.
2. Field Inspection & Quality Surveillance
Participate in on-site inspections during manufacturing, construction, and testing:
Yard fabrication in Poland
Painting shops in Belgium, Netherlands
Assembly and integration works in Saint-Nazaire, France
Optional attendance depending on criticality and location.
Monitor coating thicknesses, surface treatment quality, and proper application of anti-corrosion systems.
3. Support to RTE Internal Teams
Provide technical advice and validation during:
Weekly coordination meetings
Interface resolution sessions
Final system acceptance review
Contribute to RTE’s internal quality assurance activities and compliance assessments.
Required Standards & Reference Documents
The consultant must demonstrate compliance and familiarity with the following norms:
ISO 12944 (Corrosion protection of steel structures by protective paint systems)
NORSOK M-501 (Surface preparation and protective coating for offshore installations)
DNV-ST-0145
DNV-RP-B401 (Cathodic protection)
RTE Technical Specifications and EPCIC documentation (provided as annexes)
Required Qualifications & Certifications
FROSIO Certification Level II minimum, issued by an accredited FROSIO inspector (Level III).
Proven track record in coating QA/QC, surface protection supervision, and EPCI support.
Experience in the offshore energy sector, preferably in HVDC or OWF (Offshore Wind Farm) substations.
Schedule & Workload
Duration:
Start Date: 15 July 2025
Base Duration: 12 months
Optional Extension: +6 months
Location & Travel:
Remote-based position with mandatory availability for:
Regular project meetings (mainly held at RTE HQ – Paris La Défense)
Occasional on-site visits (yards in Poland, Belgium, Netherlands, France)
Travel and visit frequency: ~1-2 missions per quarter depending on project needs.
Language
English is the mandatory working language (documentation, meetings, and communications).
French proficiency is not required but can be beneficial.
Deliverables
Review reports (with technical comments and assessments)
Non-conformity follow-up sheets
Inspection summaries
Final recommendation report on coating completion and conformity