CSA Project Manager - Data Centre Construction

Parapex Talent

Helsinki

On-site

EUR 90,000 - 140,000

Full time

43 hours ago
Be an early applicant

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

Relocation support
Visa sponsorship

Job summary

Parapex Talent is seeking a senior professional to lead the civil, structural and architectural scope for a major Finnish data centre build. You will drive the project from detailed design through handover, coordinating with civils, MEP and commissioning teams to ensure rooms are ready for equipment energisation.

Relocation is supported, and visa sponsorship is available for those who need it. A contractor background on large-scale builds with a proven ability to challenge schedules and maintain

Qualifications

  • Lead the CSA scope from excavation through to handover.
  • Manage civils contractors against programme, quality, safety and cost.
  • Challenge contractor methodology, sequencing and logistics before critical paths.
  • Review RFIs, shop drawings and design changes, and make the client’s call on change and scope.
  • Coordinate CSA interfaces with mechanical, electrical and commissioning teams so rooms are ready for equipment energisation.
  • Run inspections and defect close-out, then hand the completed building over to operations.

Responsibilities

  • Lead CSA scope end-to-end from design to handover.
  • Coordinate interfaces with MEP and commissioning teams to ensure readiness.
  • Oversee inspections and defect close-out and handover to operations.

Skills

Contractor management
CSA coordination
Change control
Handover experience

Education

Civil/structural engineering degree
Construction management degree
PMP/PRINCE2/ICE accreditation

Job description

The Project

A major data centre operator is building a long-term programme of new facilities across several sites in Finland. It is hiring people to stay with the programme and take buildings from the ground up, phase after phase. You will lead the civil, structural and architectural (CSA) scope from detailed design through to handover.

What You Will Do
  • Lead the CSA scope from excavation, piling, foundations and slab through steel frame, roofing and facades to a building ready for equipment install.
  • Manage the general contractor, civils contractors and subcontractors against programme, quality, safety and cost, and support tender evaluation for major CSA packages.
  • Challenge contractor methodology, sequencing and logistics before problems reach the critical path.
  • Review RFIs, shop drawings and design changes, and make the client's call on change and scope.
  • Coordinate CSA interfaces with mechanical, electrical and commissioning teams so rooms are ready for equipment and energisation.
  • Run inspections and defect close-out, then hand the completed building over to operations.
What You Will Need
  • You have managed substructure and structure packages on a large, complex build: excavation, piling, foundations, slab and steel frame.
  • A contractor background, as a project manager or construction manager on civils or building packages, in data centres, pharma, logistics, industrial or similar.
  • You have taken a project from pre-construction through to completion and handover.
  • The ability to challenge a contractor's programme with evidence and keep the working relationship intact.
  • Willingness to relocate to Finland for a long-term role.
Useful But Not Essential
  • Data centre or other mission-critical experience.
  • Previous client-side, developer or owner/operator experience.
  • A degree in civil or structural engineering or construction management, or PMP, PRINCE2, CIOB, RICS or ICE accreditation.
Relocation

Relocation support is provided, but you arrange and pay for your own housing.

Candidates from across Europe and the UK are welcome, and visa sponsorship is available for those who need it.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

CSA Project Manager - Data Centre
CSA Project Manager - Data Centre

Paravon Group • Uusimaa

On-site
EUR 117,000 - 143,000
CSA Project Manager
CSA Project Manager

g2 Recruitment • Vaasa

On-site
EUR 90,000 - 120,000
CSA Package Manager
CSA Package Manager

The Launch Group • Finland

On-site
EUR 90,000 - 130,000
Travel costs covered
Apartment provided
Living-away-from-home allowance
Construction Project Manager - Data Centres
Construction Project Manager - Data Centres

Parapex Talent • Helsinki

On-site
EUR 70,000 - 100,000
CSA Supervisor
CSA Supervisor

Winthrop Technologies • Helsinki

On-site
EUR 60,000 - 80,000
Long-term career progression opportunities
Professional development support
Competitive salary packages
CSA Construction Manager
CSA Construction Manager

Winthrop Technologies Ltd. • Kirkkonummi

On-site
EUR 90,000 - 120,000
Data centre projects
Team collaboration
Career development
+2
CSA Construction Manager (Civils)
CSA Construction Manager (Civils)

Enersense International • Helsinki

On-site
EUR 70,000 - 90,000
CSA Construction Manager
CSA Construction Manager

Winthrop Technologies • Espoo

On-site
EUR 55,000 - 75,000
Career progression and development supported
Competitive salary packages
Site Engineer (CSA) - Data Centre Project
Site Engineer (CSA) - Data Centre Project

g2 Recruitment • Vaasa

On-site
EUR 41,000 - 83,000
CSA Project Manager
CSA Project Manager

V7 Recruitment Ltd • Helsinki

On-site
EUR 120,000 - 190,000
Competitive package with bonus
Long-term pipeline of European data‑中心
Client-side project leadership
+1