Cost Engineer / Earned Value Analyst

Energy Resilience Partners, LLC

Illesheim

Hybrid

EUR 90.000 - 120.000

Vollzeit

Vor 6 Tagen
Sei unter den ersten Bewerbenden

Erhalte mehr Antworten von Arbeitgebern

Versende in nur wenigen Minuten einen passgenauen Lebenslauf.

Zusammenfassung

Energy Resilience Partners, LLC (ERP) leads a federal energy-resilience effort for Storck Barracks Microgrid in Bavaria, Germany. The Senior Engineer will manage cost baselines, accruals, earned value, and cash flow analytics while coordinating across U.S. and German time zones.

The role supports ERP, Government, and JV participants, ensuring auditable records, risk management, and compliant reporting. Remote/hybrid work with defined milestones and Germany-site presence is required.

Qualifikationen

  • Relevant degree or equivalent experience on federal, EPC, utility, or complex construction programs.
  • Strong written communication and records discipline; ability to coordinate across U.S. and German time zones.
  • Ability to meet Germany work-status, installation-access, and information-handling requirements.

Aufgaben

  • Translate awarded requirements into controlled scope, WBS, schedule, cost, risk, records, and accountable action owners.
  • Coordinate ERP, Government, RICHARD, P3, JV participants, OEMs, and subcontractors through the reporting chain.
  • Maintain timely, auditable records and decision-ready weekly/monthly reporting; identify variances before they affect the critical path.
  • Prevent unauthorized commitments, uncontrolled access, superseded information, or unsupported labor/cost charges.
  • Support mobilization, performance, changes, invoicing, acceptance, closeout, and lessons learned.

Ausbildung

Relevant degree or equivalent experience
PMP/PSP/CPCM or role-specific credential
Experience on federal, EPC, utility, or complex construction programs

Jobbeschreibung

ANMG-PC-002 | Storck Barracks Microgrid | Contingent opportunity

WORK LOCATION: REMOTE/HYBRID - Germany attendance is mandatory at defined milestones. Duty location: Remote with Central European time overlap; scheduled travel to Bavaria, Germany. Minimum Germany presence: Site presence at baseline, major forecast, and change reviews

REQUISITION ANMG-PC-002

CSS CAM LCAT 640 - Senior Engineer / IT Staff Member (provisional)

DUTY LOCATION Remote with Central European time overlap; scheduled travel to Bavaria, Germany

WORK ARRANGEMENT REMOTE/HYBRID - Germany attendance is mandatory at defined milestones

REPORTS TO ERP Project Manager / designated functional lead

EMPLOYMENT PROJECT HIRE, PARTNER ASSIGNMENT OR PHASE SPECIALIST

REQUIREMENT BASIS EXECUTION-DERIVED: ERP management, administration, permitting, procurement, logistics or work-front control role used to deliver the contract.

About ERP and the Project

Energy Resilience Partners, LLC (ERP) is a tribally led federal energy-resilience contractor building the contingent team for the USAG Ansbach - Storck Barracks Smart Microgrid in Bavaria, Germany. The 730-day project integrates two 1 MW diesel generators, 2 MW / 4 MWh battery energy storage, photovoltaic generation, 20 kV medium-voltage distribution, fuel systems, protection, SCADA/microgrid controls, fiber communications, an underground interconnection corridor and full testing, training and commissioning.

Position Summary

Maintains the cost baseline, commitments, accruals, earned value, estimate-at-completion, cash flow, and labor/productivity analytics.

What You Will Do
  • Translate the awarded requirements into controlled scope, WBS, schedule, cost, risk, records, and accountable action owners.
  • Coordinate ERP, Government, RICHARD, P3, JV participants, OEMs, and subcontractors through the authorized reporting and escalation chain.
  • Maintain timely, auditable records and decision-ready weekly/monthly reporting; identify variances before they affect the critical path.
  • Prevent unauthorized commitments, uncontrolled access, superseded information, or unsupported labor/cost charges.
  • Support mobilization, performance, changes, invoicing, acceptance, closeout, and lessons learned.
Minimum Qualifications
  • Relevant degree or equivalent experience and demonstrated performance on federal, EPC, utility, or complex construction programs.
  • Strong written communication, digital systems, records discipline, and ability to coordinate across U.S. and German time zones.
  • Ability to meet the assigned work-location, Germany work-status, installation-access, and information-handling requirements.
Preferred Qualifications

USACE/RMS-CM experience; PMP/PSP/CPCM or role-specific credential; OCONUS/Germany experience.

Germany Work Authorization, Location and Access
  • Selection remains subject to contract qualifications, installation access, employer-of-record and data/system permissions.
  • Remote outside Germany or approved Germany-local/accredited/short-term work status for required site visits.
  • Employer/engagement source must match the approved ERP staffing plan, subcontract chain, independence rules and German employment/work-status requirements.
  • No field work may begin until required Government personnel approval, installation access/badging, safety orientation, role designation/appointment, system/data permissions and work-front release are complete.
Field, Travel and Employment Conditions
  • Work arrangement: REMOTE/HYBRID - Germany attendance is mandatory at defined milestones; minimum presence: Site presence at baseline, major forecast, and change reviews.
  • Project-based and contingent upon award/NTP, funding, final staffing authorization, qualification verification, Government approval where applicable, employer-of-record completion and installation access.
  • Must support approved work hours, outages, testing windows, alternate shifts, weekends or German holidays when the schedule and lawful working-time controls require.
  • Must comply with ERP/prime direction, EM 385-1-1, German safety and labor requirements, quality controls, CUI/FCI and photography/device restrictions, accurate timekeeping and project conduct rules.
Application Materials
  • Resume/CV showing employer, dates, role, project value, technical scope, location, contract/client and specific responsibilities for comparable work.
  • Copies of applicable degrees, licenses, certifications and training records with issuing body and expiration date.
  • Current location, Germany work-authorization/status basis, earliest availability, travel/relocation constraints and required notice period.
  • At least three professional references for comparable work; Government-submitted roles may require additional verification and signed commitment/appointment documentation.
Suggested JazzHR Screening Questions
  • What is your present legal basis to perform the required work in Germany, and will it remain valid through your target assignment period beginning September 8, 2026?
  • Can you meet this work arrangement: REMOTE/HYBRID - Germany attendance is mandatory at defined milestones, including the stated Storck Barracks/Germany attendance?
  • How many years have you performed substantially similar cost engineer / earned value analyst work, and what is the closest project by size, scope and complexity?
  • Identify the degree, license, certification, CQM/safety/trade/OEM credential or system qualification that establishes you meet this posting's minimum requirements.
  • Describe your English proficiency for Government communication and your German proficiency for Host Nation, authority, supplier or field coordination.

Equal opportunity statement: ERP and each approved employing entity make employment decisions without unlawful discrimination. Any tribal, veteran or other preference will be used only when legally authorized and expressly approved for the employing entity and posting.

Hol dir deinen kostenlosen, vertraulichen Lebenslauf-Check.
oder ziehe deine Datei hierhin.
Similar jobs

Ähnliche Jobs, die dir auch gefallen könnten

Project Administrator and Meeting Coordinator
Project Administrator and Meeting Coordinator

Energy Resilience Partners, LLC • Illesheim

Hybrid
EUR 42.000 - 65.000
Civil and Structural Engineer
Civil and Structural Engineer

Energy Resilience Partners, LLC • Illesheim

Hybrid
EUR 95.000 - 130.000
Mechanical and Fuel Systems Engineer
Mechanical and Fuel Systems Engineer

Energy Resilience Partners, LLC • Illesheim

Hybrid
EUR 85.000 - 120.000
Buyer and Subcontract Administrator
Buyer and Subcontract Administrator

Energy Resilience Partners, LLC • Illesheim

Hybrid
EUR 90.000 - 130.000
Document Control and RMS-CM Manager
Document Control and RMS-CM Manager

Energy Resilience Partners, LLC • Illesheim

Vor Ort
EUR 70.000 - 100.000
Contracts and Change Manager
Contracts and Change Manager

Energy Resilience Partners, LLC • Illesheim

Hybrid
EUR 90.000 - 130.000
Site Logistics, Traffic and Laydown Manager
Site Logistics, Traffic and Laydown Manager

Energy Resilience Partners, LLC • Illesheim

Vor Ort
EUR 90.000 - 130.000
German Codes, DIN/VDE and Interconnection Engineer
German Codes, DIN/VDE and Interconnection Engineer

Energy Resilience Partners, LLC • Illesheim

Hybrid
EUR 120.000 - 166.000
Lead Electrical and Power Systems Engineer
Lead Electrical and Power Systems Engineer

Energy Resilience Partners, LLC • Illesheim

Hybrid
EUR 110.000 - 150.000
General Site Support and Temporary Facilities Lead
General Site Support and Temporary Facilities Lead

Energy Resilience Partners, LLC • Illesheim

Vor Ort
EUR 60.000 - 90.000