Social network you want to login/join with:
Client: Holcim
Location: Zug
Job Category: Other
Job Reference: 9dc5934623df
Job Views: 4
Posted: 25.04.2025
Expiry Date: 09.06.2025
SUMMARY OF THE JOB
Holcim announced in September the Net Zero Pledge, i.e. meet the 1.5°C target in alignment with SBTi. CO2 Capture is an important leg of this journey. We must further develop various Carbon Capture, Utilization and Storage (CCUS) technologies with the objective of having economically viable solutions at industrial scale. CCUS plays an important role with more than 50 projects being worked on currently and still increasing. Holcim is not focusing on a single technology and solution; the scope is broad with collaboration between local, regional and corporate level. To develop and manage CCUS projects and give best support to the countries in integrating new technologies & concepts in the cement manufacturing environment, technical activities need to be coordinated amongst various players.
MAIN ACTIVITIES / RESPONSIBILITIES
PROFILE REQUIRED
Level of education/qualifications normally required:
Specific work experience: