Open-Pit Mining Engineer – Drill & Blast Planner

ConsMin

Western Australia

On-site

AUD 120,000 - 180,000

Full time

1 hour ago
Be an early applicant

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

FIFO 7:7 roster
Salary sacrifice options
Study assistance
Mental health program

Job summary

ConsMin is seeking a Mining Engineer to join our Technical Services team at the Woodie Woodie mine site, about 480km southeast of Port Hedland. You will contribute to mine planning, design and drill and blast, supporting production targets and improving efficiency.

Reporting to the Superintendent, you will develop plans, designs and schedules, monitor performance, and collaborate with geology, survey and operations. A 7:7 FIFO roster and competitive remuneration are offered.

Qualifications

  • Degree or qualification in Mining Engineering or equivalent experience.
  • Exposure to open-pit mining and mine planning is highly regarded.
  • Understanding of mine design, planning and scheduling.
  • Experience with production drill and blast design and related software.

Responsibilities

  • Develop and maintain short- and medium-term mine plans and production schedules.
  • Undertake pit, stage, access and haul road designs to support operations.
  • Prepare production drill and blast designs, including blast-hole patterns.
  • Monitor performance against plans and identify productivity improvements.
  • Collaborate with Geology, Survey, Geotechnical and Operations teams to ensure practical designs.

Skills

Open-pit mining
Mine planning
Deswik CAD
Surpac
Drill and blast design
Analytical thinking
Cross-functional collaboration

Education

Mining Engineering degree

Tools

Deswik CAD
Surpac
Scheduling software

Job description

ConsMin is seeking a Mining Engineer to join our Technical Services team at the Woodie Woodie mine site, about 480km southeast of Port Hedland. You will contribute to mine planning, design and drill and blast, supporting production targets and improving efficiency.

Reporting to the Superintendent, you will develop plans, designs and schedules, monitor performance, and collaborate with geology, survey and operations. A 7:7 FIFO roster and competitive remuneration are offered.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Mining Engineer
Mining Engineer

ConsMin • Western Australia

On-site
AUD 120,000 - 180,000
FIFO 7:7 roster
Salary sacrifice options
Study assistance
+1
Senior Open-Pit Mining Engineer: Planning, Drill & Blast
Senior Open-Pit Mining Engineer: Planning, Drill & Blast

Go Engineering Pty Ltd • Western Australia

On-site
AUD 120,000 - 180,000
Open Pit Mining Engineer: Drill & Blast Lead, FIFO WA
Open Pit Mining Engineer: Drill & Blast Lead, FIFO WA

Focus Minerals • Western Australia

On-site
AUD 140,000 - 190,000
Competitive salary
Salary packaging
Employee Assistance Program (EAP)
+3
FIFO Mining Engineer - Open-Pit Planning & Drill & Blast
FIFO Mining Engineer - Open-Pit Planning & Drill & Blast

Lynas Rare Earths Ltd • Western Australia

Hybrid
AUD 110,000 - 150,000
Mining Planning Engineer – Mt Holland Open Pit
Mining Planning Engineer – Mt Holland Open Pit

Covalent Lithium • City Of Kwinana, Shire Of Yilgarn

On-site
AUD 120,000 - 180,000
Competitive remuneration
Annual incentives
Flexible work arrangements
+3
Mining Engineer - Open Pit
Mining Engineer - Open Pit

Focus Minerals • Western Australia

On-site
AUD 140,000 - 190,000
Competitive salary
Salary packaging
Employee Assistance Program (EAP)
+3
All Rounder Operator
All Rounder Operator

ConsMin • Marble Bar

On-site
AUD 120,000 - 150,000
Excellent food
Camp facilities
Birthday leave
+1
Senior Open-Pit Mining Engineer – WA Base Metals
Senior Open-Pit Mining Engineer – WA Base Metals

Iron Cove Global • Western Australia

On-site
AUD 180,000 - 260,000
Senior Mining Engineer - Drill & Blast, Bowen Basin Growth
Senior Mining Engineer - Drill & Blast, Bowen Basin Growth

Optimum Consulting • Mackay Regional

On-site
AUD 120,000 - 180,000
Senior Mining Engineer: Drill & Blast, Planning, FIFO/DIDO
Senior Mining Engineer: Drill & Blast, Planning, FIFO/DIDO

NRW Holdings • Berry Springs, Darwin, Perth, Adelaide

On-site
AUD 170,000 - 210,000
Loyalty Bonus Scheme
Employee Referral Bonus
Salary sacrifice & novated lease
+5
Top locations