A complete application in a minute
Tailored resume and cover letter, ready to send.
UGL and CPB Contractors are delivering the HumeLink West project in NSW. The role seeks Cert III Transmission Overhead Linespersons for a 500kV transmission line team, based in Wagga Wagga with FIFO/DIDO options. All flights, accommodation and meals are provided in brand new camps.
The role involves climbing, asset upgrades, interpreting drawings, liaising with inspectors, and completing risk assessments while adhering to safety policies.
UGL and CPB Contractors have been selected by Transgrid to deliver the ~140km western section of the HumeLink high voltage electricity transmission project.
HumeLink is a new 500kV transmission project which will connect Wagga Wagga, Maragle and Bannaby in regional NSW that will significantly increase the capacity of the electricity network in Australia’s eastern states. HumeLink is one of Australia’s largest energy infrastructure projects, with about 365kms of proposed new transmission lines and a range of other new and upgraded infrastructure.
The HumeLink West scope of works, worth $1.4bn, includes delivery of new 500kV double circuit transmission lines spanning ~140kms from Wagga Wagga Substation to a new Substation at Gugaa, the Interface Point with HumeLink East near Gundagai and a new substation at Maragle in the Snowy Mountains for future connection to Snowy 2.0.
We are looking for experiencedCert III Transmission Overhead Linespersons to join our Stringing team. You will play a key role in our transmission tower construction team, working within an established team on a large scale 500kV infrastructure project.
This will be a full-time permanent opportunity on a FIFO/DIDO basis, based in Wagga Wagga, NSW. All flights, accommodation and meals provided in brand new camps.
We have multiple roster options available.
We are an Equal Opportunity Employer. We support women in construction, Indigenous advancement and participation and encourage people of all cultural backgrounds to apply.