Traveling Electrical Site Safety Coordinator - Data Center Construction

Goliath Construction Consulting, Inc.

Atlanta (GA)

On-site

USD 60,000 - 90,000

Full time

14 days+

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

Per Diem and Travel Reimbursements
Comprehensive health, dental, and vision insurance
Retirement savings plan with company match
Opportunities for professional development and certification

Job summary

Goliath Construction Consulting, Inc. seeks a *Traveling Electrical Site Safety Coordinator* for data center projects across the U.S. This key role emphasizes promoting safety compliance and requires strong OSHA knowledge. Ideal candidates possess 3+ years in construction safety, exceptional leadership skills, and the ability to adapt quickly to various job sites while ensuring worker safety.

Qualifications

  • 3+ years of construction safety experience, preferably in electrical or data center environments.
  • Strong knowledge of OSHA regulations, NFPA 70E, and electrical safety protocols.
  • Ability to travel full-time.

Responsibilities

  • Serve as the on-site safety lead for electrical crews.
  • Implement site-specific safety plans and conduct site inspections.
  • Ensure compliance with OSHA, NFPA 70E, and other safety standards.

Skills

Communication
Leadership
Knowledge of OSHA regulations
Ability to manage safety
Adaptability to new project sites

Education

OSHA 30 Certification
CHST or CSP Certification (preferred)

Job description

Traveling Electrical Site Safety Coordinator - Data Center Construction
Traveling Electrical Site Safety Coordinator - Data Center Construction

2 weeks ago Be among the first 25 applicants

Get AI-powered advice on this job and more exclusive features.

Direct message the job poster from Goliath Construction Consulting, Inc.

President / Founder - Goliath Construction Consulting | 727-437-7159 | Electrical Construction Recruiting

The Traveling Electrical Site Safety Coordinator – Data Center Construction to support large-scale electrical data center construction projects across the U.S. This position is critical in promoting and enforcing our client’s safety culture and ensuring full compliance with OSHA, NFPA 70E, and site-specific safety standards.

The ideal candidate thrives in fast-paced, high-tech construction environments, is comfortable working on the road, and is passionate about keeping people safe on mission-critical jobsites.

RESPONSIBILITIES

  • Serve as the on-site safety lead for electrical crews at data center construction projects.
  • Implement and maintain site-specific safety plans, in accordance with company and client requirements.
  • Conduct daily site inspections, toolbox talks, job hazard analysis (JHAs), and ensure proper PPE usage.
  • Investigate incidents, near-misses, and unsafe conditions; implement corrective actions.
  • Collaborate with project managers, superintendents, and subcontractors to promote a safe working environment.
  • Maintain safety documentation, including training records, audits, and inspection reports.
  • Ensure compliance with OSHA, NFPA 70E, and other applicable safety codes and regulations.
  • Support orientation and safety training for new hires and subcontractors on site.

QUALIFICATIONS

  • 3+ years of construction safety experience, preferably in electrical or data center environments
  • OSHA 30 required; CHST, CSP, or other safety certifications are a plus
  • Strong knowledge of OSHA regulations, NFPA 70E, and electrical safety protocols
  • Proven ability to manage safety on fast-paced, multi-trade construction sites
  • Excellent communication and leadership skills
  • Ability to travel full-time and adapt to new project sites quickly

COMPENSATION

  • Competitive hourly compensation
  • Per Diem and Travel Reimbursements
  • Comprehensive health, dental, and vision insurance.
  • Retirement savings plan with company match.
  • Opportunities for professional development and certification.
Seniority level
  • Seniority level
    Mid-Senior level
Employment type
  • Employment type
    Full-time
Job function
  • Job function
    Training, Management, and Strategy/Planning
  • Industries
    Construction, Electric Power Transmission, Control, and Distribution, and Building Construction

Referrals increase your chances of interviewing at Goliath Construction Consulting, Inc. by 2x

Inferred from the description for this job

Medical insurance

401(k)

Vision insurance

Disability insurance

Get notified when a new job is posted.

Sign in to set job alerts for “Safety Coordinator” roles.
Safety Officer $19.50/hr *(PLUS up to $1.50 in tenure increase)
Safety Officer $19.50/hr *(PLUS up to $1.50 in tenure increase)
Environmental Health Safety Specialist (EHS)

Atlanta Metropolitan Area $75,000.00-$85,000.00 22 hours ago

Atlanta | EMS, Fire & Water Safety Professionals for Production Sets
Atlanta | EMS, Fire & Water Safety Professionals for Production Sets
Atlanta | EMS, Fire & Water Safety Professionals for Production Sets
Atlanta | EMS, Fire & Water Safety Professionals for Production Sets

Lithia Springs, GA $70,000.00-$75,000.00 19 hours ago

Safety Technician/Coordinator - Paper Mill

Atlanta, GA $60,000.00-$65,000.00 3 weeks ago

Atlanta, GA $120,000.00-$150,000.00 1 week ago

Atlanta | EMS, Fire & Water Safety Professionals for Production Sets
Occupational Health & Safety (OHS) Program Manager

Atlanta, GA $65,000.00-$101,200.00 1 week ago

Forest Park, GA $115,000.00-$130,000.00 5 days ago

Environmental Health and Safety (EHS) Manager

We’re unlocking community knowledge in a new way. Experts add insights directly into each article, started with the help of AI.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Traveling Electrical Site Safety Coordinator - Data Center Construction
Traveling Electrical Site Safety Coordinator - Data Center Construction

Goliath Construction Consulting, Inc. • Auburn (AL)

On-site
USD 41,328 - 68,880
Health, dental, and vision insurance
Retirement plan with company match
Per Diem and travel reimbursements
+1
HSE Coordinator
HSE Coordinator

American Equipment • Austell (GA)

On-site
USD 70,000 - 75,000
Cigna Health Insurance
Dental and Vision Plans
401K Employer Match
+3
On-Site Safety Manager
On-Site Safety Manager

The Conlan Company • Atlanta (GA)

On-site
USD 50,893 - 58,000
Medical insurance
Vision insurance
401(k)
Site Safety Manager
Site Safety Manager

AIS Infrastructure • Douglasville (GA)

On-site
USD 40,000 - 45,000
401k with a Discretionary Company Match
Company Paid Life and AD&D policy
Paid Time Off (PTO)
Senior Site Safety and Health Officer
Senior Site Safety and Health Officer

HydroGeoLogic, Inc. • United States

Hybrid
USD 91,568 - 141,930
Career advancement opportunities
Flexible work environment
Mentoring and training programs
Safety Manager - Electrical Contractor | US-Wide Travel
Safety Manager - Electrical Contractor | US-Wide Travel

Metric Geo • United States

On-site
USD 100,000 - 135,000
Medical insurance
Vision insurance
401(k)
+1
Site Safety & Health Officer (SSHO)
Site Safety & Health Officer (SSHO)

Diversified Safety Services, LLC. • Washington, Baltimore (MD)

On-site
USD 80,000 - 90,000
Medical insurance
Vision insurance
Safety Coordinator
Safety Coordinator

IES Holdings • Sterling (VA)

On-site
USD 60,000 - 80,000
Safety Specialist (Full-Time/Salary)
Safety Specialist (Full-Time/Salary)

Tailing International, LLC • Washington

On-site
USD 90,000 - 140,000
Construction Regional Safety Engineer, DCPD Health and Safety
Construction Regional Safety Engineer, DCPD Health and Safety

Amazon Web Services (AWS) • Denver (CO)

On-site
USD 109,000 - 185,000
Inclusive team culture
Mentorship and career growth opportunities
Work-life harmony