Técnico de Montaje y Proceso de Plásticos, 2º Turno

Quad 4 Production Llc

Elkhart (IN)

On-site

USD 22,041 - 30,307

Full time

14 days+
Application generator

A complete application in a minute — tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

401(k)
401(k) matching
Paid time off
Dental insurance
Health insurance
Vision insurance

Job summary

Quad 4 Production Llc is seeking a Set Up & Process Technician for the 2nd shift (Mon-Thu 1-10pm; Fri 1-5pm). You will install molds, prep materials, and maintain production equipment to ensure smooth manufacturing operations.

Responsibilities include cleaning and changeovers, responding to alarms, reporting issues to the Plant Manager, and maintaining tool and machine condition. Strong communication and adherence to policies are essential.

Responsibilities

  • Installing the correct molds/inserts into the correct machines
  • Prepping and mixing raw materials for production
  • Cleaning dryers
  • Cleaning grinders
  • Cleaning machine hoppers
  • Cleaning machine off; put all tools away after changeover
  • Using the correct tools for the job
  • Answering machine alarms
  • Identifying and reporting issues and potential issues to the Plant Manager
  • Changing tools over according to which model is needed
  • Fixing part defects
  • Fixing machine faults
  • Adding oil and lubricating fluid to machines as needed
  • Changing machine fan filters
  • Comply with all company policies and procedures
  • Provide support to meet department and company objectives
  • Able to communicate effectively and respectfully with all other personnel

Job description

Quad 4 Production Llc is seeking a Set Up & Process Technician for the 2nd shift (Mon-Thu 1-10pm; Fri 1-5pm). You will install molds, prep materials, and maintain production equipment to ensure smooth manufacturing operations.

Responsibilities include cleaning and changeovers, responding to alarms, reporting issues to the Plant Manager, and maintaining tool and machine condition. Strong communication and adherence to policies are essential.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Injection Mold Setup Tech – 2nd Shift, Growth & Benefits
Injection Mold Setup Tech – 2nd Shift, Growth & Benefits

Quad 4 Production Llc • Elkhart (IN)

On-site
USD 42,000 - 54,000
401(k)
401(k) matching
Paid time off
+3
Técnico de montaje/montaje de moldes, Plásticos en el segundo turno
Técnico de montaje/montaje de moldes, Plásticos en el segundo turno

Quad 4 Production Llc • Elkhart (IN)

On-site
USD 22,041 - 30,307
401(k)
401(k) matching
Paid time off
+3
Technician Plastics Injection Mold Setter Set Up Process 2nd Shift
Technician Plastics Injection Mold Setter Set Up Process 2nd Shift

Quad 4 Production Llc • Elkhart (IN)

On-site
USD 42,000 - 54,000
401(k)
401(k) matching
Paid time off
+3
Lead Process Tech – Plastic Injection Molding (2nd Shift)
Lead Process Tech – Plastic Injection Molding (2nd Shift)

Pmm---America • South Bend (IN)

On-site
USD 48,000 - 64,000
401(k)
401(k) matching
Dental insurance
+7
Night Shift Plastics Process Technician
Night Shift Plastics Process Technician

gpac • Sioux Falls (SD)

On-site
USD 52,000 - 72,000
Molding Set-Up Technician - Afternoon Shift
Molding Set-Up Technician - Afternoon Shift

Woodbridge Group • Chattanooga (TN), Northern (KY)

Hybrid
USD 21,000 - 30,000
2nd shift Process technician
2nd shift Process technician

gpac • Sioux Falls (SD)

On-site
USD 52,000 - 72,000
Plastics Process Technician
Plastics Process Technician

Torrey Holistics • Aurora (IL)

On-site
USD 45,000 - 75,000
Plastic Injection Mold Process Technician - 1st to 3rd Shift
Plastic Injection Mold Process Technician - 1st to 3rd Shift

Staffing Inc. • Grand Rapids (MI)

On-site
USD 52,000 - 74,000
Process Technician (2nd or 3rd shift)
Process Technician (2nd or 3rd shift)

Rosti Group • Cary (NC)

On-site
USD 40,000 - 60,000