Substitute School Bus Driver - Part-Time Impact on Students

Young World Physical Education

Danville (KY)

Vor Ort

USD 17.000 - 25.000

Teilzeit

14 Tage+

Erhalte eine Antwort von diesem Arbeitgeber

Dein Lebenslauf und dein Anschreiben, genau auf das zugeschnitten, was gesucht wird.

Schaffe es an den ATS-Filtern vorbei

Zusammenfassung

Boyle County Schools in Danville, KY seeks a Substitute Bus Driver for the 2026-2027 school year to safely transport students on designated routes, adhere to time schedules, and perform daily vehicle inspections.

This part-time position requires a high school diploma or GED, a valid Kentucky CDL Class B with passenger endorsement and School Bus Certificate, and the ability to pass background checks and drug tests.

Qualifikationen

  • High school diploma or GED required by Kentucky law.
  • Valid Kentucky CDL Class B with passenger endorsement and School Bus Certificate.
  • Must pass driving record check, annual CDL physical and drug test.

Aufgaben

  • Drive a school bus on designated routes according to schedules and regulations.
  • Pick up and discharge students in varying weather at established stops.
  • Maintain bus in safe operating condition through daily inspections.
  • Communicate with school officials, parents, and the public.
  • Transport mentally and physically handicapped students as needed.
  • Observe policies and guidelines; maintain records of maintenance and incidents.
  • Attend required safety meetings and update trainings.

Kenntnisse

Safety-conscious
Good communication

Ausbildung

High school diploma or GED

Tools

CDL Class B with Passenger Endorsement
School Bus Certificate

Jobbeschreibung

Boyle County Schools in Danville, KY seeks a Substitute Bus Driver for the 2026-2027 school year to safely transport students on designated routes, adhere to time schedules, and perform daily vehicle inspections.

This part-time position requires a high school diploma or GED, a valid Kentucky CDL Class B with passenger endorsement and School Bus Certificate, and the ability to pass background checks and drug tests.

Hol dir deinen kostenlosen, vertraulichen Lebenslauf-Check.

oder ziehe deine Datei hierhin.

Similar jobs

Ähnliche Jobs, die dir auch gefallen könnten

Substitute Bus Driver (2026-2027)
Substitute Bus Driver (2026-2027)

Young World Physical Education • Danville (KY)

Vor Ort
USD 17.000 - 25.000
School Bus Driver - Safe Transit for Students
School Bus Driver - Safe Transit for Students

Young World Physical Education • Bowling Green (KY)

Vor Ort
USD 26.000 - 29.000
Substitute School Bus Driver — Safe Routes & Impact
Substitute School Bus Driver — Safe Routes & Impact

LaRue County Schools • Hodgenville (KY)

Vor Ort
USD 25.000 - 35.000
Immediate-Start School Bus Driver (Substitute)
Immediate-Start School Bus Driver (Substitute)

Bus Garage • Beattyville (KY)

Vor Ort
USD 32.000 - 42.000
Dynamic School Bus Driver - Substitute
Dynamic School Bus Driver - Substitute

Bus Garage • New Castle (KY)

Vor Ort
USD 30.000 - 40.000
Substitute Bus Driver-Districtwide
Substitute Bus Driver-Districtwide

Hart County Schools • USA

Vor Ort
USD 10.000 - 14.000
Part-Time Substitute School Bus Driver - Immediate Start
Part-Time Substitute School Bus Driver - Immediate Start

Young World Physical Education • Campbellsville (KY)

Vor Ort
USD 20.664 - 27.552
Part-Time School Bus Sub Driver: Safe Student Transport
Part-Time School Bus Sub Driver: Safe Student Transport

District Wide • Russellville (KY)

Vor Ort
USD 21.000 - 30.000
Part-Time School Bus Substitute Driver — Safe Transport
Part-Time School Bus Substitute Driver — Safe Transport

Young World Physical Education • Whitley City (KY)

Vor Ort
USD 20.664 - 24.796
Reliable Part-Time School Bus Driver (Substitute)
Reliable Part-Time School Bus Driver (Substitute)

Young World Physical Education • Alexandria (KY)

Vor Ort
USD 13.000 - 23.000