Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Markent Personnel

Houston (TX)

On-site

USD 110,000 - 160,000

Full time

10 days ago

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

Competitive salary
Per diem for travel
Medical, dental, and vision insurance
401(k) with company matching
HSAs/FSAs
Long-term disability benefits

Job summary

Markent Personnel, Inc. seeks a Sr. Electrical Estimator for industrial EPC and data center construction in Houston, TX. This fully onsite role supports large-scale projects nationwide, collaborating with engineering, procurement, and construction teams to produce accurate, competitive estimates.

Ideal candidates have strong electrical construction estimating backgrounds, proficiency in Excel, and familiarity with estimating software. Prior data center experience is a plus but not required.

Qualifications

  • Electrical construction estimating experience within industrial, commercial, EPC, or mission-critical sectors.
  • Ability to interpret electrical drawings, specifications and construction documents.
  • Knowledge of electrical materials, installation methods and labor requirements.
  • Experience with quantity takeoffs, cost estimating, and subcontractor bid evaluations.
  • Proficiency in Microsoft Excel; familiarity with Bluebeam, McCormick, Accubid or similar estimating software.
  • Strong analytical, organizational, and communication skills.
  • Bachelor's degree in Engineering, Construction Management, or related field preferred, not required.
  • Data center construction experience is a plus, not required.
  • Ability to travel nationwide as needed.

Responsibilities

  • Prepare detailed electrical and instrumentation estimates for complex construction projects.
  • Review drawings, specs, and bid documents to determine project scope and requirements.
  • Perform quantity takeoffs and calculate material, labor, equipment, and subcontractor costs.
  • Evaluate supplier and subcontractor quotations for accuracy and competitiveness.
  • Collaborate with engineering, procurement, and construction teams throughout the bidding process.
  • Analyze labor productivity, material pricing, and project-specific cost considerations.
  • Participate in pre-bid meetings, site visits, and project walkdowns.
  • Develop proposal documentation and final bid packages.
  • Maintain historical cost data and support improvements in estimating accuracy.

Skills

Electrical estimating
Quantity takeoffs
Excel proficiency
Estimating software
Analytical skills

Education

Bachelor's degree in Engineering/Construction Management or related field

Tools

Bluebeam
McCormick
Accubid

Job description

Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Location: Houston, TX

Fully onsite. 40-45 hours week M - F.

Position Overview

We are seeking an experienced Electrical Estimator to support a growing portfolio of large-scale construction projects, primarily within the rapidly expanding data center market. Additional projects span the chemical, petrochemical, oil and gas, and other heavy industrial sectors.

This position offers the opportunity to work on complex electrical construction projects nationwide, collaborating with engineering, procurement, and construction teams to develop accurate and competitive estimates.

Prior data center experience is not required. We are interested in electrical estimators with strong technical construction backgrounds who can bring their expertise to this growing sector.

Key Responsibilities
  • Prepare detailed electrical and instrumentation estimates for complex construction projects.

  • Review drawings, specifications, and bid documents to determine project scope and requirements.

  • Perform quantity takeoffs and calculate material, labor, equipment, and subcontractor costs.

  • Evaluate supplier and subcontractor quotations for accuracy and competitiveness.

  • Collaborate with engineering, procurement, and construction teams throughout the bidding process.

  • Analyze labor productivity, material pricing, and project-specific cost considerations.

  • Participate in pre-bid meetings, site visits, and project walkdowns.

  • Develop proposal documentation and final bid packages.

  • Maintain historical cost data and support improvements in estimating accuracy.

Qualifications
  • Electrical construction estimating experience within industrial, commercial, EPC, or mission-critical construction.

  • Ability to interpret electrical drawings, specifications, and construction documents.

  • Knowledge of electrical materials, installation methods, and construction labor requirements.

  • Experience with quantity takeoffs, cost estimating, and subcontractor bid evaluations.

  • Proficiency in Microsoft Excel; familiarity with Bluebeam, McCormick, Accubid, or similar estimating software preferred.

  • Strong analytical, organizational, and communication skills.

  • Bachelor's degree in Engineering, Construction Management, or a related field preferred, not required.

  • Data center construction experience is a plus, not required.

  • Ability to work independently and travel nationwide as needed.

Compensation & Benefits
  • Competitive salary based on experience.

  • Competitive per diem for project-related travel.

  • Comprehensive medical, dental, and vision insurance.

  • 401(k) with immediate company matching and vesting.

  • Health savings and flexible spending account options.

  • Short-term and long-term benefits.

  • Employee discount programs.

Why Consider This Opportunity?

Join an established engineering and construction organization expanding its presence in the data center market. Apply your electrical estimating expertise to major infrastructure projects, nationwide project opportunities, and the resources of a well-established organization.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Eden Capital Careers • Houston (TX)

On-site
USD 110,000 - 170,000
Medical, dental, and vision insurance
401(k) with company matching
Per diem for travel
+1
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Accounting Search • Houston (TX)

On-site
USD 110,000 - 150,000
Competitive salary
Per diem for travel
Medical, dental, vision insurance
+4
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Talent Solutions Partners • Houston (TX)

On-site
USD 110,000 - 160,000
Medical, dental, vision insurance
401(k) with company match
Per diem for travel
+1
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Top Echelon Software, LLC • Houston (TX)

On-site
USD 95,000 - 130,000
Competitive salary based on experience
Per diem for project travel
Medical, dental, vision insurance
+1
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Horan Hiring Solutions, LLC • Houston (TX)

On-site
USD 110,000 - 170,000
Competitive salary
Project per diem
Medical, dental, vision insurance
+3
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Ashton North LLC • Houston (TX)

On-site
USD 90,000 - 130,000
Competitive salary
Per diem for travel
Medical, dental, and vision insurance
+2
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Modern Machining Solutions Inc • Houston (TX)

On-site
USD 120,000 - 180,000
Competitive salary
Per diem
Health insurance
+3
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Aspire Talent Solutions • Houston (TX)

On-site
USD 90,000 - 130,000
Medical insurance
Dental and vision
401(k) with company match
+1
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Joseph Michaels International • Houston (TX)

On-site
USD 110,000 - 150,000
Competitive salary
Per diem for travel
Medical, dental, and vision insurance
+4
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

MDS Staffing • Houston (TX)

On-site
USD 110,000 - 150,000
Medical, dental, vision insurance
Per diem for travel
401(k) with company match
+3