Senior Manager, Data Center Construction

Galaxy

Afton (TX)

On-site

USD 170,000 - 250,000

Full time

7 days ago
Be an early applicant

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

Competitive base salary and bonus
Paid Time Off
Health and protective benefits
Company-paid holidays
401(k) contribution
Headspace coaching
In-office snacks and meals
Learning opportunities
Employee Resource Groups

Job summary

Galaxy's Helios campus in Afton, TX seeks a Senior Manager, Data Center Construction to lead on-site delivery of a large-scale data center. You will manage Galaxy teams and key trade partners, driving safety, schedule, cost, and quality from preconstruction through commissioning.

The ideal candidate has 7+ years delivering mission-critical facilities, understands GMP, and is proficient with Procore, Primavera P6, Bluebeam and SharePoint.

Qualifications

  • Delivery of large-scale data center or equivalent infrastructure from start of construction through turnover.
  • Experience leading a project or building team through construction.
  • Knowledge of GMP delivery models, risk management, and contractor oversight.
  • Technical fluency across MEP, commissioning, civil, and structural systems.
  • Experience integrating OFCI equipment and supporting commissioning.
  • Strong cost control, change management, and schedule analysis.
  • Familiarity with Procore, Primavera P6, Bluebeam, and SharePoint.

Responsibilities

  • Own Data Center Facility Delivery: single point of accountability for construction of a large-scale data center facility from GMP handoff through energization and turnover.
  • Manage Schedule and Progress: own building schedule, identify critical-path threats, direct recovery plans.
  • Manage Project Risk and Contingency: maintain a quantified risk register and drive mitigation before exposure.
  • Drive Safety Culture: enforce Galaxy's safety standards at the building level and partner with EHS.
  • Oversee Contractors and Trade Partners: manage relationships with GC and key trades, ensure milestone alignment.
  • Control Cost and Change: oversee pay apps, change orders, forecasts, and budget tracking.
  • Lead Integrated Project Controls and Forecasting: own cost, schedule, and cash flow forecast monthly.
  • Administer the Commercial Framework: manage GMP contracts, notices, allowances, and claims.
  • Manage OFCI Integration: coordinate with OFCI teams to ensure timely arrival and installation of equipment.
  • Drive Utility and Energization Readiness: align power delivery with construction milestones.
  • Lead Commissioning and Turnover: work with commissioning manager for testing and turnover.
  • Manage Customer Delivery Commitments: ensure ready-for-service dates and handover meet commitments.
  • Ensure Quality: enforce QA/QC standards and resolve systemic issues.
  • Coordinate Across the Campus: resolve cross-building conflicts with peers and VP.
  • Advance Lean and Prefabrication: apply modularization and lean delivery initiatives.

Skills

Data center construction leadership
Facility delivery
GMP knowledge
Cost control
Schedule analysis
Vendor management

Education

Bachelor's degree in Construction Management/Engineering/Architecture

Tools

Procore
Primavera P6
Bluebeam
SharePoint

Job description

Senior Manager, Data Center Construction

Afton, Texas

Who We Are:

Galaxy Digital Inc. (Nasdaq: GLXY) is a global leader in digital assets and data center infrastructure, growing the economy that runs on code. Galaxy delivers the onchain infrastructure that connects institutions to digital assets, including trading, advisory, asset management, staking, self-custody, and tokenization. Galaxy also develops and operates data center infrastructure to power AI and HPC workloads. Anchored by its Helios campus in Texas, Galaxy is building a multi-gigawatt pipeline of more than 5.7 GW of potential capacity, positioning it among the largest and fastest-growing data center developers in North America.

The Company is headquartered in New York City, with offices across North America, Europe, the Middle East, and Asia.

Additional information about Galaxy's businesses and products is available on www.galaxy.com .

What We Value:

We are a diverse team of free thinkers, and fast movers united to help investors and creators energize the global economy. We are looking for individualswhothrive in a culture of builders and overachieversandembrace high performance, transparent feedback, and a mission-first approach. Our culture shapes our way of working and gets us where we want to be.

  • Be Selective To Be Effective.
  • Be Highly Aligned, Loosely Coupled.
  • Disagree Transparently.
  • Build Dream Teams.
Who You Are:

You are a hands-on construction leader who has delivered large-scale, mission-critical data center or comparable infrastructure from start of construction through commissioning and turnover. You know what it takes to run a major building on a live campus: sequencing trades, protecting the schedule, and keeping safety and quality from becoming trade-offs. You lead teams from the front, hold contractors and partners to a high standard, and raise issues early and honestly. You are equally comfortable walking the building with a superintendent and presenting schedule, cost, and risk to senior leadership. You believe the digital economy depends on infrastructure delivered right, and delivered on time.

What You'll Do:

As Senior Manager, Data Center Construction at Galaxy's Helios campus in Afton, TX, you will be Galaxy's accountable leader for construction of a large-scale data center building on the campus. You will report to the VP, Campus Construction Manager and work alongside peer Senior Managers who each own a building or scope, with shared accountability for the safety, schedule, cost, and quality standards that keep the campus aligned. You will own your building from preconstruction handoff through commissioning and turnover to operations, and you will lead the on-site Galaxy team and contractor relationships that make it happen.

Key Responsibilities:
  • Own Data Center Facility Delivery: Serve as the single point of accountability for construction of a large-scale data center facility, from GMP handoff through energization, Level 1-5 commissioning, integrated systems testing (IST), and turnover to operations. Drive the facility to its safety, schedule, cost, and quality commitments.
  • Manage Schedule and Progress: Own the building schedule and track progress against baseline. Identify critical-path threats early, and direct recovery and mitigation plans before they affect milestones. Provide clear schedule inputs to the campus master schedule.
  • Manage Project Risk and Contingency: Maintain a quantified risk register covering schedule, cost, supply chain, labor, weather, and trade-interface risks. Control owner contingency drawdown, run structured risk reviews with the GC and trade partners, and drive mitigation before exposure becomes impact.
  • Drive Safety Culture: Set and enforce Galaxy's safety standards at the building level. Partner with Galaxy EHS and contractor safety leadership to sustain a zero-incident environment, and hold the team accountable for leading indicators as well as outcomes.
  • Oversee Contractors and Trade Partners: Manage the day-to-day and executive-level relationship with the general contractor and key trade partners. Ensure alignment on milestones, quality, safety, staffing, and commercial performance, and raise issues early.
  • Control Cost and Change: Oversee pay applications, change orders, forecasts, and budget tracking for your building under the GMP. Enforce disciplined change management and provide accurate cost reporting to campus and executive leadership.
  • Lead Integrated Project Controls and Forecasting: Own the facility's integrated cost, schedule, and cash flow forecast on a monthly cycle. Validate GC-reported progress against independent percent-complete and earned value analysis, report cost-to-complete and forecast variances, and give development and finance leadership a reliable view of capital deployment and funding requirements.
  • Administer the Commercial Framework: Administer the GMP agreement and related owner contracts, including notices, allowances, buyout and savings, delay and impact claims, backcharges, retainage, and lien waivers. Protect Galaxy's commercial position and resolve disputes at the lowest level possible, partnering with Legal as needed.
  • Manage OFCI Integration: Work closely with Pre-Construction and the OFCI procurement and logistics teams to ensure UPS, generators, chillers, switchgear, and other owner-furnished equipment arrive, are set, and are installed without impacting the construction schedule.
  • Drive Utility and Energization Readiness: Coordinate with the serving utility, interconnect and substation teams, and Galaxy's power development group to align permanent power availability, energization sequencing, and test windows with construction and commissioning milestones. Treat power delivery as a critical-path item and elevate early.
  • Lead Commissioning and Turnover: Partner with the on-site commissioning manager, 3rd party Cx agent, and operations teams to ensure systematic testing, closeout, and clean turnover of the building to operations.
  • Manage Customer Delivery Commitments: Serve as the construction lead for customer-facing delivery milestones, including ready-for-service dates. Ensure facility handoff meets contractual commitments and the customer's acceptance criteria.
  • Ensure Quality: Enforce Galaxy's QA/QC standards on your building. Escalate and resolve systemic quality issues with contractors and design partners.
  • Coordinate Across the Campus: Work with peer Senior Managers and the VP to resolve cross-building conflicts in resources, laydown, site logistics, access, utilities, and sequencing.
  • Advance Lean and Prefabrication: Apply Galaxy's modularization, prefabrication, and lean delivery initiatives on your building, and capture lessons learned so each building is more repeatable than the last.
  • Manage Regulatory and Inspection Requirements: Work with local authorities, inspectors, utilities, and consultants to ensure compliance with codes and permit requirements.
  • Report to Leadership: Provide frequent, candid status updates to senior leadership and communicate building status, risks, and forecasts to internal stakeholders across Pre-Construction, Design Engineering, Operations, and Security.
What We're Looking For:
  • Bachelor's degree in Construction Management, Engineering, Architecture, or equivalent experience.
  • 7+ years of experience delivering large-scale mission-critical projects, with at least 3 years in a senior role leading a project or building team through construction.
  • Demonstrated success delivering a data center, or comparable mission-critical facility, from start of construction through commissioning and turnover.
  • Working knowledge of construction delivery models (including GMP), risk management, and contractor oversight.
  • Technical fluency across MEP, commissioning, civil, and structural systems.
  • Experience integrating OFCI equipment and supporting commissioning.
  • Strong command of cost control, change management, and schedule analysis.
  • Familiarity with Procore, Primavera P6, Bluebeam, and SharePoint.
What You Bring:
  • A track record of leading and developing high-performing construction teams.
  • Excellent communication skills and the ability to influence technical and executive stakeholders.
  • Sound judgment under pressure and a bias toward early, honest escalation.
  • A commitment to safety, quality, and executional excellence.
  • A passion for building world-class infrastructure that supports the growth of the digital economy.
What We Offer:
  • Competitive base salary and discretionary bonus
  • Paid Time Off
  • Company-paid health and protective benefits for employees, partners, and other dependents
  • Company Paid Holidays (11)
  • 3% 401(k) company contribution
  • Free virtual coaching and counseling sessions through Headspace
  • Opportunities to learn about the Crypto industry
  • Free daily snacks and weekly meal in-office
  • Smart, entrepreneurial, and fun colleagues
  • Employee Resource Groups

Galaxy respects diversity and seeks to provide equal employment opportunities to all employees and job applicants for employment without regard to actual or perceived age, race, color, creed, religion, sex or gender (including pregnancy, childbirth, lactation and related medical conditions), gender identity or gender expression (including transgender status), sexual orientation, marital or partnership or caregiver status, ancestry, national origin, citizenship status, disability, military or veteran status, protected medical condition as defined by applicable state or local law, genetic information or predisposing genetic characteristic, or other characteristic protected by applicable federal, state, or local laws and ordinances.

We will endeavor to make a reasonable accommodation to the known limitations of a qualified applicant with a disability unless the accommodation would impose an undue hardship on the operation of our business. If you believe you require such assistance to complete the application process or to participate in an interview, please contact careers@galaxy.com.

Collecting diversity data from colleagues is a well-established way to track and encourage improvement in diversity. We are asking you to provide this information on a voluntary basis to help us inform our recruiting practices and policies. It is entirely your choice if you choose to provide this information. Your managers will not have access to your responses.

GENDER/SEXUAL ORIENTATION

Our company does not discriminate on the basis of sexual orientation, gender identity, or gender expression. But to track the effectiveness of our recruiting efforts and ensure we consider the needs of all our employees, please consider the following optional questions.

Transgender is an umbrella term that refers to people whose gender identity, expression or behavior is different from those typically associated with their assigned sex at birth. Other identities considered to fall under this umbrella can include non-binary, gender fluid, and genderqueer - as well as many more.

Your voluntary cooperation is appreciated. Thank you.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

VP, Campus Construction Manager
VP, Campus Construction Manager

Galaxy • Afton (TX)

On-site
USD 250,000 - 350,000
Competitive base salary
Discretionary bonus
Hybrid/flexible working
+4
VP - Campus Construction Manager
VP - Campus Construction Manager

Crypto Pro Network • Dallas (TX)

On-site
USD 90,000 - 120,000
Competitive base salary
Paid Time Off
Company-paid health benefits
+3
Data Center Business Operations Manager
Data Center Business Operations Manager

Galaxy • New York (NY)

On-site
USD 129,000 - 207,000
Competitive base salary
Discretionary bonus
Company paid health benefits
+3
Project Controls Manager (Data Center Construction)
Project Controls Manager (Data Center Construction)

Galaxy • Dallas (TX)

Hybrid
USD 120,000 - 180,000
Health benefits
401(k) contribution
Ginger coaching
Electrical Engineering Lead
Electrical Engineering Lead

Crypto Pro Network • Dallas (TX)

On-site
USD 120,000 - 150,000
Competitive base salary
Flexible Time Off
Company paid health benefits
+2
Manager, Environmental Health & Safety (Data Centers)
Manager, Environmental Health & Safety (Data Centers)

Precision Labs • Texas

Hybrid
USD 110,000 - 150,000
Competitive salary
Discretionary bonus
Paid time off
+7
Senior Mechanical Engineer (Data Centers)
Senior Mechanical Engineer (Data Centers)

Galaxy • Dallas (TX)

Hybrid
USD 120,000 - 160,000
Competitive base salary
Discretionary bonus
Company-paid health benefits
+3
Mechanical Engineering Lead
Mechanical Engineering Lead

Crypto Pro Network • Dallas (TX)

On-site
USD 180,000 - 240,000
Competitive base salary
Discretionary bonus
Company paid sick leave
+5
Manager, Warehouse Operations (Data Center)
Manager, Warehouse Operations (Data Center)

Crypto Pro Network • Texas

On-site
USD 60,000 - 80,000
Competitive base salary and discretionary bonus
Paid Time Off
Company-paid health and protective benefits
+2
Vice President, Site Reliability Engineer (Automation & Network Focus)
Vice President, Site Reliability Engineer (Automation & Network Focus)

Crypto Pro Network • Dallas (TX)

On-site
USD 150,000 - 200,000
Competitive base salary
Company paid sick leave
Health benefits
+3