Senior Manager, Construction Change Orders

Massachusetts Bay Transportation Authority

Boston (MA)

Vor Ort

USD 120.000 - 160.000

Vollzeit

Vor 5 Tagen
Sei unter den ersten Bewerbenden

Eine vollständige Bewerbung in einer Minute

Maßgeschneiderter Lebenslauf und Anschreiben – versandbereit.

Schaffe es an den ATS-Filtern vorbei

Zusammenfassung

Massachusetts Bay Transportation Authority (MBTA) seeks a Senior Manager of Change Order Management to guide contract change actions on major transit projects. This role provides technical advice on work directives, change orders, risk reallocations, and claims, coordinating with PMIS, CMS, and FMIS.

Responsibilities include supervising analysts, developing procedures, reporting to leadership, and training staff to ensure compliance with MBTA standards and procurement rules.

Qualifikationen

  • Bachelor's degree in Engineering, Construction Management, Building Construction, Architecture or related field.
  • Five (5) years of experience in contract management and/or administration for heavy construction or transit projects.
  • Two (2) years related managerial, supervisory, or leadership experience.
  • Strong organizational, analytical, confidentiality, multi-tasking, and time management skills.
  • Experience using estimating software applications.
  • Proficiency in MS Word, Excel, PowerPoint, SharePoint and database applications.
  • Excellent customer service and conflict resolution skills.
  • Ability to travel to MBTA worksites, offices, and locations.
  • Ability to supervise and work with a diverse workforce.

Aufgaben

  • Direct supervision of Senior Change Order Analysts, Change Order Analysts, Senior Project Coordinators and Project Coordinators.
  • Provide technical advice and support for change orders, risk reallocations, and time extensions.
  • Develop and implement policy changes and SOPs for change order processing.
  • Coordinate interfaces between PMIS, CMS, and FMIS for seamless actions.
  • Generate Change Order reports for leadership on a regular basis.
  • Assist with negotiations, settlements, and documentation of scope changes.
  • Train project managers and staff on MBTA policies and procedures.
  • Review change orders for compliance with contracts and specs.
  • Maintain filing systems and ensure MBTA systems reflect updates.
  • Support audits and reporting periods with accurate documentation.

Kenntnisse

Leadership
Analytical skills
MS Word
Excel
PowerPoint
SharePoint
Communication
Conflict resolution
Time management
Customer service
Interpersonal skills
Traveling

Ausbildung

Bachelor's Degree in Engineering/Construction/Building Construction/Architecture

Tools

e-Builder
CMS
FMIS
Estimating software

Jobbeschreibung

Contract Services is responsible for the procurement and administration of professional services and construction contracts, including alternative delivery methods such as Construction Management at Risk and Design Build. The group supports the MBTA's multi-billion-dollar Capital Investment Plan (CIP) throughout the full delivery lifecycle, from contract procurement, contract administration including management of contract changes and amendments, invoice review and payment processing, dispute resolution to contract closeout.

The Senior Manager of Change Order Management will assist the Director of Change Order Management to provide technical advice and support to project delivery teams in matters of construction contract change management, including but not limited to Work Directives, change orders, risk reallocations, construction quantity variances, contract time extensions, and claims.

  • Work closely with the Director of Contractor Change Management to assist in managing the MBTA Capital Programs Change Order group.
  • Assist the Director of Change Management with staff hiring department organization, workflow, and policy development for processing construction change orders on MBTA contracts.
  • Review, update and support the implementation of MBTA policies and procedures, including Change Order Manual and Standard Operating Procedures (SOPs), to ensure that all construction contract change actions, including work directives, change orders, risk reallocations, construction quantity variances, time extensions, and claims are being processed according to all MBTA Standard Specifications and MBTA Change Order guidelines.
  • Coordinate the interface of MBTA Project Management Information Systems (PMIS), Capital Management System (CMS), and PeopleSoft (FMIS) to ensure seamless integration of contractor change actions.
  • Manage and update staff assignments to balance workload responsibilities.
  • Provide Change Order reports derived from all data management systems to the Director of Contractor Change Management weekly, monthly or as otherwise requested.
  • Assist the Director of Contractor Change Management in overseeing claims consultants
  • Assist change order and project staff in the review, analysis, negotiations, and resolution of complex change order issues and problems.
  • Assist with the training of Project Managers and staff for compliance with MBTA policies, procedures, and protocols of construction change management.
  • Review, analyze, and recommend necessary revisions to proposed change order costs including Collective Bargaining Agreements and prevailing wage rates, labor production indexes, materials, equipment, overhead costs and profit factors for compliance with contract specifications and standard industry practice.
  • Attend job meetings as required and visit job sites and field offices to obtain first-hand knowledge of complex projects, base contract, and change order scopes of work.
  • Provide support for negotiations with contractors and presentation of proposal analysis, documenting all steps of negotiations and outcome.
  • Write a comprehensive record of negotiations and explanation of why additional work is necessary.
  • Review specifications and drawings and confirm that the requested work is not in the bid design.
  • Review all subordinate work product to ensure that the information presented in construction change order packages is accurate.
  • Proactively resolve problem issues and expedite the change order process.
  • Draft internal memos and correspondence on policy issues as required.
  • Oversee the maintenance of departmental filing system for change order records and documents.
  • Maintain up-to-date policy and form documents, ensuring all changes are integrated into the MBTA’s systems and relevant internal and external websites. Support Capital Programs departments during audits and other reporting period evaluations.
  • Respond to each inquiry, whether from a customer, vendor, or co-worker in a professional and courteous manner.
  • Uphold the rights and interests of the Authority while building and maintaining an effective relationship with employees.
  • Manage the workforce by ensuring fair and consistent application and strict adherence to the rules, regulations, collective bargaining agreements (if applicable) and policies of the Authority including the EEO, Anti-Discrimination and Anti-Harassment and Anti-Retaliation policies.
  • Perform all other duties and projects that may be assigned.

Additional responsibilities may include focus on one or more departments or locations. See applicable addendum for department or location specific functions.

Supervision
  • Direct supervision of Senior Change Order Analysts, Change Order Analysts, Senior Project Coordinators and Project Coordinators.
  • A Bachelor's Degree from an accredited institution in Engineering, Construction Management, Building Construction, Architecture, or related field.
  • Five (5) years of experience in contract management and/or administration including the preparation and review of change orders for heavy construction or transit industry construction projects.
  • Two (2) years related experience in a managerial, supervisory, or leadership capacity.
  • Effective organizational, analytical, confidentiality, multi-tasking, time management and interpersonal skills.
  • Experience utilizing estimating software applications.
  • Proficient in MS Word, Excel, PowerPoint, SharePoint, and database applications.
  • Excellent customer service and conflict resolution skills.
  • Demonstrated ability to comprehend and communicate effectively with customers, employees, and vendors.
  • The ability to provide internal and external customers with a courteous and professional experience.
  • Ability to travel to various MBTA worksites, offices, and locations.

  • The ability to supervise and work effectively with a diverse workforce.
Substitutions
  • A High School Diploma or GED with an additional seven (7) years of directly related experience substitutes for the Bachelor’s degree requirement.
  • An Associate’s degree from an accredited institution with an additional three (3) years of directly related experience substitutes for the Bachelor’s degree requirement.
  • A Master’s degree in a related subject substitute for two (2) years of general experience.
  • A nationally recognized certification, or statewide/professional certification in a related field substitutes for one year of experience
  • A Master's Degree from an accredited institution in Construction Management, Building Construction, Public Administration, Engineering, or Architecture.
  • Ten (10) years of experience in contract management and/or administration including the preparation and review of change orders for heavy construction or transit industry construction projects.
  • Five (5) years related experience in a managerial, supervisory, or leadership capacity.
  • Construction change order experience in the transit industry.
  • Prior management experience of contract administration or change order staff.
  • Working knowledge of e-Builder, CMS and FMIS.
Hol dir deinen kostenlosen, vertraulichen Lebenslauf-Check.

oder ziehe deine Datei hierhin.

Similar jobs

Ähnliche Jobs, die dir auch gefallen könnten

Senior Manager, Construction Change Orders
Senior Manager, Construction Change Orders

Massachusetts Bay Transportation Authority (MBTA) • Boston (MA)

Vor Ort
USD 140.000 - 190.000
Director of Construction Change Order Management
Director of Construction Change Order Management

Massachusetts Bay Transportation Authority • Boston (MA)

Vor Ort
USD 120.000 - 170.000
Senior Manager, Construction Change Orders & Programs
Senior Manager, Construction Change Orders & Programs

Massachusetts Bay Transportation Authority (MBTA) • Boston (MA)

Vor Ort
USD 140.000 - 190.000
Assistant Project Manager I
Assistant Project Manager I

Massachusetts Bay Transportation Authority (MBTA) • Boston (MA)

Vor Ort
USD 80.000 - 120.000
Deputy Director of Facilities & Structures
Deputy Director of Facilities & Structures

IFMA Boston • Massachusetts

Vor Ort
USD 120.000 - 180.000
Senior Construction Change Order Manager
Senior Construction Change Order Manager

Massachusetts Bay Transportation Authority (MBTA) • Boston (MA)

Vor Ort
USD 120.000 - 160.000
Director, Capital Programs (Green Line Transformation)
Director, Capital Programs (Green Line Transformation)

Massachusetts Bay Transportation Authority • Boston (MA)

Vor Ort
USD 150.000 - 190.000
Director, Capital Programs (Green Line Transformation)
Director, Capital Programs (Green Line Transformation)

MBTA • Boston (MA)

Vor Ort
USD 180.000 - 270.000
Senior Project Manager, Better Bus Network
Senior Project Manager, Better Bus Network

MBTA • Boston (MA)

Vor Ort
USD 130.000 - 180.000
Commuter Rail Senior Project Coordinator
Commuter Rail Senior Project Coordinator

Massachusetts Bay Transportation Authority • Boston (MA)

Vor Ort
USD 70.000 - 100.000