Turn this role into an interview — a resume and cover letter built around what this employer wants.
FST Technical Services is seeking a Senior Electrical Commissioning Project Engineer to lead commissioning efforts for critical facilities, from data centers to manufacturing environments. This role requires driving testing, field validation, and on-site execution while managing multiple projects and client relationships in fast-paced settings.
Ideal candidates bring an electrical background with data center experience, strong leadership, and the ability to mentor junior engineers.
At FST Technical Services, we ensure the most complex facilities in the world perform exactly as designed. From data centers to advanced manufacturing environments, our work sits at the intersection of engineering precision and real-world execution.
We are looking for a Senior Electrical Commissioning Project Engineer who can lead from the front, solve complex technical challenges, and drive commissioning outcomes in high-stakesenvironments.
This is not a checklist-driven commissioning role.
You will play a direct role in ensuring critical systems are designed correctly, installed properly, and perform under real-world conditions.
Regular travel to project sites with potential for broader U.S. travel. Must be able to work on-site asrequired.
At FST, you are part of a team that values execution, accountability, andexpertise. Strong performers are recognized, and engineers have opportunities to grow into leadership roles.
Salary range: $130,000 to $180,000