Senior Earned Value Management (EVM) Analyst – TS/SCI Clearance w/CI Poly Required

Leffler Consulting, LLC

Chantilly (VA)

On-site

USD 120,000 - 180,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

Medical
Dental
Vision
Disability coverage
Paid leave
Paid holidays
Employee assistance program
Employee referral program

Job summary

Leffler Consulting, LLC in Chantilly, VA is seeking a Senior Earned Value Management (EVM) Analyst to join our team providing support to national security satellite and ground systems. An active TS/SCI clearance with a CI polygraph is required.

Responsibilities include EVM analysis, IPMDAR deliverables, integrating performance with BCWP, and supporting IBRs and program replans. Proficiency with Empower and Tableau, and strong communication skills are essential.

Qualifications

  • 11 years of EVM experience, preferably in the DoD or Intelligence Community.
  • Experience with performance analysis tools.
  • Experience with COTS tools, such as Empower and Tableau preferred.
  • Proficient in Microsoft Office, including PowerPoint, Project, and Excel (pivot tables and macros).
  • Excellent analytical skills.
  • Strong oral and written communication skills.

Responsibilities

  • EVM analysis of space and software intensive systems.
  • Assist contractor program teams in implementing the IPMDAR deliverable (where applicable).
  • Assist Government program offices in understanding how to evaluate, analyze, and interpret IPM data in the new IPMDAR reporting schema (where applicable).
  • Integrating technical performance with technical performance metrics that drive objective performance measurement (BCWP) and analysis of predictive EACs.
  • Independent evaluation of Contractor EVM system(s) and use of modern data driven methods and tools.
  • Assist Government program offices in preparing for and conducting Integrated Baseline Reviews (IBRs).
  • Provide oversight and implementation guidance related to Program replan and Over Target Baseline / Schedule.
  • Developing independent estimate(s) at complete (EACs) and integrating with the government budget build.
  • Integrating IPM analysis with cross program analysis, cost estimates, Government EACs and other cross program analysis activities.
  • Perform other duties as assigned to support corporate initiatives, including but not limited to bid and proposal tasks such as resume reviews and technical writing.

Skills

EVM analysis
IPMDAR understanding
Performance analysis tools
Strong communication

Education

Bachelor's degree

Tools

Empower
Tableau
Excel
PowerPoint
Project

Job description

Job Description

Leffler Consulting is seeking a Senior Earned Value Management (EVM) Analyst to join our team in Chantilly providing support to national security satellite and ground systems. An active Top Secret/SCI clearance with a CI polygraph is required.

Location

Chantilly, VA

Duties
  • EVM analysis of space and software intensive systems
  • Assist contractor program teams in implementing the Integrated Program Management Data and Analysis Report (IPMDAR) deliverable (where applicable)
  • Assist Government program offices in understanding how to evaluate, analyze, and interpret IPM data in the new IPMDAR reporting schema (where applicable)
  • Integrating technical performance with technical performance metrics that drive objective performance measurement (BCWP) and analysis of predictive EACs
  • Independent evaluation of Contractor EVM system(s) and use of modern data driven methods and tools
  • Assist Government program offices in preparing for and conducting Integrated Baseline Reviews (IBRs)
  • Provide oversight and implementation guidance related to Program replan and Over Target Baseline / Schedule
  • Developing independent estimate(s) at complete (EACs) and integrating with the government budget build
  • Integrating IPM analysis with cross program analysis, cost estimates, Government EACs and other cross program analysis activities
  • Perform other duties as assigned to support corporate initiatives, including but not limited to bid and proposal tasks such as resume reviews and technical writing.
Required Education
  • Bachelor's degree
Required Experience
  • 11 years of EVM experience, preferably in the DoD or Intelligence Community
  • Experience with performance analysis tools
  • Experience with COTS tools, such as Empower and Tableau preferred
  • Must be proficient in Microsoft Office, including PowerPoint, Project, and Excel (pivot tables and macros)
  • Excellent analytical skills
  • Strong oral and written communication skills
Desired Education
  • Refer to “Required Education”
Company

Founded in 2001, Leffler Consulting is a women-owned small business (WOSB) headquartered in Chantilly, Virginia. We provide program management and systems engineering support to our nation’s most critical programs in the Intelligence Community (IC) and Department of Defense (DoD).

We offer competitive salaries and a generous benefits package,

  • medical
  • dental
  • vision
  • disability coverage
  • paid leave
  • paid holidays
  • employee assistance program
  • employee referral program
Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Senior Earned Value Management (EVM) Analyst – TS/SCI Clearance w/CI Poly
Senior Earned Value Management (EVM) Analyst – TS/SCI Clearance w/CI Poly

Leffler Consulting, LLC • Chantilly (VA)

On-site
USD 130,000 - 180,000
Senior EVM Analyst | TS/SCI Clearance (CI Poly)
Senior EVM Analyst | TS/SCI Clearance (CI Poly)

Leffler Consulting, LLC • Chantilly (VA)

On-site
USD 130,000 - 180,000
Senior Integrated (EVM and Schedule) Performance Management Analyst – TS/SCI Clearance w/CI Poly Required
Senior Integrated (EVM and Schedule) Performance Management Analyst – TS/SCI Clearance w/CI Poly Required

Leffler Consulting, LLC • Chantilly (VA)

On-site
USD 110,000 - 160,000
Medical insurance
Dental insurance
Vision insurance
+5
Senior EVM Analyst — Space Systems & IC Programs
Senior EVM Analyst — Space Systems & IC Programs

Leffler Consulting, LLC • Chantilly (VA)

On-site
USD 120,000 - 180,000
Medical
Dental
Vision
+5
Space Systems Engineer – TS/SCI Clearance w/CI Poly
Space Systems Engineer – TS/SCI Clearance w/CI Poly

Leffler Consulting • Chantilly (VA)

On-site
USD 120,000 - 160,000
Medical, dental, vision coverage
Disability coverage
Paid leave and holidays
+2
Cost Analyst/Estimator – TS/SCI Clearance w/CI Poly Required
Cost Analyst/Estimator – TS/SCI Clearance w/CI Poly Required

Leffler Consulting, LLC • Chantilly (VA)

On-site
USD 70,000 - 105,000
Medical Insurance
Dental Insurance
Vision Insurance
+5
Sr. EVMS Analyst
Sr. EVMS Analyst

Leidos • Huntsville (AL)

On-site
USD 92,000 - 167,000
Space Systems Engineer - TS/SCI (On-Site)
Space Systems Engineer - TS/SCI (On-Site)

Leffler Consulting, LLC • Chantilly (VA)

On-site
USD 120,000 - 165,000
Medical insurance
Dental insurance
Vision insurance
+2
Senior Budget Analyst – TS/SCI Clearance w/CI Poly Required
Senior Budget Analyst – TS/SCI Clearance w/CI Poly Required

Leffler Consulting • Chantilly (VA)

On-site
USD 100,000 - 130,000
Medical coverage
Dental coverage
Vision coverage
+4
Space Systems Engineer – TS/SCI Clearance w/CI Poly Required
Space Systems Engineer – TS/SCI Clearance w/CI Poly Required

Leffler Consulting, LLC • Chantilly (VA)

On-site
USD 120,000 - 165,000
Medical insurance
Dental insurance
Vision insurance
+2