Senior Earned Value Management (EVM) Analyst – TS/SCI Clearance w/CI Poly

Leffler Consulting, LLC

Chantilly (VA)

On-site

USD 130,000 - 180,000

Full time

13 days ago
Application generator

Stand out for this role — generate a tailored resume and cover letter in about a minute.

Get past ATS filters

Job summary

Leffler Consulting is seeking a Senior Earned Value Management (EVM) Analyst to join our team in Chantilly, VA, providing support to national security satellite and ground systems. An active Top Secret/SCI clearance with CI polygraph is required.

You will lead EVM analysis, assist programs with IPMDAR deliverables, evaluate IPM data, integrate performance metrics, and support IBRs and EAC development, using modern data-driven methods.

Qualifications

  • 11 years of EVM experience, preferably in DoD/IC.
  • Experience with performance analysis tools.
  • Experience with COTS tools such as Empower and Tableau.
  • Proficiency in Microsoft Office, including PowerPoint, Project and Excel (pivot tables/macros).
  • Excellent analytical and communication skills.

Responsibilities

  • EVM analysis of space and software-intensive systems.
  • Assist program teams with implementing IPMDAR deliverables.
  • Help Government program offices interpret IPM data in IPMDAR.
  • Integrate technical performance with metrics driving objective performance (BCWP) and EAC analyses.
  • Independently evaluate Contractor EVM systems and use data-driven methods/tools.
  • Assist with IBRs preparation and execution.
  • Provide oversight related to program replans and to over Target Baseline/Schedule.
  • Develop independent EACs and align with government budget builds.
  • Coordinate IPM analyses with cross-program data, cross-program estimates, and other analyses.
  • Support bid/proposal tasks such as resume reviews and technical writing.

Skills

EVM analysis
Performance analysis tools
Strong analytical skills
Excellent written and verbal comms
DoD/IC experience

Tools

Empower
Tableau
Excel
PowerPoint
Project

Job description

Senior Earned Value Management (EVM) Analyst – TS/SCI Clearance w/CI Poly Required
Location

Chantilly, VA

Job Description

Leffler Consulting is seeking a Senior Earned Value Management (EVM) Analyst to join our team in Chantilly providing support to national security satellite and ground systems. An active Top Secret/SCI clearance with a CI polygraph is required.

Duties
  • EVM analysis of space and software intensive systems
  • Assist contractor program teams in implementing the Integrated Program Management Data and Analysis Report (IPMDAR) deliverable (where applicable)
  • Assist Government program offices in understanding how to evaluate, analyze, and interpret IPM data in the new IPMDAR reporting schema (where applicable)
  • Integrating technical performance with technical performance metrics that drive objective performance measurement (BCWP) and analysis of predictive EACs
  • Independent evaluation of Contractor EVM system(s) and use of modern data driven methods and tools
  • Assist Government program offices in preparing for and conducting Integrated Baseline Reviews (IBRs)
  • Provide oversight and implementation guidance related to Program replan and Over Target Baseline / Schedule
  • Developing independent estimate(s) at complete (EACs) and integrating with the government budget build
  • Integrating IPM analysis with cross program analysis, cost estimates, Government EACs and other cross program analysis activities
  • Perform other duties as assigned to support corporate initiatives, including but not limited to bid and proposal tasks such as resume reviews and technical writing.
Required Education
Required Experience
  • 11 years of EVM experience, preferably in the DoD or Intelligence Community
  • Experience with performance analysis tools
  • Experience with COTS tools, such as Empower and Tableau preferred
  • Must be proficient in Microsoft Office, including PowerPoint, Project, and Excel (pivot tables and macros)
  • Excellent analytical skills
  • Strong oral and written communication skills
Desired Education
  • Refer to “Required Education”

Founded in 2001, Leffler Consulting is a women-owned small business (WOSB) headquartered in Chantilly, Virginia. We provide program management and systems engineering support to our nation’s most critical programs in the Intelligence Community (IC) and Department of Defense (DoD). We offer competitive salaries and a generous benefits package, including medical, dental, vision, and disability coverage, paid leave, paid holidays, an employee assistance program, and an employee referral program.

Copyright 2026 Leffler Consulting, LLC; Chantilly, VA

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Senior EVM Analyst | TS/SCI Clearance (CI Poly)
Senior EVM Analyst | TS/SCI Clearance (CI Poly)

Leffler Consulting, LLC • Chantilly (VA)

On-site
USD 130,000 - 180,000
Senior Integrated (EVM and Schedule) Performance Management Analyst – TS/SCI Clearance w/CI Poly Required
Senior Integrated (EVM and Schedule) Performance Management Analyst – TS/SCI Clearance w/CI Poly Required

Leffler Consulting, LLC • Chantilly (VA)

On-site
USD 110,000 - 160,000
Medical insurance
Dental insurance
Vision insurance
+5
Space Systems Engineer – TS/SCI Clearance w/CI Poly
Space Systems Engineer – TS/SCI Clearance w/CI Poly

Leffler Consulting • Chantilly (VA)

On-site
USD 120,000 - 160,000
Medical, dental, vision coverage
Disability coverage
Paid leave and holidays
+2
EVM Analyst
EVM Analyst

Technomics, Inc. • Arlington (VA)

On-site
USD 75,000 - 95,000
Competitive salary
Employee-owned benefits
Mentorship opportunities
Senior IPM Analyst – Top Secret/SCI Clearance
Senior IPM Analyst – Top Secret/SCI Clearance

Leffler Consulting, LLC • Chantilly (VA)

On-site
USD 110,000 - 160,000
Medical insurance
Dental insurance
Vision insurance
+5
Senior Budget Analyst – TS/SCI Clearance w/CI Poly Required
Senior Budget Analyst – TS/SCI Clearance w/CI Poly Required

Leffler Consulting • Chantilly (VA)

On-site
USD 100,000 - 130,000
Medical coverage
Dental coverage
Vision coverage
+4
Senior IPM Analyst – Top Secret/SCI Clearance
Senior IPM Analyst – Top Secret/SCI Clearance

Leffler Consulting, LLC • Chantilly (VA)

On-site
USD 110,000 - 160,000
Medical insurance
Dental insurance
Vision insurance
+5
Space Systems Engineer – TS/SCI Clearance w/CI Poly Required
Space Systems Engineer – TS/SCI Clearance w/CI Poly Required

Leffler Consulting, LLC • Chantilly (VA)

On-site
USD 120,000 - 165,000
Medical insurance
Dental insurance
Vision insurance
+2
Space Systems Engineer - TS/SCI (On-Site)
Space Systems Engineer - TS/SCI (On-Site)

Leffler Consulting, LLC • Chantilly (VA)

On-site
USD 120,000 - 165,000
Medical insurance
Dental insurance
Vision insurance
+2
Senior EVM Lead for National Security Programs
Senior EVM Lead for National Security Programs

KBR Careers • Chantilly (VA)

On-site
USD 170,000 - 207,000
Health insurance