Senior Construction Scheduler | P6 Expert & Project Lead

Traylor Bros. Inc.

United States

On-site

USD 90,000 - 130,000

Full time

12 days ago
Application generator

A complete application in a minute — tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Traylor Bros. Inc. is seeking a seasoned Scheduler to develop and manage the master schedule for complex infrastructure projects.

The role requires coordinating with engineers, superintendents, and subcontractors to ensure schedules reflect bid and contract requirements and optimize time and cost savings. The successful candidate will lead a team of schedulers, maintain critical-path schedules, and apply advanced Primavera P6 skills to drive project performance across multiple disciplines, in a

Qualifications

  • Bachelor's degree in a related field from an accredited institution.
  • 7–10 years of construction scheduling experience.
  • Advanced knowledge of Primavera P6 scheduling software.
  • Strong time management and communication skills.

Responsibilities

  • Develop detailed project schedules for assigned projects.
  • Coordinate with engineers and superintendents to align activities with bid and contract requirements.
  • Coordinate with subcontractors to integrate subcontractor schedules into the project schedule.
  • Review plans, specifications and contract documents to analyze scheduling requirements.
  • Generate multiple schedule scenarios with estimating to identify time and cost savings.
  • Lead a team of schedulers to maintain project schedules.

Skills

Integrity
Time management
Communication
Independent analysis

Education

Bachelor's Degree

Tools

Primavera P6

Job description

Traylor Bros. Inc. is seeking a seasoned Scheduler to develop and manage the master schedule for complex infrastructure projects.

The role requires coordinating with engineers, superintendents, and subcontractors to ensure schedules reflect bid and contract requirements and optimize time and cost savings. The successful candidate will lead a team of schedulers, maintain critical-path schedules, and apply advanced Primavera P6 skills to drive project performance across multiple disciplines, in a

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Lead P6 Scheduler - Underground Tunneling
Lead P6 Scheduler - Underground Tunneling

Traylor Bros. Inc. • Long Beach (CA)

On-site
USD 110,000 - 170,000
Lead Scheduler – Underground Tunneling Projects
Lead Scheduler – Underground Tunneling Projects

Traylor Bros. Inc. • Alabama

On-site
USD 90,000 - 120,000
Senior Construction Scheduler — P6 Expert (Tunneling)
Senior Construction Scheduler — P6 Expert (Tunneling)

Traylor Bros. Inc. • Alaska

On-site
USD 90,000 - 140,000
Lead Underground Scheduler | P6 Expert for Tunneling Projects
Lead Underground Scheduler | P6 Expert for Tunneling Projects

Traylor Bros., Inc. • Evansville (IN)

On-site
USD 70,000 - 90,000
Scheduler Underground
Scheduler Underground

Traylor Bros., Inc. • Alexandria (VA)

On-site
USD 80,000 - 100,000
Scheduler - Underground
Scheduler - Underground

Traylor Bros., Inc. • Alexandria (VA)

On-site
USD 70,000 - 90,000
Scheduler - Underground
Scheduler - Underground

Traylor Bros., Inc. • Evansville (IN)

On-site
USD 70,000 - 90,000
Scheduler - Underground
Scheduler - Underground

Traylor Bros. Inc. • United States

On-site
USD 90,000 - 130,000
Scheduler - Underground
Scheduler - Underground

Traylor Bros. Inc. • Long Beach (CA)

On-site
USD 110,000 - 170,000
Scheduler - Underground
Scheduler - Underground

Traylor Bros. Inc. • Alabama

On-site
USD 90,000 - 120,000