Senior Construction Scheduler — Master Project Timelines
Master Planning Management
Pomona (CA)
On-site
USD 80,000 - 110,000
Full time
14 days+
Application generator
Stand out for this role — generate a tailored resume and cover letter in about a minute.
Get past ATS filters
Benefits offered by this job
401(k)
401(k) matching
Health insurance
Life insurance
Paid time off
Referral program
Vision insurance
Job summary
A leading construction management firm is seeking a Sr. Project Scheduler for its Downtown Los Angeles office. The successful candidate will develop and maintain project schedules, interpret construction drawings, and perform quality assurance on contractor submissions. Excellent communication and organizational skills are essential, along with a Bachelor’s degree. The position offers a full-time contract and includes benefits like health insurance and a 401(k) plan. Interested candidates should send their resumes to HR@masterplanningmgmt.com.
Qualifications
Excellent written and verbal communication skills are required.
Superior organizational and planning skills are essential.
Must understand theories and practices of cost engineering and scheduling.
Responsibilities
Develop and maintain program schedules for construction projects.
Interpret detailed construction drawings effectively.
Perform QA/QC on contractor schedule submittals.
Skills
Communication skills
Organizational skills
Building relationships
Cost engineering principles
Scheduling knowledge
Education
Bachelor's degree
Job description
A leading construction management firm is seeking a Sr. Project Scheduler for its Downtown Los Angeles office. The successful candidate will develop and maintain project schedules, interpret construction drawings, and perform quality assurance on contractor submissions. Excellent communication and organizational skills are essential, along with a Bachelor’s degree. The position offers a full-time contract and includes benefits like health insurance and a 401(k) plan. Interested candidates should send their resumes to HR@masterplanningmgmt.com.