Senior Construction Scheduler — Contingency & Risk for Complex Infra

KBR Careers

Richmond (KY)

On-site

USD 110,000 - 150,000

Full time

24 hours ago
Be an early applicant
Application generator

Get a reply from this employer — a resume and cover letter tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

401K Plan
Medical
Dental
Vision
Life Insurance
AD&D
FSA
Disability
Paid Time Off
Flexible Work Schedule

Job summary

KBR is seeking a Senior Construction Scheduler for the Blue Grass Army Depot Energetics Center of Excellence explosives manufacturing facility in Kentucky. The role focuses on developing baselines, critical path analysis, and risk-informed scheduling to ensure on-time, within-budget project delivery.

Required are 5–10 years of scheduling experience, strong Primavera P6 and MS Project skills, and knowledge of EVM/SPI.

Qualifications

  • Bachelor's degree in Engineering, Project Management, or a related field.
  • 5-10 years’ experience in project scheduling, ideally within major infrastructure or water projects.
  • Strong proficiency in Primavera P6 and MS Project.
  • Understanding of EVM, SPI, schedule risk analysis, and progress measurement.

Responsibilities

  • Develop and maintain baseline schedules and prepare what-if scenarios to support project decision-making.
  • Apply schedule risk management techniques, including contingency planning.
  • Perform critical path analysis, schedule integrity reviews, and progress reporting.
  • Build and manage resource-loaded schedules, including producing histograms and schedule insights.
  • Work collaboratively with multidisciplinary engineering and project teams to ensure sequencing accuracy and timely program delivery.
  • Utilize tools including Primavera P6, MS Project, and Excel (Power BI experience highly preferred).
  • Support proposal development, capture activities, and long-range program growth strategies.
  • Other duties as assigned.

Skills

Primavera P6
MS Project
Earned Value Management (EVM)
Schedule Risk Analysis
Progress Measurement
Stakeholder Communication

Education

Bachelor's degree in Engineering or related field
Master's degree (preferred)
PMP or equivalent certification (preferred)

Tools

Primavera P6
MS Project

Job description

KBR is seeking a Senior Construction Scheduler for the Blue Grass Army Depot Energetics Center of Excellence explosives manufacturing facility in Kentucky. The role focuses on developing baselines, critical path analysis, and risk-informed scheduling to ensure on-time, within-budget project delivery.

Required are 5–10 years of scheduling experience, strong Primavera P6 and MS Project skills, and knowledge of EVM/SPI.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Senior Construction Scheduler — Contingency & Risk
Senior Construction Scheduler — Contingency & Risk

KBR, Inc. • Fort Knox (KY)

On-site
USD 100,000 - 165,000
Senior Construction Scheduler - Contingency & Critical Path
Senior Construction Scheduler - Contingency & Critical Path

KBR Careers • Fort Knox (KY)

On-site
USD 110,000 - 150,000
401K plan with company match
Medical
Dental
+3
BGAD: Senior Construction Scheduler ( Contingency )
BGAD: Senior Construction Scheduler ( Contingency )

KBR Careers • Richmond (KY)

On-site
USD 110,000 - 150,000
401K Plan
Medical
Dental
+7
BGAD: Senior Construction Scheduler ( Contingency )
BGAD: Senior Construction Scheduler ( Contingency )

KBR Careers • Fort Knox (KY)

On-site
USD 110,000 - 150,000
401K plan with company match
Medical
Dental
+3
BGAD: Senior Construction Scheduler ( Contingency )
BGAD: Senior Construction Scheduler ( Contingency )

KBR, Inc. • Fort Knox (KY)

On-site
USD 100,000 - 165,000
Senior Project Controls Engineer – Defense Manufacturing
Senior Project Controls Engineer – Defense Manufacturing

KBR Careers • Fort Knox (KY)

On-site
USD 110,000 - 150,000
401K plan with company match
Medical insurance
Dental insurance
+6
Senior Project Controls Engineer – Government Manufacturing
Senior Project Controls Engineer – Government Manufacturing

KBR Careers • Richmond (KY)

On-site
USD 110,000 - 150,000
401K with company match
Medical, dental, vision
Life insurance
+3
BGAD: Senior Project Controls Engineer (Contingency )
BGAD: Senior Project Controls Engineer (Contingency )

KBR Careers • Richmond (KY)

On-site
USD 110,000 - 150,000
401K with company match
Medical, dental, vision
Life insurance
+3
BGAD: Senior Project Controls Engineer (Contingency )
BGAD: Senior Project Controls Engineer (Contingency )

KBR Careers • Fort Knox (KY)

On-site
USD 110,000 - 150,000
401K plan with company match
Medical insurance
Dental insurance
+6
Energetics Construction Engineering Lead (On-Site, Secret)
Energetics Construction Engineering Lead (On-Site, Secret)

KBR Careers • Fort Knox (KY)

Hybrid
USD 140,000 - 200,000
401K plan with company match
Medical, dental, vision insurance
Life insurance
+3