Senior Construction Scheduler

Parsons Corporation

San Antonio (TX)

On-site

USD 104,000 - 181,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

Medical
Dental
Vision
Paid time off
Employee Stock Ownership Plan (ESOP)
401(k)
Life insurance
Flexible work schedules
Holidays to fit your busy lifestyle

Job summary

Parsons is seeking a Scheduler to join our Owner’s Advisor team supporting the METC Recapitalization Program at Joint Base San Antonio–Fort Sam Houston. This mission-critical initiative will deliver five modern dormitory facilities for up to 6,000 joint-service medical students and the associated infrastructure.

You will develop independent schedule analyses, validate logic, calendars, and critical paths, review the owner’s integrated schedule, and prepare narratives and reports to support

Qualifications

  • Bachelor's degree required or equivalent with 4 additional years of related experience.
  • 10+ years of scheduling experience for construction projects or federal contracting operations.
  • Proficiency in Primavera P6 or equivalent CPM scheduling software and advanced spreadsheet analysis.
  • Strong understanding of CPM scheduling, risk, and cost integration.

Responsibilities

  • Develop independent schedule analysis and integrated forecasting across design, manufacturing, shipping, construction, utilities, and acceptance.
  • Give program leadership clear evidence of constraints and realistic recovery options.
  • Review and maintain the owner’s integrated schedule model aligned to the approved contractor schedule and milestones.
  • Validate logic, calendars, durations, critical paths, resources, float, and links between factories and site work fronts.
  • Analyze production quantities and rates using consistent units for beds, rooms, modules, shipments, and crane lifts.
  • Integrate field progress, look-ahead constraints, utility readiness, and commissioning prerequisites into forecasts.
  • Perform schedule risk and what-if analysis; evaluate change impacts and proposed recovery sequencing.
  • Prepare concise schedule narratives, variance reports, decision deadlines, and milestone confidence assessments.

Skills

US Citizenship
CPM Scheduling
Project Controls
Primavera P6
Cross-functional teamwork
Communication
Analytical thinking

Education

Bachelor's degree in Construction Management, Engineering, Architecture, Business, or related field

Tools

Primavera P6

Job description

In a world of possibilities, pursue one with endless opportunities. Imagine Next!At Parsons, you can imagine a career where you thrive, work with exceptional people, and be yourself. Guided by our leadership vision of valuing people, embracing agility, and fostering growth, we cultivate an innovative culture that empowers you to achieve your full potential. Unleash your talent and redefine what’s possible.

Job Description:

Parsons is seeking a Scheduler to join our Owner’s Advisor team supporting the Medical Enlisted Training Campus (METC) Recapitalization Program at Joint Base San Antonio–Fort Sam Houston. This mission-critical initiative will deliver five modern dormitory facilities for up to 6,000 joint-service medical students and the associated infrastructure.

Working alongside government leaders, military stakeholders, designers, and contractors, you will help manage risk, protect the government’s interests, and support the successful delivery of a high-profile Progressive Design-Build program. This is a unique opportunity to contribute to a landmark campus, advance innovative delivery methods, and help shape the future of large-scale Air Force infrastructure programs.

What You’ll Be Doing:
  • Develop independent schedule analysis and integrated forecasting across design, manufacturing, shipping, construction, utilities, and acceptance.
  • Give program leadership clear evidence of constraints and realistic recovery options.
  • Review and maintain the owner’s integrated schedule model aligned to the approved contractor schedule and milestones.
  • Validate logic, calendars, durations, critical paths, resources, float, and links between factories and site work fronts.
  • Analyze production quantities and rates using consistent units for beds, rooms, modules, shipments, and crane lifts.
  • Integrate field progress, look-ahead constraints, utility readiness, and commissioning prerequisites into forecasts.
  • Perform schedule risk and what-if analysis; evaluate change impacts and proposed recovery sequencing.
  • Prepare concise schedule narratives, variance reports, decision deadlines, and milestone confidence assessments.
What Required Skills You’ll Bring:
  • Must be a US Citizen
  • Bachelor's degree in Construction Management, Engineering, Architecture, Business, or related field; 4 addition years of relevant experience will substitute for a degree.
  • 10+ years of experienceinscheduling forconstruction projects or federal contracting operations.
  • Proficiency in Primavera P6 or equivalent CPM scheduling software and advanced spreadsheet analysis.
  • Strong understanding of construction sequencing, critical path method (CPM), and project controls.
  • Experience supporting utility, construction, or infrastructure projects preferred
  • Strong understanding of scheduling logic, resource planning, and cost integration
  • Strong communication and collaboration skills in a cross-functional environment
  • Ability to manage multiple priorities in a deadline-driven setting
  • Excellent analytical, problem-solving, and communication skills.
  • Ability to obtain and maintain unescorted access to JBSA Fort Sam Houston.
  • Ability to maintain a one team mentality amongst all stakeholders.
What Desired Skills You’ll Bring
  • Experience project scheduling for large scale Federal or DoD construction projects
  • Former Military Construction/Engineering experience a plus
  • Experience performing 14-point schedule assessment or similar schedule quality reviews
  • AACE PSP or PMI-SP credential; quantitative schedule risk modeling experience.
  • Federal design-build, factory production/logistics, five-building or comparable concurrent campus delivery, and commissioning schedules.
Security Clearance Requirement:

NoneThis position is part of our Federal Solutions team.The Federal Solutions segment delivers resources to our US government customers that ensure the success of missions around the globe. Our intelligent employees drive the state of the art as they provide services and solutions in the areas of defense, security, intelligence, infrastructure, and environmental. We promote a culture of excellence and close-knit teams that take pride in delivering, protecting, and sustaining our nation's most critical assets, from Earth to cyberspace. Throughout the company, our people are anticipating what’s next to deliver the solutions our customers need now.

Salary Range: $103,500.00 - $181,100.00

We value our employees and want our employees to take care of their overall wellbeing, which is why we offer best-in-class benefits such as.

  • medical
  • dental
  • vision
  • paid time off
  • Employee Stock Ownership Plan (ESOP)
  • 401(k)
  • life insurance
  • flexible work schedules
  • holidays to fit your busy lifestyle!

Parsons is an equal opportunity employer, and all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, disability, veteran status or any other protected status.

We truly invest and care about our employee’s wellbeing and provide endless growth opportunities as the sky is the limit, so aim for the stars! Imagine next and join the Parsons quest—

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Site Construction Manager
Site Construction Manager

Parsons Corporation • San Antonio (TX)

On-site
USD 125,000 - 225,000
Medical insurance
Dental coverage
Vision coverage
+4
Deputy Program Manager/Construction Services Manager
Deputy Program Manager/Construction Services Manager

Parsons Corporation • San Antonio (TX)

On-site
USD 120,000 - 160,000
ESOP
401(k)
Life insurance
+1
Senior Cost Analyst
Senior Cost Analyst

Parsons Corporation • Alamo Heights (TX)

On-site
USD 95,000 - 130,000
Medical
Dental
Vision
+6
Sr. Scheduler
Sr. Scheduler

Parsons • Atlanta (GA)

On-site
USD 88,000 - 155,000
Medical benefits
ESOP
401(k)
Construction Scheduler/Project Controller (Hybrid)
Construction Scheduler/Project Controller (Hybrid)

Parsons • Tennessee

Hybrid
USD 88,000 - 155,000
Senior Scheduler
Senior Scheduler

Parsons • Colorado Springs (CO)

On-site
USD 112,000 - 196,000
Design for Manufacture and Assembly (DfMA) Lead
Design for Manufacture and Assembly (DfMA) Lead

Parsons Corporation • Terrell Hills (TX)

On-site
USD 125,000 - 225,000
Medical
Dental
Vision
+6
Senior Project Manager
Senior Project Manager

Parsons Corporation • District of Columbia

On-site
USD 134,000 - 241,000
Scheduler
Scheduler

Parsons • Colorado Springs (CO)

On-site
USD 104,000 - 181,000
Medical
Dental
Vision
+6
Program Lead, Construction Management Services (Owners Agent)
Program Lead, Construction Management Services (Owners Agent)

Parsons Corporation • Boston (MA)

Hybrid
USD 134,000 - 241,000
Medical, dental, vision
PTO & holidays
ESOP
+1