Second Shift Capping Technician – $23.40-$24.00 + 20% Diff

Hubbell Incorporated

Cuba (MO)

On-site

USD 32,000 - 33,000

Full time

14 days+
Application generator

Turn this role into an interview — a resume and cover letter built around what this employer wants.

Get past ATS filters

Benefits offered by this job

Climate controlled facility
11 Paid Holidays
Up to 4 weeks PTO
Benefits

Job summary

Hubbell Incorporated is seeking a 2nd shift worker to cap and insulate core components. You will apply caps, secure strips, and use tape measures to verify dimensions in a climate‑controlled facility. Overtime is required and a 20% shift differential applies on 2nd shift.

The role emphasizes safety, accuracy, and teamwork while maintaining quality standards across production lines. Benefited by a structured environment with paid time off and holiday schedules.

Qualifications

  • Experience following safety and quality guidelines.
  • Able to stand for extended periods.
  • Accurate use of measuring devices and tools.
  • Basic arithmetic for measurements and data recording.

Responsibilities

  • Ensure safe and compliant work practices per OSHA standards.
  • Perform core capping and insulation assembly with tapes/strips.
  • Operate hand tools and measure dimensions accurately.
  • Maintain clean, organized work area (5S) and record data.
  • Perform other duties as assigned.

Skills

Measuring devices
Hand tools
Quality focus
OSHA guidelines
Teamwork
Independent work

Tools

Tape measure
Hoist operation

Job description

Hubbell Incorporated is seeking a 2nd shift worker to cap and insulate core components. You will apply caps, secure strips, and use tape measures to verify dimensions in a climate‑controlled facility. Overtime is required and a 20% shift differential applies on 2nd shift.

The role emphasizes safety, accuracy, and teamwork while maintaining quality standards across production lines. Benefited by a structured environment with paid time off and holiday schedules.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

2nd Shift Capping Technician — Climate-Controlled + 20% Diff
2nd Shift Capping Technician — Climate-Controlled + 20% Diff

Hubbell Incorporated • Missouri

On-site
USD 32,000 - 33,000
Climate controlled facility
Up to 4 weeks paid time off
11 paid holidays
+1
2nd Shift Electrical Lead & Finishing Technician
2nd Shift Electrical Lead & Finishing Technician

Hubbell Incorporated • Missouri

On-site
USD 33,000 - 36,000
Climate controlled facility
Paid time off
Paid holidays
+3
Capping 2nd Shift ($23.40-$24.00 with Shift Differential)
Capping 2nd Shift ($23.40-$24.00 with Shift Differential)

Hubbell Incorporated • Missouri

On-site
USD 32,000 - 33,000
Climate controlled facility
Up to 4 weeks paid time off
11 paid holidays
+1
Capping 2nd Shift ($23.40-$24.00 with Shift Differential)
Capping 2nd Shift ($23.40-$24.00 with Shift Differential)

Hubbell Incorporated • Cuba (MO)

On-site
USD 32,000 - 33,000
Climate controlled facility
11 Paid Holidays
Up to 4 weeks PTO
+1
Leads/Finishing 2nd Shift ($24.19-$26.29 with shift differential
Leads/Finishing 2nd Shift ($24.19-$26.29 with shift differential

Hubbell Incorporated • Missouri

On-site
USD 33,000 - 36,000
Climate controlled facility
Paid time off
Paid holidays
+3
Leads/Finishing 2nd Shift ($24.19-$26.29 with shift differential
Leads/Finishing 2nd Shift ($24.19-$26.29 with shift differential

Hubbell Incorporated • Cuba (MO)

On-site
USD 68,880,000 - 77,146,000
Climate controlled facility
Up to 4 weeks PTO
11 paid holidays
+3
Lead & Finishing Technician: Crimping & Wiring (2nd Shift)
Lead & Finishing Technician: Crimping & Wiring (2nd Shift)

Hubbell Incorporated • Cuba (MO)

On-site
USD 68,880,000 - 77,146,000
Climate controlled facility
Up to 4 weeks PTO
11 paid holidays
+3
2nd Shift Assembly Technician | Cross-Train Operator
2nd Shift Assembly Technician | Cross-Train Operator

Hubbell Incorporated • Rocky Mount (NC)

On-site
USD 21,000 - 30,000
Leads/Finishing 1st Shift ($20.16-21.91)
Leads/Finishing 1st Shift ($20.16-21.91)

Hubbell Incorporated • Cuba (MO)

On-site
USD 35,000 - 50,000
Up to 4 weeks paid time off
11 Paid Holidays
Competitive wages with shift differential
+1
Core Winder- Weekend Shift ($20.16-$21.91 per hour) plus shift differential
Core Winder- Weekend Shift ($20.16-$21.91 per hour) plus shift differential

Hubbell Incorporated • Missouri

On-site
USD 36,000 - 60,000