Quality Control Inspector - Data Center Construction

WEITZ-ABITAT MISSION CRITICAL

San Marcos (TX)

On-site

USD 65,000 - 90,000

Full time

10 hours ago
Be an early applicant
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Benefits offered by this job

Competitive Pay
Bonus Program
Benefits Package with HSA/FSA
Employer-Paid Disability
Employer-Paid Life Insurance
401K with Company Match
Paid Time Off
Parental Leave

Job summary

The Weitz Company seeks a Quality Control Inspector for data center construction in San Marcos, TX. You will ensure project quality aligns with contract documents, plans and standards.

You’ll lead site inspections, document test results, manage non-conformances, and collaborate with safety and project teams to uphold lean processes and quality.

Qualifications

  • Minimum of three (3) years of construction-related experience required.
  • LEAN principles experience desirable; data center experience strongly preferred.
  • Excellent verbal and written communication; highly organized and detail-oriented.
  • Procore and Bluebeam experience preferred; MS Office and Apple products familiarity.

Responsibilities

  • Understand project scope, quality requirements, contract documents, site drawings, manufacturer data/manuals and quality plan; ensure construction aligns with them.
  • Schedule, conduct and evaluate inspections and quality monitoring of daily and upcoming work.
  • Prepare inspection and test plans; document tests, measurements, and reports; maintain quality files for project turnover.
  • Identify and report non-conforming work; track on non-conformance log and issue related reports.
  • Oversee daily construction reports, field observation reports, punch lists, quality reports and as-built drawings.

Skills

Quality control
Communication skills
Detail-oriented
Project prioritization
Lean principles
Data center experience

Tools

Microsoft Office Suite
Procore
Bluebeam
Apple devices

Job description

Quality Control Inspector - Data Center Construction

You Don’t Just Set the Standard for the Project, You’re the Blueprint Behind It

San Marcos, Texas

Quality Control Full time R-100264

Job Description

The Weitz Company is hiring a Quality Control Inspector to work on data center projects for the Mission Critical division in Des Moines, IA.

What You’ll Do
  • Understand project scope and quality requirements, contract documents, site drawings, manufacturer product data/manuals and company quality plan and standards; ensure project is constructed accordingly
  • Schedule, conduct and evaluate various site inspections, quality monitoring and surveillance of daily and upcoming work (i.e. first work, follow up, regulatory agency, underground utility, concrete pour, material, off-site, final rough-in)
  • Prepare inspection and test plans; document testing, measurements, inspection reports and other quality reports; maintain necessary quality-related files and compile necessary documents for project turnover to owner
  • Identify and report non-conforming work; track on non-conformance log; assist with issuing related reports
  • Oversee development and review of daily construction reports, field observation reports, punch lists, quality reports and as-built drawings
  • Stay abreast of federal, industry and company standards; educate project teams of compliance requirements and changes
  • Partner with project safety team to determine hazards and identify needs or processes to remedy; proactively eliminate or minimize identified hazards
  • Ensure inspections, observations and punch list are documented and stored in accordance to company policy
  • Monitor project site adherence to company quality plan and standards; propose updates or modifications to management for review
  • Utilize virtual and physical mock-ups to establish quality standards and identify lean processes to improve field productivity
  • Establish and maintain working relationships with owners, architects, subcontractors, vendors and internal team members to ensure company quality plan is adhered to
  • Perform other duties as assigned
What We’re Looking For
  • Experience: A minimum of three (3) years of construction-related experience is required. Construction field experience is preferred. Experience in a fast-paced environment; LEAN principles experience is desirable. Data center experience is strongly preferred.
  • Skills: Excellent verbal and written communication; Ability to balance and prioritize projects with impending deadlines; Detail-oriented and highly organized; Business acumen and relationship-building skills.
  • Technology: Candidate should have experience with Microsoft Office Suite, Apple products (iPhone & iPad) and have the ability to learn specific software. Solid systems experience with Procore and Bluebeam is preferred. Training will be provided on company standards.
What We Offer
  • Competitive Pay
  • Rewarding Bonus Program
  • Comprehensive Benefits Package with Tax-Advantaged HSA and FSA offerings
  • Employer-Paid Short- and Long-Term Disability Programs
  • Employer-Paid Life Insurance
  • Generous Paid Time Off Provisions
  • 401K Retirement Savings Plan with Company Match
  • Tuition Reimbursement
  • Fully Paid Parental Leave
  • Voluntary Products Including: Critical Illness Insurance and Accident Insurance
  • Corporate Wellness Program with Wellness Time Off and Rewards

Visa sponsorship is not available for this position at this time.

The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates) recognizes the value of and is committed to hiring and retaining a diverse and inclusive workforce. We are an Equal Opportunity Employer and follow applicable affirmative action guidelines and policies. All qualified applicants will receive consideration for employment (including minorities, females, veterans, and individuals with disabilities, regardless of sexual orientation, gender identity, or other protected categories in accordance with applicable state and federal laws). The Company is a drug and alcohol-free workplace and background checks are required if applicable. Click here (opens in new window) to review our Privacy Notice.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Quality Control Inspector - Data Center Construction
Quality Control Inspector - Data Center Construction

The Weitz Company • Des Moines (IA), Northern (KY)

Hybrid
USD 52,000 - 76,000
Competitive Pay
Bonus Program
Benefits Package
+7
Quality Control Inspector - Data Center Construction
Quality Control Inspector - Data Center Construction

Weitz • San Marcos (TX)

On-site
USD 60,000 - 80,000
Competitive Pay
Bonus Program
Comprehensive Benefits with HSA/FSA
+7
Project Manager - Data Center Construction
Project Manager - Data Center Construction

Weitz • San Marcos (TX)

On-site
USD 90,000 - 130,000
Competitive Pay
Bonus Program
Benefits Package with HSA/FSA
+8
Senior Project Manager - Data Center Construction (Traveling)
Senior Project Manager - Data Center Construction (Traveling)

The Weitz Company • Des Moines (IA)

Hybrid
USD 130,000 - 170,000
Competitive Pay
Bonus Program
Benefits with HSA/FSA
+8
Project Engineer - Data Center Construction
Project Engineer - Data Center Construction

Weitz • San Marcos (TX)

On-site
USD 70,000 - 100,000
Quality Control Manager - Industrial Construction
Quality Control Manager - Industrial Construction

The Weitz Company • Hastings (NE)

On-site
USD 90,000 - 120,000
Competitive Pay
Bonus Program
Benefits Package with HSA/FSA
+7
Senior Project Manager - Data Center Construction - (Traveling)
Senior Project Manager - Data Center Construction - (Traveling)

Weitz • Houston (TX)

On-site
USD 120,000 - 180,000
Competitive Pay
Bonus Program
Benefits package
+8
Senior Project Manager - Data Center Construction - (Traveling)
Senior Project Manager - Data Center Construction - (Traveling)

Weitz • Leesburg (VA)

On-site
USD 120,000 - 180,000
Competitive pay
Bonus program
Benefits package (HSA/FSA)
+6
Virtual Design & Construction (VDC) Engineer
Virtual Design & Construction (VDC) Engineer

Weitz • Austin (TX)

On-site
USD 85,000 - 125,000
Competitive Pay
Bonus Program
401K Retirement Savings Plan with [We]
+7
Project Engineer II - (Data Center) - Traveling
Project Engineer II - (Data Center) - Traveling

WEITZ-ABITAT MISSION CRITICAL • Tucson (AZ)

On-site
USD 70,000 - 100,000
Competitive Pay
Bonus Program
Benefits Package (HSA/FSA)
+5