Get a reply from this employer
Your resume and cover letter, tailored to exactly what they’re hiring for.
The City of Indianapolis is seeking a design management professional to oversee design activities for transportation, environmental, traffic and stormwater projects across Marion County.
You will coordinate schedules, budgets and contract requirements, ensure work is on time and within specs, and collaborate with city, state and FHWA guidelines. A technical degree or 5+ years of relevant experience is required; a Professional Engineer license is preferred but not required.
Position responsible for overseeing projects in the design management section and providing technical engineering assistance related to design management activities for transportation, environmental, traffic and stormwater projects throughout Marion County.
Technical degree/certification or five plus (5+) years of related work experience required. Possession of Professional Engineer license in the state of Indiana is preferred, but not required. The position requires extensive knowledge of City, State, and FHWA policies and specifications as they relate to construction of City infrastructure. The position requires excellent oral and written skills in addition to excellent conflict resolution skills.
Duties performed in a standard office environment, outdoors, and in a vehicle, involving standing/walking, walking on uneven terrain, close and far vision, reaching, bending at waist, and exposure to varying weather conditions and physical hazards normally associated with construction sites.
All rates are bi-weekly.
2026 Rate Sheet - To view our rate sheet, please copy and paste this link into your web browser: https://acrobat.adobe.com/id/urn:aaid:sc:VA6C2:67382b58-4d1a-4519-89d7-8453f91e19a1
Employees hired/rehired by the City and County between 1/1/2017 and 12/31/2021 will be automatically enrolled in the PERF My Choice: Retirement Savings plan. This plan is an annuity savings account (ASA) only plan and does not have a pension component. Any service that an employee has in the My Choice: Retirement Savings Plan will not count toward the service time requirements for pension eligibility in the Hybrid Plan.
With the PERF My Choice: Retirement Savings Plan, the ASA is split up into two parts: Part one - This consists of the mandatory employee contribution of three (3%) percent of compensation (made for the employee by the City), plus interest credits or earnings. You're always vested in your ASA portion - it's always yours. Part Two - This Consists Of An Additional Variable Rate Contribution Paid By The City Toward Your ASA. This Variable Rate Contribution Is Currently 1% Of Your Gross Wages. Vesting In The Value Of The Variable Rate Employer Contribution Will Vary By Length Of Participation. You Are
Annuity Savings Account (ASA) -This consists of the mandatory employee contribution of three (3%) percent of compensation (made for the employee by the City), plus interest credits or earnings. You're always vested in your ASA portion - it's always yours. Pension - The pension portion of the retirement benefit is funded by contributions made by the employer over the course of the employee's career and separate from the annuity savings account. Employees enrolled in the PERF Hybrid plan are eligible for retirement benefits at age sixty-five (65) if they have ten (10) or more years of creditable service. After June 30, 1995, employees may retire at age sixty (60) with at least fifteen (15) years of credible service or if the member's age in years plus the years of credible service equals at least 85 and the member is at least fifty-five (55) years of age. With fifteen (15) or more years of creditable service, the employee may retire as early as age fifty (50) with a reduced pension.
Questions relating to PERF may be directed to INPRS - PERF at: Indiana Public Retirement System Public Employees' Retirement Fund One North Capitol, Suite 001 Indianapolis, Indiana 46204 (888) 236-3544 01
Do you possess extensive knowledge of City, State, and FHWA policies and specifications as they relate to construction of City infrastructure?