Project Engineer (Electrical) - Data Center Construction

The Weitz Company

McLean (VA)

Presencial

USD 75 000 - 105 000

Tempo integral

14 dias+

Uma candidatura completa num minuto

Currículo e carta de apresentação personalizados, prontos a enviar.

Ultrapassa os filtros ATS

Vantagens oferecidas por esta oferta de emprego

Competitive Pay
Comprehensive Benefits Package
Tuition Reimbursement
Parental Leave
401K with Company Match
Paid Time Off

Resumo da oferta

The Weitz Company is seeking a Project Engineer to support multiple project phases from planning to closeout. The role involves reviewing drawings, coordinating with the VDC team, and assisting with submittals, procurement, and field coordination.

Ideal candidates have 1–2 years in a similar role, an engineering background, and comfort with LEAN and NEC concepts. Travel or relocation may be required to support upcoming projects.

Qualificações

  • 1–2 years of experience as a Project Engineer or similar role.
  • Engineering degree is a plus
  • LEAN principles experience is desirable
  • Knowledge of NEC code is a plus

Responsabilidades

  • Review electrical drawings, specs, and project scope.
  • Coordinate with VDC team and review BIM/shop drawings.
  • Assist with submittals preparation and tracking.
  • Support procurement and material tracking.
  • Participate in coordination and project meetings.
  • Support prefabrication coordination.
  • Maintain engineering logs and documentation.
  • Coordinate with Engineering, VDC, Procurement, and Field teams.
  • Ensure compliance with project drawings and specs.
  • Support Engineering Project Manager and Project Manager.
  • Identify and help resolve technical and coordination issues.
  • Support quality control and installation verification.
  • Assist with as-built documentation and project closeout.
  • Track engineering deliverables and project deadlines.
  • Coordinate with field team and provide technical support.
  • Issue and track RFIs
  • Support preparation and tracking of MTOs
  • Support engineering deliverables (cable schedules, panel schedules, as-builts)

Conhecimentos

Initiative
Analytical thinking
Communication skills
Team collaboration
Organization
Flexibility

Formação académica

Engineering degree

Ferramentas

Microsoft Word
Excel
PowerPoint
Outlook
Revit
AutoCAD
Navisworks
Procore
Bluebeam
JDE
Scheduling software

Descrição da oferta de emprego

Job Description:

Are you looking to join a company with opportunity for growth and development? EPI Power is hiring a Project Engineer to be responsible for several functions throughout the duration of assigned projects including planning, buyout, management and closeout. This role actively assists the project team in monitoring project status and identifying issues that may impact the project schedule and/or budget. The ideal candidate is open to travel and/or relocation based on upcoming project needs. EPI is hiring both entry-level and experienced Project Engineer candidates.

What You’ll Do:

  • Review electrical drawings, specifications, and project scope
  • Coordinate with VDC team and review BIM/shop drawings
  • Assist with submittals preparation and tracking
  • Support procurement and material tracking
  • Participate in coordination and project meetings
  • Support prefabrication coordination
  • Maintain engineering logs and documentation
  • Coordinate with Engineering, VDC, Procurement, and Field teams
  • Ensure compliance with project drawings and specifications
  • Support Engineering Project Manager and Project Manager
  • Identify and help resolve technical and coordination issues
  • Support quality control and installation verification
  • Assist with as-built documentation and project closeout
  • Track engineering deliverables and project deadlines
  • Coordinate with field team and provide technical support
  • Issue and track RFIs
  • Support preparation and tracking of MTOs
  • Support engineering deliverables (cable schedules, panel schedules, as-builts)

What We’re Looking For:

Experience:

  • 1-2 years of experience as a Project Engineer or in a similar role, industry related degree/coursework, or related internship experience
  • Engineering degree is a plus
  • LEAN principles experience is desirable
  • Knowledge of NEC code is a plus

Skills:

  • Displays a high level of initiative and is comfortable making independent judgement
  • Analytical thinker who enjoys solving problems
  • Excellent written and verbal communication skills
  • Desire to work in a collaborative, supportive, team environment
  • Organized and a high attention to detail
  • Flexibility

Technology:

  • Proficient in basic computer software including Microsoft Word, PowerPoint, Excel, and Outlook Autodesk software programs (Revit AutoCAD and Navisworks)
  • Ability to learn specific job‑related software upon hire (JDE, Procore, Bluebeam, scheduling software, etc.)

What We Offer:

  • Competitive Pay
  • Comprehensive Benefits Package with Tax‑Advantaged HSA and FSA offerings
  • Employer‑Paid Short‑and‑Long‑Term Disability Programs
  • Employer‑Paid Life Insurance
  • Generous Paid Time Off Provisions
  • 401K Retirement Savings Plan with Company Match
  • Tuition Reimbursement
  • Fully Paid Parental Leave
  • Voluntary Products Including: Critical Illness Insurance and Accident Insurance
  • Corporate Wellness Program with Wellness Time Off and Rewards

Visa sponsorship is not available for this position at this time.

The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates) recognizes the value of and is committed to hiring and retaining a diverse and inclusive workforce. We are an Equal Opportunity Employer and follow applicable affirmative action guidelines and policies. All qualified applicants will receive consideration for employment (including minorities, females, veterans, and individuals with disabilities, regardless of sexual orientation, gender identity, or other protected categories in accordance with applicable state and federal laws). The Company is a drug and alcohol‑free workplace and background checks are required if applicable. Click here to review our Privacy Notice.

Obtém a tua avaliação gratuita e confidencial do currículo.

ou arrasta e larga o ficheiro aqui.

Similar jobs

Ofertas semelhantes que vale a pena comparar

Project Engineer (Electrical) - Data Center Contruction
Project Engineer (Electrical) - Data Center Contruction

The Weitz Company • Des Moines (IA)

Presencial
USD 70 000 - 95 000
Competitive Pay
Benefits Package
Disability Insurance
+7
Project Engineer (Electrical) - Data Center Construction
Project Engineer (Electrical) - Data Center Construction

The Weitz Company • San Marcos (TX)

Presencial
USD 65 000 - 90 000
Competitive Pay
Comprehensive Benefits Package with H,
Electrical Assistant Project Manager
Electrical Assistant Project Manager

The Weitz Company • Des Moines (IA)

Presencial
USD 90 000 - 120 000
Competitive Pay
Benefits Package
Disability Insurance
+6
Project Engineer (Electrical) - Data Center Contruction
Project Engineer (Electrical) - Data Center Contruction

EPI Power • Des Moines (IA)

Presencial
USD 65 000 - 90 000
Competitive Pay
Tax-Advantaged Health Savings/Flexible
Disability Insurance
+5
Construction Project Manager - Electrical
Construction Project Manager - Electrical

The Weitz Company • Boydton (VA)

Presencial
USD 90 000 - 130 000
Competitive Pay
Benefits Package
401K with Company Match
+3
Virtual Design & Construction (VDC) Engineer
Virtual Design & Construction (VDC) Engineer

EPI Power • McLean (VA)

Presencial
USD 110 000 - 150 000
Competitive Pay
Benefits Package (HSA/FSA)
Disability Insurance
+7
Virtual Design & Construction (VDC) Engineer
Virtual Design & Construction (VDC) Engineer

EPI Power • Des Moines (IA)

Presencial
USD 90 000 - 125 000
Project Engineer - Data Center Construction
Project Engineer - Data Center Construction

Weitz • San Marcos (TX)

Presencial
USD 70 000 - 100 000
Construction Project Manager - Electrical
Construction Project Manager - Electrical

EPI Power • Boydton (VA)

Presencial
USD 95 000 - 140 000
Competitive Pay
Comprehensive Benefits (HSA/FSA)
Disability Insurance
+7
Virtual Design & Construction (VDC) Engineer
Virtual Design & Construction (VDC) Engineer

The Weitz Company • San Marcos (TX)

Presencial
USD 90 000 - 130 000