Project Engineer (Electrical) - Data Center Construction

The Weitz Company

Des Moines (IA)

Presencial

USD 85.000 - 110.000

Jornada completa

Hace 4 días
Sé de los primeros/as/es en solicitar esta vacante

Consigue una respuesta de este empleador

Tu currículum y tu carta de presentación, adaptados exactamente a lo que buscan contratar.

Supera los filtros ATS

Ventajas ofrecidas por este puesto de trabajo

Competitive pay
Tax‑advantaged Health Savings Account/
Disability insurance
Life insurance
Paid time off
401(k) with company match
Tuition reimbursement
Parental leave
Voluntary insurance options
Wellness program

Descripción de la vacante

The Weitz Company’s EPI Power division seeks a Project Engineer for data center construction in Des Moines, IA. You will connect engineering, VDC, procurement and field teams to ensure electrical installations are coordinated, documented, and built to drawings from preconstruction through closeout.

This hands-on role requires problem solving and growth in a dynamic environment. Six‑day workweek; collaborate across multi‑discipline teams using ACC, Revizto, Navisworks, Revit and Bluebeam to

Formación

  • Bachelor's degree required in Electrical Engineering, Construction Management or related field (must have).
  • 2+ years of experience as a project engineer or field engineer, ideally with an electrical contractor.
  • Able to read and understand electrical drawings, one‑lines, panel schedules and specifications.
  • Working knowledge of RFIs, submittals and construction documentation.
  • Strong organization and follow‑up; able to manage several deliverables and deadlines at once.
  • Clear written and verbal communication.
  • Comfortable with Microsoft Office, especially Excel.

Responsabilidades

  • Review electrical drawings, specifications and project scope.
  • Review BIM models and shop drawings with the VDC team.
  • Identify and help resolve technical and coordination issues.
  • Make sure work complies with project drawings and specifications.
  • Issue and track RFIs.
  • Help prepare and track material take-offs (MTOs).
  • Support engineering deliverables, including cable schedules, panel schedules and as‑builts.
  • Help prepare and track submittals.
  • Track engineering deliverables and project deadlines.
  • Keep engineering logs and project documentation current.
  • Coordinate with the Engineering, VDC, Procurement, Prefabrication and Field teams.
  • Join coordination and project meetings.
  • Support procurement and material tracking.
  • Support prefabrication coordination.
  • Give the field team technical support.
  • Support the Engineering Project Manager and Project Manager.
  • Support quality control and installation verification.
  • Help with as‑built documentation and project closeout.

Conocimientos

Reading electrical drawings
RFI management
Submittals management
Project coordination
Documentation & records
Communication skills
Excel proficiency

Educación

Bachelor's degree in Electrical Engineering, Construction Management or related field

Herramientas

Autodesk Construction Cloud (ACC)
Revizto
Navisworks
Revit
Bluebeam
Excel

Descripción del empleo

Job Description:

As a Project Engineer, you'll connect engineering, VDC, procurement and the field. You'll make sure our electrical installations are coordinated, documented and built to the drawings and specifications from preconstruction through closeout. This is a hands‑on role for someone who likes solving technical problems and wants to grow in data center construction.

EPI Power, LLC ("EPI") is a licensed electrical contractor and subsidiary of The Weitz Company that specializes in data centers. Our mission is to safely deliver industry‑leading electrical construction solutions on a fast-track basis. We believe our employees to be our most valuable asset, and we are committed to growing a diverse and inclusive culture that inspires, motivates, and continuously improves.

This role requires the ability to work 6 days per week, Monday - Saturday.

What You'll Do:
Engineering & Technical Review
  • Review electrical drawings, specifications and project scope
  • Review BIM models and shop drawings with the VDC team
  • Identify and help resolve technical and coordination issues
  • Make sure work complies with project drawings and specifications
Engineering Deliverables
  • Issue and track RFIs
  • Help prepare and track material take-offs (MTOs)
  • Support engineering deliverables, including cable schedules, panel schedules and as‑builts
  • Help prepare and track submittals
  • Track engineering deliverables and project deadlines
  • Keep engineering logs and project documentation current
Coordination & Support
  • Coordinate with the Engineering, VDC, Procurement, Prefabrication and Field teams
  • Join coordination and project meetings
  • Support procurement and material tracking
  • Support prefabrication coordination
  • Give the field team technical support
  • Support the Engineering Project Manager and Project Manager
Quality & Closeout
  • Support quality control and installation verification
  • Help with as‑built documentation and project closeout
What We're Looking For:
Required:
  • Bachelor's degree in Electrical Engineering, Construction Management or a related field
  • 2+ years of experience as a project engineer or field engineer, ideally with an electrical contractor
  • Able to read and understand electrical drawings, one‑lines, panel schedules and specifications
  • Working knowledge of RFIs, submittals and construction documentation
  • Strong organization and follow‑up; able to manage several deliverables and deadlines at once
  • Clear written and verbal communication
  • Comfortable with Microsoft Office, especially Excel
Preferred
  • Experience on data center or other mission‑critical projects
  • Experience with Autodesk Construction Cloud (ACC), Revizto, Navisworks, Revit or Bluebeam
  • Understanding of BIM/VDC coordination
  • Exposure to prefabrication or DFMA
  • Knowledge of the NEC
What We Offer:
  • Competitive Pay
  • Comprehensive Benefits Package with Tax‑Advantaged HSA and FSA offerings
  • Employer‑Paid Short‑and Long‑Term Disability Programs
  • Employer‑Paid Life Insurance
  • Generous Paid Time Off Provisions
  • 401K Retirement Savings Plan with Company Match
  • Tuition Reimbursement
  • Fully Paid Parental Leave
  • Voluntary Products Including: Critical Illness Insurance and Accident Insurance
  • Corporate Wellness Program with Wellness Time Off and Rewards

#LI‑LD1

Visa sponsorship is not available for this position at this time.

The Company does not accept unsolicited resumes from search firms or agencies. Any resume submitted to any employee of the Company without a prior written search agreement will be considered unsolicited and the property of the Company. Please, no phone calls or emails.

Consigue la evaluación confidencial y gratuita de tu currículum.

o arrastra y suelta tu archivo aquí

Similar jobs

Puestos de trabajo similares que vale la pena comparar

Project Engineer (Electrical) - Data Center Construction
Project Engineer (Electrical) - Data Center Construction

The Weitz Company • Oklahoma

Presencial
USD 60.000 - 90.000
Competitive Pay
Comprehensive Benefits Package with HS
Employer-Paid Short- and Long-Term DI
+7
Project Engineer (Electrical) - Data Center Construction
Project Engineer (Electrical) - Data Center Construction

EPI Power • Council Hill (OK)

Presencial
USD 75.000 - 115.000
Competitive Pay
Comprehensive Benefits Package
Employer-Paid Disability & Life
+5
Project Engineer (Electrical) - Data Center Construction
Project Engineer (Electrical) - Data Center Construction

WEITZ-ABITAT MISSION CRITICAL • Des Moines (IA)

Presencial
USD 85.000 - 110.000
Competitive Pay
Comprehensive Benefits
Disability Insurance
+6
Project Engineer (Electrical) - Data Center Construction
Project Engineer (Electrical) - Data Center Construction

The Weitz Company • McLean (VA)

Presencial
USD 75.000 - 105.000
Competitive Pay
Comprehensive Benefits Package
Tuition Reimbursement
+3
Project Engineer (Electrical) - Data Center Construction
Project Engineer (Electrical) - Data Center Construction

WEITZ-ABITAT MISSION CRITICAL • San Marcos (TX)

Presencial
USD 70.000 - 95.000
Competitive Pay
Benefits package with HSA/FSA
Disability programs
+6
Virtual Design & Construction (VDC) Engineer
Virtual Design & Construction (VDC) Engineer

EPI Power • Council Hill (OK)

Presencial
USD 90.000 - 120.000
Virtual Design & Construction (VDC) Engineer/Coordinator
Virtual Design & Construction (VDC) Engineer/Coordinator

EPI Power • Des Moines (IA)

Presencial
USD 70.000 - 110.000
Competitive salary
Benefits
Electrical Assistant Project Manager
Electrical Assistant Project Manager

The Weitz Company • Des Moines (IA)

Presencial
USD 90.000 - 120.000
Competitive Pay
Benefits Package
Disability Insurance
+6
Virtual Design & Construction (VDC) Engineer
Virtual Design & Construction (VDC) Engineer

EPI Power • Des Moines (IA)

Presencial
USD 90.000 - 125.000
Virtual Design & Construction (VDC) Engineer
Virtual Design & Construction (VDC) Engineer

The Weitz Company • San Marcos (TX)

Presencial
USD 90.000 - 130.000