Project Engineer (Electrical) - Data Center Construction

The Weitz Company / Contrack Watts, Inc.

Boydton (VA)

On-site

USD 65,000 - 90,000

Full time

14 days+
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Benefits offered by this job

Competitive Pay
Health benefits with HSA/FSA
Disability programs
Life insurance
Paid time off
401K with company match
Tuition reimbursement
Parental leave

Job summary

EPI Power, LLC, a subsidiary of The Weitz Company, is hiring a Project Engineer to support multiple project phases including planning, buyout, management, and closeout. Travel/relocation may be required based on project needs, and candidates with 1–2 years of experience or related internships are encouraged to apply.

The role emphasizes coordinating with Engineering, VDC, Procurement, and Field teams, ensuring drawings and specs are followed, and assisting with submittals, RFIs, and MTOs.

Qualifications

  • 1–2 years of experience as a Project Engineer or in a similar role.
  • Engineering degree is a plus
  • LEAN principles experience is desirable
  • Knowledge of NEC code is a plus
  • Strong written and verbal communication skills
  • Desire to work in a collaborative, supportive team environment

Responsibilities

  • Review electrical drawings, specifications, and project scope.
  • Coordinate with VDC team and review BIM/shop drawings.
  • Assist with submittals preparation and tracking.
  • Support procurement and material tracking.
  • Participate in coordination and project meetings.
  • Support prefabrication coordination.
  • Maintain engineering logs and documentation.
  • Coordinate with Engineering, VDC, Procurement, and Field teams.
  • Ensure compliance with project drawings and specifications.
  • Support Engineering Project Manager and Project Manager.
  • Identify and help resolve technical and coordination issues.
  • Support quality control and installation verification.
  • Assist with as‑built documentation and project closeout.
  • Track engineering deliverables and project deadlines.
  • Coordinate with field team and provide technical support.
  • Issue and track RFIs.
  • Support preparation and tracking of MTOs.
  • Support engineering deliverables (cable schedules, panel schedules, as‑builts)

Skills

Initiative
Analytical thinking
Communication
Team collaboration
Attention to detail
Flexibility

Education

Engineering degree preferred

Tools

Word
PowerPoint
Excel
Outlook
Revit
AutoCAD
Navisworks
JDE
Procore
Bluebeam

Job description

Are you looking to join a company with opportunity for growth and development? EPI Power is hiring a Project Engineer to be responsible for several functions throughout the duration of assigned projects including planning, buyout, management and closeout. This role actively assists the project team in monitoring project status and identifying issues that may impact the project schedule and/or budget. The ideal candidate is open to travel and/or relocation based on upcoming project needs. EPI is hiring both entry-level and experienced Project Engineer candidates.

This role requires the ability to work 6 days per week, Monday - Saturday.

EPI Power, LLC ("EPI") is a licensed electrical contractor and subsidiary of The Weitz Company that specializes in data centers. Our mission is to safely deliver industry-leading electrical construction solutions on a fast-track basis. We believe our employees to be our most valuable asset, and we are committed to growing a diverse and inclusive culture that inspires, motivates, and continuously improves.

What You'll Do:
  • Review electrical drawings, specifications, and project scope
  • Coordinate with VDC team and review BIM/shop drawings
  • Assist with submittals preparation and tracking
  • Support procurement and material tracking
  • Participate in coordination and project meetings
  • Support prefabrication coordination
  • Maintain engineering logs and documentation
  • Coordinate with Engineering, VDC, Procurement, and Field teams
  • Ensure compliance with project drawings and specifications
  • Support Engineering Project Manager and Project Manager
  • Identify and help resolve technical and coordination issues
  • Support quality control and installation verification
  • Assist with as‑built documentation and project closeout
  • Track engineering deliverables and project deadlines
  • Coordinate with field team and provide technical support
  • Issue and track RFIs
  • Support preparation and tracking of MTOs
  • Support engineering deliverables (cable schedules, panel schedules, as‑builts)
What We're Looking For:
  • Experience:
    • 1-2 years of experience as a Project Engineer or in a similar role, industry related degree/coursework, or related internship experience
    • Engineering degree is a plus
    • LEAN principles experience is desirable
    • Knowledge of NEC code is a plus
  • Skills:
    • Displays a high level of initiative and is comfortable making independent judgement
    • Analytical thinker who enjoys solving problems
    • Excellent written and verbal communication skills
    • Desire to work in a collaborative, supportive, team environment
    • Organized and a high attention to detail
    • Flexibility
  • Technology:
    • Proficient in basic computer software including Microsoft Word, PowerPoint, Excel, and Outlook
    • Autodesk software programs (Revit AutoCAD and Navisworks)
    • Ability to learn specific job‑related software upon hire (JDE, Procore, Bluebeam, scheduling software, etc.)
What We Offer:
  • Competitive Pay
  • Comprehensive Benefits Package with Tax‑Advantaged HSA and FSA offerings
  • Employer‑Paid Short‑and‑Long‑Term Disability Programs
  • Employer‑Paid Life Insurance
  • Generous Paid Time Off Provisions
  • 401K Retirement Savings Plan with Company Match
  • Tuition Reimbursement
  • Fully Paid Parental Leave
  • Voluntary Products Including: Critical Illness Insurance and Accident Insurance
  • Corporate Wellness Program with Wellness Time Off and Rewards

Visa sponsorship is not available for this position at this time.

The Company does not accept unsolicited resumes from search firms or agencies. Any resume submitted to any employee of the Company without a prior written search agreement will be considered unsolicited and the property of the Company. Please, no phone calls or emails.

The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates) recognizes the value of and is committed to hiring and retaining a diverse and inclusive workforce. We are an Equal Opportunity Employer and follow applicable affirmative action guidelines and policies. All qualified applicants will receive consideration for employment (including minorities, females, veterans, and individuals with disabilities, regardless of sexual orientation, gender identity, or other protected categories in accordance with applicable state and federal laws). The Company is a drug and alcohol‑free workplace and background checks are required if applicable. Click hereto review our Privacy Notice.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Project Engineer (Electrical) - Data Center Construction
Project Engineer (Electrical) - Data Center Construction

Epi Power • McLean (VA)

On-site
USD 65,000 - 90,000
Competitive Pay
Benefits Package with HSA/FSA
Employer‑Paid Disability Insurance
+2
Project Engineer (Electrical) - Data Center Construction
Project Engineer (Electrical) - Data Center Construction

EPI Power • Boydton (VA)

On-site
USD 65,000 - 85,000
Competitive Pay
Comprehensive Benefits Package
Tuition Reimbursement
+1
Project Engineer (Electrical) - Data Center Construction
Project Engineer (Electrical) - Data Center Construction

EPI Power • Des Moines (IA)

On-site
USD 65,000 - 85,000
Competitive Pay
Comprehensive Benefits Package
401K Retirement Savings Plan with Company Match
+1
Electrical Engineer - Data Center Construction
Electrical Engineer - Data Center Construction

EPI Power • McLean (VA)

On-site
USD 70,000 - 90,000
HSA/FSA offerings
Disability insurance
Life Insurance
+6
Project Engineer (Electrical) - Data Center Construction
Project Engineer (Electrical) - Data Center Construction

EPI Power • Cedar Rapids (IA)

On-site
USD 65,000 - 80,000
Competitive Pay
Comprehensive Benefits Package
401K Retirement Savings Plan with Company Match
+2
Electrical Project Engineer
Electrical Project Engineer

The Weitz Company / Contrack Watts, Inc. • Des Moines (IA)

On-site
USD 65,000 - 90,000
Competitive Pay
Benefits Package with HSA/FSA
Disability Insurance
+7
Electrical Project Engineer
Electrical Project Engineer

Weitz • Virginia (IL), Northern (KY)

Hybrid
USD 70,000 - 100,000
Competitive Pay
Health benefits
401K retirement savings
Assistant Project Manager
Assistant Project Manager

Weitz • Oklahoma

On-site
USD 75,000 - 105,000
Competitive Pay
Health savings account and FSA
Disability programs
+7
Assistant Project Manager (Traveling)
Assistant Project Manager (Traveling)

EPI Power • Council Hill (OK)

On-site
USD 65,000 - 90,000
Competitive Pay
Benefits package with HSA and FSA
Disability programs (short/long-term)
+6
Virtual Design & Construction (VDC) Engineer
Virtual Design & Construction (VDC) Engineer

EPI Power • McLean (VA)

On-site
USD 90,000 - 130,000
Competitive pay
Comprehensive benefits package
Disability insurance
+7