Pipe Layer: Water & Sewer Construction Pro

The Walsh Group - Walsh Construction & Archer Western

Hutto (TX)

On-site

USD 50,000 - 75,000

Full time

14 days+

Get more replies from employers

Send a job-specific resume in minutes.

Job summary

The Walsh Group, Archer Western Construction is seeking a Pipe Layer for the Central Water Group/Hutto South WWTP Expansion in Hutto, TX. The Pipe Layer will lay, join, wrap and seal pipe for water mains and sanitary sewer on commercial, industrial, or heavy civil sites, using hand and power tools as needed.

Responsibilities include coordinating with crew members, handling equipment, and performing physical labor as required.

Qualifications

  • 1 Year Verifiable Experience Preferred
  • Must be able to lift up to 50 lbs; may be required to work in adverse weather conditions
  • Requires the ability to comply with all safety policies and procedures; communicate effectively with co-workers and supervisors to ensure projects are completed properly
  • Possess a strong work ethic and desire to learn
  • Requires good manual dexterity; may be standing, bending, kneeling or sitting for long periods
  • Must be able to pass a pre-employment drug screening

Responsibilities

  • Lays, joins, aligns, wraps, and seals pipe sections, clay, concrete and other types of pipe for water/gas main, sanitary sewer
  • Ability to work with crew members and operate a variety of hand and power tools including drills, hammers, and other tools as directed by management
  • Ability to perform tasks including physical labor as instructed by supervisor

Tools

Hand tools
Power tools

Job description

The Walsh Group, Archer Western Construction is seeking a Pipe Layer for the Central Water Group/Hutto South WWTP Expansion in Hutto, TX. The Pipe Layer will lay, join, wrap and seal pipe for water mains and sanitary sewer on commercial, industrial, or heavy civil sites, using hand and power tools as needed.

Responsibilities include coordinating with crew members, handling equipment, and performing physical labor as required.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Pipe Layer — Build Essential Water Infrastructure
Pipe Layer — Build Essential Water Infrastructure

Energy Job Shop • Hutto (TX)

On-site
USD 35,000 - 50,000
Competitive wages
Medical, Dental & Vision Insurance
Paid Time Off (PTO)
+4
Pipe Layer: Water & Wastewater Construction | Career Growth
Pipe Layer: Water & Wastewater Construction | Career Growth

The Walsh Group - Walsh Construction & Archer Western • Saint Hedwig (TX)

On-site
USD 42,000 - 64,000
Pipe Layer: Water and Sewer Infrastructure Builder
Pipe Layer: Water and Sewer Infrastructure Builder

The Walsh Group - Walsh Construction & Archer Western • Waxahachie (TX)

On-site
USD 30,000 - 41,000
Pipe Layer: Build Water Infrastructure Nationwide (Training)
Pipe Layer: Build Water Infrastructure Nationwide (Training)

92 Archer Western Construction, LLC • Waxahachie (TX)

On-site
USD 42,000 - 63,000
Opportunity to work nationwide
Bonus potential
Industry-leading training
Pipe Layer: Build Water & Sewer Systems, Travel & Training
Pipe Layer: Build Water & Sewer Systems, Travel & Training

92 Archer Western Construction, LLC • Arcadia (FL)

On-site
Bonus
Benefits
Pipeline Installer — Water & Sewer Construction Pro
Pipeline Installer — Water & Sewer Construction Pro

92 Archer Western Construction, LLC • Saint Hedwig (TX)

On-site
USD 25,000 - 41,000
Bonus eligibility
Benefits package
Pipe Layer: Build Water & Sewer Pipelines
Pipe Layer: Build Water & Sewer Pipelines

The Walsh Group - Walsh Construction & Archer Western • Arcadia (FL)

On-site
USD 48,000 - 64,000
Pipe Layer - National Travel & Training Opportunities
Pipe Layer - National Travel & Training Opportunities

walshgroup • Saint Hedwig (TX)

On-site
USD 42,000 - 65,000
Pipelayer
Pipelayer

Energy Job Shop • Hutto (TX)

On-site
USD 35,000 - 50,000
Competitive wages
Medical, Dental & Vision Insurance
Paid Time Off (PTO)
+4
Pipe Layer - Build Water & Sewer Infrastructure
Pipe Layer - Build Water & Sewer Infrastructure

walshgroup • Arcadia (FL)

On-site
USD 25,000 - 39,000