Pharma Maintenance Tech II — 24/7 Uptime Impact

FUJIFILM Biotechnologies

Holly Springs (NC)

On-site

USD 65,000 - 90,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

FUJIFILM Biotechnologies in Holly Springs, NC, is seeking a Technician 2, Maintenance to install, maintain, and repair process systems for pharmaceutical manufacturing. The role requires conducting preventive maintenance and inspections to ensure equipment uptime and compliance with GMP.

You will work on a day shift within a 24/7 manufacturing environment, supporting site operations and safety initiatives while contributing to SOP development and equipment optimization.

Qualifications

  • High School Diploma or GED required.
  • 2–4 years of maintenance experience preferred.
  • Experience with GMP environments and safety procedures.
  • CMMS experience is preferred.

Responsibilities

  • Performs preventive maintenance and repairs on process equipment such as bioreactors, centrifuges, ultrafiltration skids, parts washers, autoclaves, isolators, and fillers.
  • Provides recommendations to develop preventive maintenance plans to minimize equipment downtime.
  • Contributes to SOP development and revisions for process maintenance activities.
  • Diagnoses and troubleshoots equipment malfunctions.
  • Assists in installation and commissioning of new equipment.
  • Maintains accurate maintenance records and documentation.
  • Follows GMP and safety requirements.

Skills

Mechanical knowledge
Electrical knowledge
Control systems
GMP knowledge
Effective communication
Teamwork
Lean manufacturing
Problem-solving
Training others
24/7 support

Education

High School Diploma/GED
Associate degree in Mechanical/Electrical/Chemical Engineering

Tools

CMMS

Job description

FUJIFILM Biotechnologies in Holly Springs, NC, is seeking a Technician 2, Maintenance to install, maintain, and repair process systems for pharmaceutical manufacturing. The role requires conducting preventive maintenance and inspections to ensure equipment uptime and compliance with GMP.

You will work on a day shift within a 24/7 manufacturing environment, supporting site operations and safety initiatives while contributing to SOP development and equipment optimization.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Pharma Process Equipment Tech – 24/7 Maintenance
Pharma Process Equipment Tech – 24/7 Maintenance

FUJIFILM • Holly Springs (NC)

On-site
USD 65,000 - 90,000
Pharma Maintenance Technician — 24/7 Process Equipment
Pharma Maintenance Technician — 24/7 Process Equipment

FUJIFILM Biotechnologies • Holly Springs (NC)

On-site
USD 65,000 - 90,000
Pharma Equipment Maintenance Tech I (Day Shift)
Pharma Equipment Maintenance Tech I (Day Shift)

FUJIFILM Biotechnologies • Holly Springs (NC)

On-site
USD 42,000 - 62,000
Pharma Maintenance Technician II (GMP)
Pharma Maintenance Technician II (GMP)

FUJIFILM • Holly Springs (NC)

On-site
USD 55,000 - 75,000
Pharma Maintenance Technician — Night Shift
Pharma Maintenance Technician — Night Shift

FUJIFILM Biotechnologies • Holly Springs (NC)

On-site
USD 42,000 - 68,000
Pharma Equipment Technician (Night Shift)
Pharma Equipment Technician (Night Shift)

FUJIFILM • Holly Springs (NC)

On-site
USD 42,000 - 64,000
Biotech Maintenance Supervisor - GMP & 24/7 Ops
Biotech Maintenance Supervisor - GMP & 24/7 Ops

FUJIFILM Biotechnologies • Holly Springs (NC)

On-site
USD 95,000 - 125,000
Electrical Technician II: 24/7 Pharma Plant Maintenance
Electrical Technician II: 24/7 Pharma Plant Maintenance

FUJIFILM Biotechnologies • Holly Springs (NC)

On-site
USD 65,000 - 90,000
Biopharma Manufacturing Associate III — 24/7 Operations
Biopharma Manufacturing Associate III — 24/7 Operations

FUJIFILM • Holly Springs (NC)

On-site
USD 25,000 - 33,000
Maintenance Operations Lead - CGMP & 24/7 Support
Maintenance Operations Lead - CGMP & 24/7 Support

FUJIFILM Biotechnologies • Holly Springs (NC)

On-site
USD 95,000 - 130,000