Paint Line Technician - 2nd Shift

Sargent Metal Fabricators

Anderson (SC)

On-site

USD 34,000 - 44,000

Full time

14 days+

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Sargent Metal in Anderson, SC is hiring a Paint Line Technician to prepare, hang, and inspect metal parts for painting on a fast-paced line. This role requires strong attention to quality, safety, and teamwork.

Work Schedule: 2nd shift—Mon-Thu 4:30pm-3am with a $1.50 shift premium per hour. You will pack finished parts and help maintain a clean, safe production area. Candidates should be able to stand 10-12 hours, lift up to 50 pounds, and collaborate across departments to meet production goals.

Qualifications

  • Strong attention to detail, safety, and quality.
  • Ability to work independently, as a team member, and in a floating/utility capacity as needed.
  • Physical stamina to perform manual tasks, including lifting, bending, and standing for extended periods.
  • Stand for 10-12 hours per shift and lift up to 50 pounds on a continuous basis.
  • Strong work ethic and willingness to support team success across departments.

Responsibilities

  • Prepare metal parts for painting, including masking, cleaning, and inspection prior to processing.
  • Hang metal parts on a continuously moving paint line.
  • Monitor parts to ensure quality standards are met.
  • Remove painted parts from the line when complete.
  • Package finished parts accurately and safely for shipment.
  • Maintain productivity to keep pace with line speed and production goals.
  • Follow all safety, quality, and operational procedures.
  • Communicate effectively with supervisors and team members regarding workflow, quality issues, or equipment concerns.
  • Safely operate basic hand tools and equipment as instructed.
  • Maintain productivity while meeting quality standards and production requirements.
  • Follow all company policies, safety procedures, and OSHA regulations.
  • Support housekeeping efforts to keep work areas clean, organized, and safe.
  • Promote teamwork and contribute to a positive, respectful workplace culture.
  • Maintain punctual, regular, and reliable attendance.
  • Perform other duties as assigned to support production needs.

Skills

Attention to detail
Safety-conscious
Team player
Physical stamina
Manual dexterity
Reliability

Job description

Advertised Job Type: Permanent - Full-time regular employment

Work Type: On Site

Job Description

Work Schedule: 2nd Shift — Monday-Thursday 4:30pm-3am
Shift Premium: Additional $1.50 for each hour worked on 2nd shift
SUMMARY

The Paint Line Technician plays a critical role in the manufacturing process by preparing, hanging, and packaging metal parts to meet quality and production standards. This position requires attention to detail, physical stamina, and the ability to work efficiently in a fast-paced, team-oriented environment.

DUTIES AND RESPONSIBILITIES
Primary Functions

Prepare metal parts for painting, including masking, cleaning, and inspection prior to processing.

Hang metal parts of varying weights and sizes securely on a continuously moving paint line.

Monitor parts throughout the paint process to ensure quality standards are met.

Remove painted parts from the line once complete.

Package finished parts accurately and safely for shipment.

Maintain consistent productivity to keep pace with line speed and production goals.

Follow all safety, quality, and operational procedures.

Communicate effectively with supervisors and team members regarding workflow, quality issues, or equipment concerns.

Safely operate basic hand tools and equipment as instructed.

Maintain productivity while meeting quality standards and production requirements.

Follow all company policies, safety procedures, and OSHA regulations.

Support housekeeping efforts to keep work areas clean, organized, and safe.

Promote teamwork and contribute to a positive, respectful workplace culture.

Maintain punctual, regular, and reliable attendance.

Perform other duties as assigned to support production needs.

QUALIFICATIONS

Strong attention to detail, safety, and quality.

Ability to work independently, as a team member, and in a floating/utility capacity as needed.

Physical stamina to perform manual tasks, including lifting, bending, and standing for extended periods of time.

Ability to stand for 10-12 hours per shift and lift up to 50 pounds on a continuous basis.

Strong work ethic and willingness to support team success across departments.

PURPOSE STATEMENT

“We exist to provide opportunities for our team to THRIVE personally and professionally and join in helping our community.”

CORE VALUES

Positive attitudes are contagious.

Success comes from humility, integrity, and hard work.

Always do the right thing.

Strive for excellence in serving our customers, teammates, and community.

This job description is to outline the primary duties, qualifications, and job scope, but not be limited to the assigned responsibilities listed. It is our expectation that each team member offers their services whenever necessary to ensure the success of Sargent Metal.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Paint Line Technician – 2nd Shift with Premium Pay
Paint Line Technician – 2nd Shift with Premium Pay

Sargent Metal Fabricators • Anderson (SC)

On-site
USD 34,000 - 44,000
Paint Line Operator, 2nd Shift
Paint Line Operator, 2nd Shift

GH Metal Solutions • Fort Payne (AL)

On-site
USD 32,000 - 52,000
Paint Line Loader / Unloader - 2nd Shift
Paint Line Loader / Unloader - 2nd Shift

AOC Metal Works • Chester (VA)

On-site
USD 17,000 - 25,000
Paint Technician (2nd Shift)
Paint Technician (2nd Shift)

iMPact Business Group • Lansing (MI)

On-site
USD 52,000 - 68,000
Paintline Worker 2nd Shift (3:00pm-11:00pm)
Paintline Worker 2nd Shift (3:00pm-11:00pm)

Havis, Inc. • Warminster Township

On-site
USD 20,457 - 29,136
Industrial Paint Prep Technician — Entry-Level, 2nd Shift
Industrial Paint Prep Technician — Entry-Level, 2nd Shift

Laborup • Morristown (TN)

On-site
USD 26,000 - 29,000
Spot Weld/Pem Operator - 2nd Shift
Spot Weld/Pem Operator - 2nd Shift

Sargent Metal Fabricators • Anderson (SC)

On-site
USD 25,000 - 39,000
Shift premium
Assembly Technician - 2nd Shift
Assembly Technician - 2nd Shift

Sargent Metal Fabricators • Anderson (SC)

On-site
USD 22,000 - 30,000
Entry-Level Industrial Paint Prep Tech — 2nd Shift
Entry-Level Industrial Paint Prep Tech — 2nd Shift

Laborup • Morristown (NJ)

On-site
USD 26,000 - 29,000
Paint Line Helper - 1st and 3rd Shift
Paint Line Helper - 1st and 3rd Shift

Metalcraft of Mayville, Inc. • Fall River (WI)

On-site
USD 6,900 - 9,600
Competitive pay
Paid holidays & vacation
On-the-job training
+2