OSP Superintendent - Data Center Construction Lead

Leapros, Inc.

Montgomery (AL)

On-site

USD 39,000 - 55,000

Part time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

Medical, dental, and vision insurance
Paid Sick Time
Employee assistance programs (EAP)

Job summary

Leapros Skilled Trades in Montgomery, AL seeks an OSP Superintendent to lead on-site operations for a medium to large-scale outside plant data center project. You will oversee safety, quality, timelines, staffing, and financial performance while coordinating with the customer and internal teams.

The role requires strong telecommunications or construction background, proven supervisory experience, and the ability to lead crews, troubleshoot field issues, and drive projects to successful

Qualifications

  • Minimum of three (3) years of supervisory or managerial experience in a construction or telecommunications environment.
  • Minimum of three (3) years of experience as a Lead Communications Technician or in a similar technical leadership position.
  • Minimum of five (5) years of experience in telecommunications or a related technical or construction field, with demonstrated outside plant (OSP) knowledge.
  • Demonstrated verifiable ability to define a project, create a project scope of work, develop an estimate, outline detailed associated tasks, and manage these through to final completion and customer turnover.
  • Proficiency with Microsoft Office Suite, including Word, Excel, and MS Project.
  • Ability to interpret blueprints and other project documents including specifications, reporting requirements, and quality standards at a high skill level.
  • Ability to learn and teach company and customer project management systems.

Responsibilities

  • Act as the senior on-site company liaison for operational interface with customer representatives and attend facility and construction meetings as required.
  • Plan for, manage, monitor, and maintain project profitability to achieve company goals while ensuring deadlines are met per customer requirements.
  • Manage overall workload distribution and staffing levels, monitoring customer delivery and job installation progress throughout the project lifecycle.
  • Ensure successful job completion by driving productivity, maintaining compliance with project budgets, and reviewing all job cost postings for accuracy and completeness, including invoices, customer collections, and periodic financial reporting.
  • Fully complete all project paperwork accurately and on time, including timesheets, material transfers, work orders, change orders, and tool transfers; ensure all Job Closing Packages meet customer and company standards.
  • Perform quality checks, manage the prevention of outages, conduct day-to-day job walks to ensure quality standards are met, and prepare red-lined as-built drawings.
  • Demonstrate a detailed level of technical knowledge when performing work, troubleshooting and resolving technical issues as they arise in the field.
  • Review and monitor operational processes for accuracy, completeness, and efficiency, including estimating, purchasing, invoicing, warehousing, scheduling, and reporting; develop and implement process improvements as needed.
  • Actively promote safety as the first priority; in concert with the Training Department, monitor all quality and safety issues related to field operations and lead operations meetings and training sessions.
  • Manage tools and truck inventory and maintenance, and ensure all outside plant activities adhere to project timelines and quality standards.

Skills

Supervisory experience
Lead Communications Technician
OSP knowledge
MS Office Suite
Blueprint interpretation
Field troubleshooting
Project management

Tools

Punch tool (110 block/66 block)
6/8 position crimp tool
Krone/3M/BIX
Butt set
Volt-Ohm meter
4-pair continuity tester
5-gang punch tool

Job description

Leapros Skilled Trades in Montgomery, AL seeks an OSP Superintendent to lead on-site operations for a medium to large-scale outside plant data center project. You will oversee safety, quality, timelines, staffing, and financial performance while coordinating with the customer and internal teams.

The role requires strong telecommunications or construction background, proven supervisory experience, and the ability to lead crews, troubleshoot field issues, and drive projects to successful

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

OSP Superintendent
OSP Superintendent

Leapros, Inc. • Montgomery (AL)

On-site
USD 39,000 - 55,000
Medical, dental, and vision insurance
Paid Sick Time
Employee assistance programs (EAP)
OSP Field Superintendent
OSP Field Superintendent

Manatal • Montgomery (AL)

On-site
USD 70,000 - 90,000
Company-paid medical coverage
401(k)
Paid time off
+2
OSP Field Superintendent — Hyperscale Data Center
OSP Field Superintendent — Hyperscale Data Center

Manatal • Montgomery (AL)

On-site
USD 70,000 - 90,000
Company-paid medical coverage
401(k)
Paid time off
+2
Outside Plant Ops Supervisor - Field Lead (Fiber)
Outside Plant Ops Supervisor - Field Lead (Fiber)

SecureVision, LLC • Seascape (FL)

On-site
USD 55,000 - 60,000
Senior On-Site Superintendent – Telecom Construction
Senior On-Site Superintendent – Telecom Construction

Leapros, Inc. • El Paso (TX)

On-site
USD 52,000 - 76,000
Medical insurance
Dental Insurance
Vision insurance
+1
On-Site Mission-Critical Data Center Superintendent
On-Site Mission-Critical Data Center Superintendent

Quality Labor Management, LLC • Montgomery (AL)

On-site
USD 103,000 - 124,000
Medical Insurance
Dental Insurance
Vision Insurance
+2
Senior OSP Field Construction Leader
Senior OSP Field Construction Leader

Network Connex Company • Manassas (VA)

On-site
USD 90,000 - 115,000
Medical insurance
Dental insurance
Vision insurance
+6
Senior Data Center Field Leader
Senior Data Center Field Leader

Network Connex Company • Monroe (LA)

On-site
USD 120,000 - 170,000
401(k) plan with match
10 paid company holidays
PTO accrual schedule
+1
Senior Electrical Superintendent - Data Center Power Lead
Senior Electrical Superintendent - Data Center Power Lead

Spencer Ogden • Cheyenne (WY)

On-site
USD 130,000 - 170,000
Data Center Crew Lead: Onsite Safety & Leadership
Data Center Crew Lead: Onsite Safety & Leadership

Leapros, Inc. • San Antonio (TX)

On-site
USD 39,000 - 48,000
Medical insurance
Dental insurance
Vision insurance
+2