On-Site Project Engineer: Construction & Scheduling

Cccjph

Florida

On-site

USD 70,000 - 110,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Cccjph is seeking a Project Engineer to serve as the technical link between project management, construction supervision, and crafts to ensure compliance with codes, drawings, and specifications.

The role requires travel to project sites for the duration and a four-year engineering or related degree with at least three years of heavy industrial construction experience. You will coordinate change orders, monitor costs, and support subcontract management while using project management software.

Qualifications

  • A four-year engineering, construction, or related degree.
  • Minimum of three years heavy industrial construction engineering/manufacturing experience.
  • Knowledge of drawings, specs, and project documentation.

Responsibilities

  • Ensure engineering activities meet contract requirements and support overall construction schedule.
  • Provide technical support for construction planning and design, interpretation of design and application of construction methods.
  • Develop, implement and administer project engineering procedures and other work controlling documents.
  • Prepare project cost control, budgeting, and tracking records; manage cost reports and changes.
  • Review budgets, change orders, and subcontract coordination to support timely project delivery.
  • Interpret drawings for craft supervisors and resolve design conflicts; prepare RFIs and tracking logs.

Skills

Project management
Construction supervision
RFI tracking
Cost control

Education

Bachelor's degree in Engineering

Tools

CAD software
Cost tracking tools

Job description

Cccjph is seeking a Project Engineer to serve as the technical link between project management, construction supervision, and crafts to ensure compliance with codes, drawings, and specifications.

The role requires travel to project sites for the duration and a four-year engineering or related degree with at least three years of heavy industrial construction experience. You will coordinate change orders, monitor costs, and support subcontract management while using project management software.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Field-Driven Project Engineer: Budget & Schedule
Field-Driven Project Engineer: Budget & Schedule

Energy Jobline ZR • Bartow (FL)

On-site
USD 80,000 - 110,000
Onsite Construction Project Engineer — Schedule Lead
Onsite Construction Project Engineer — Schedule Lead

Caddell Construction • Alabama

Hybrid
USD 55,000 - 75,000
Paid vacations
Holidays paid by company
Medical insurance
+4
Project Engineer: Onsite Construction Lead (Travel)
Project Engineer: Onsite Construction Lead (Travel)

Walbridge • Indiana (PA)

Hybrid
USD 75,000 - 95,000
On-Site Construction Project Engineer – Lead & Deliver
On-Site Construction Project Engineer – Lead & Deliver

Clark Holdings Inc. • Richmond (VA)

Hybrid
USD 50,000 - 140,000
Health benefits
Paid time off
401k
+4
Project Engineer
Project Engineer

CCC Group • Florida

On-site
USD 70,000 - 110,000
Project Engineer: Onsite Construction Lead (Travel)
Project Engineer: Onsite Construction Lead (Travel)

Walbridge • Town of Vermont (WI)

Remote
USD 75,000 - 95,000
Onsite Project Engineer – Construction & Coordination
Onsite Project Engineer – Construction & Coordination

Caddell Construction • El Paso (TX)

On-site
USD 65,000 - 90,000
Paid vacations
Company-paid holidays
Company-funded medical insurance
+5
Project Engineer I - Leadership Track (On-Site, Travel)
Project Engineer I - Leadership Track (On-Site, Travel)

PC Construction Company • Jacksonville (FL)

On-site
USD 65,000 - 90,000
100% Employee-owned
Construction Project Engineer: Site Lead & Scheduling Pro
Construction Project Engineer: Site Lead & Scheduling Pro

Innovative Project Solutions • San Jose (CA)

On-site
USD 70,000 - 90,000
Project Engineer: Onsite Construction Lead (Travel)
Project Engineer: Onsite Construction Lead (Travel)

Walbridge • Pennsylvania

Remote
USD 70,000 - 90,000