A complete application in a minute
Tailored resume and cover letter, ready to send.
Nevada Gold Mines (NGM) invites a motivated metallurgical/chemical engineering student to join a co-op placement at the world’s largest gold-producing complex. You will collaborate with production, maintenance, and support teams to drive projects from design to commissioning.
The role emphasizes environmental compliance, process improvement, and data-driven automation initiatives. A strong academic record and commitment starting January 2027 are required.
Are you a metallurgical/chemical engineering student interested in a co-op placement with the single largest gold-mining complex in the world? Nevada Gold Mines (NGM) is seeking a highly-motivated student for an exclusive opportunity!
Gain invaluable experience, while building your professional network in a team committed to your success. Let us help you reach your career goals!
Nevada Gold Mines (NGM) is a joint venture between Barrick (61.5%) and Newmont (38.5%) that combined our significant assets across Nevada in 2019 to create the single largest gold-producing complex in the world. NGM produces approximately 3.5 million ounces of gold a year. The massive mining operation comprises eight mines along with their associated infrastructure and processing facilities and hosts three of Barrick’s Tier One assets: Carlin, Cortez, and Turquoise Ridge. At NGM, our mission is to be the world’s most valued gold mining business by finding, developing, and owning the best assets, with the best people, to deliver sustainable returns for our owners and partners.
Nevada Gold Mines is committed to creating a diverse environment and is proud to be an equal opportunity employer. Thank you for your application, however, only those selected for an interview will be contacted.