Stand out for this role — generate a tailored resume and cover letter in about a minute.
Oracle is seeking a Construction Cost Estimator (IC3) to support data center development in Nashville, TN. This hands-on role translates drawings and specifications into transparent cost models and Basis of Estimate packages, collaborating with Design, Engineering, and Project Controls.
You will develop conceptual to detailed estimates across civil, structural, mechanical, electrical, and site-infrastructure scopes for multi-region data center programs, ensuring accuracy, traceability, and
Oracle is seeking a Construction Cost Estimator (IC3) to support data center development in Nashville, TN. This hands-on role translates drawings and specifications into transparent cost models and Basis of Estimate packages, collaborating with Design, Engineering, and Project Controls.
You will develop conceptual to detailed estimates across civil, structural, mechanical, electrical, and site-infrastructure scopes for multi-region data center programs, ensuring accuracy, traceability, and