Une candidature conçue pour ce poste — un CV et une lettre de motivation personnalisés qui correspondent à l’offre.
Rothe is seeking a Multimedia Systems Architect III to engineer, install, configure, test, and document Microsoft Teams Rooms (MTR) certified equipment in NASA collaboration spaces at Marshall Space Flight Center in Huntsville, Alabama. The role is hybrid, starting onsite with a minimum of three days per week in the office.
Occasional travel of 3-4 trips per year to other NASA centers is required; you will lead a contractor design team and oversee design, development, and testing of MTR systems
COMPENSATION:Up to $145k
Rothe is seeking a Multimedia Systems Architect III to engineer, install, configure, test, and document Microsoft Teams Rooms (MTR) certified equipment in NASA collaboration spaces for Workplace & Collaboration Services (WCS), at Marshall Space Flight Center in Huntsville, Alabama. The work will be in support of the NASA Enterprise Multimedia and Integrated Technical Services (eMITS) contract.
Lead a contractor design team and oversee the design, development, and testing of MTR certified, appliance-based room systems; manage multiple projects and provide daily and weekly reporting; provide technical analysis for new hardware, upgrades, risk assessments, and implementation plans; take part in NASA standards maintenance and hardware evaluation; review custom and non-standard room approaches to keep them simple and usable; plan for obsolescence, lifecycle tracking, and 5-7 year upgrade roadmaps; draft engineering plans, workflows, and cost estimates; lead engineering meetings with product owners, customers, and stakeholders; and maintain current MTR certifications. This position is hybrid, starting onsite, with a minimum of three days per week in the office. Occasional travel of 3-4 trips per year to other NASA centers is required.