Medical Lab Technologist/Technician Full-Time, Impactful Role

KA Recruiting Inc.

Bradley (WV)

On-site

USD 52,000 - 75,000

Full time

10 days ago
Application generator

Turn this role into an interview — a resume and cover letter built around what this employer wants.

Get past ATS filters

Benefits offered by this job

Health benefits
401K
PTO/EIB
Employee Assistance Program
Education assistance
CE assistance
Professional development opportunities

Job summary

KA Recruiting Inc. is recruiting for a permanent, full-time MT/MLT position in the West Virginia area. The Medical Technologist/Medical Laboratory Technician will assist phlebotomists, run tests, and verify sample integrity and reporting.

The role includes quality control, coordination of results with physicians, and timely communication with medical records. Qualified candidates hold MT/MLT certification and WV licensure, with strong critical thinking and ability to work under pressure in a

Qualifications

  • Bachelor's degree or equivalent in laboratory sciences.
  • MT/MLT certification and WV licensure required.
  • Ability to think critically and make decisive judgments in stressful environments.

Responsibilities

  • Assist phlebotomists in specimen collection and process tests as ordered.
  • Perform testing per physician orders and ensure accuracy of results.
  • Maintain sample identification and quality control; coordinate with units/physicians.
  • Handle specimens for delayed testing or referral to external labs as needed.
  • Report outpatient results promptly to physicians and medical records.
  • Provide timely and courteous phone support as needed.

Skills

Critical thinking
Decisive judgment
Work under pressure

Education

BA/BS or AA/AS in laboratory sciences
MT/MLT certification + WV licensure

Job description

KA Recruiting Inc. is recruiting for a permanent, full-time MT/MLT position in the West Virginia area. The Medical Technologist/Medical Laboratory Technician will assist phlebotomists, run tests, and verify sample integrity and reporting.

The role includes quality control, coordination of results with physicians, and timely communication with medical records. Qualified candidates hold MT/MLT certification and WV licensure, with strong critical thinking and ability to work under pressure in a

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Medical Laboratory Technician (MLT/MT) – Impactful Lab Work
Medical Laboratory Technician (MLT/MT) – Impactful Lab Work

WVU Medicine • New Martinsville (WV), Northern (KY)

Hybrid
USD 42,000 - 64,000
Microbiology Lab Technician (MLT/MT) — Full-Time
Microbiology Lab Technician (MLT/MT) — Full-Time

WVU • Wheeling (WV)

On-site
USD 40,000 - 55,000
MT/MLT - Medical Technologist / Medical Laboratory Technician
MT/MLT - Medical Technologist / Medical Laboratory Technician

KA Recruiting Inc. • Bradley (WV)

On-site
USD 52,000 - 75,000
Health benefits
401K
PTO/EIB
+4
Microbiology Medical Lab Tech — Precision & Impact
Microbiology Medical Lab Tech — Precision & Impact

WVU Medicine Thomas Hospitals • South Charleston (WV)

On-site
USD 40,000 - 60,000
Hematology Medical Technologist – Full-Time Lab
Hematology Medical Technologist – Full-Time Lab

WVU Medicine • Morgantown (WV)

On-site
USD 60,000 - 80,000
Lead Stem Cell Lab Technologist
Lead Stem Cell Lab Technologist

WVU Medicine • Morgantown (WV)

On-site
USD 55,000 - 75,000
Clinical Lab Technologist - Patient-Focused Diagnostics
Clinical Lab Technologist - Patient-Focused Diagnostics

WVU Medicine • Morgantown (WV)

On-site
USD 30,000 - 47,000
Part-Time Medical Laboratory Technician (MLT)
Part-Time Medical Laboratory Technician (MLT)

Marshall Health • Northern (KY)

Hybrid
USD 28,000 - 39,000
Medical Lab Tech/Technologist - Full-Time, Hands-On Analysis
Medical Lab Tech/Technologist - Full-Time, Hands-On Analysis

mhnetwork • Point Pleasant (WV)

On-site
USD 55,000 - 75,000
Clinical Lab Technologist - Precision Testing and Impact
Clinical Lab Technologist - Precision Testing and Impact

WVU • Uniontown

On-site
USD 55,000 - 75,000