Get a reply from this employer
Your resume and cover letter, tailored to exactly what they’re hiring for.
Corewell Health Urgent Care in Macomb, MI seeks full-time Medical Assistants or EMTs for our clinic at 15959 Hall Rd Suite 104. The role requires MA/EMT training and certification, with a floating 8am–8pm schedule, three shifts weekly, and rotating weekends/holidays. Travel to multiple locations may be required.
Responsibilities include triage, vital signs, EMR documentation, lab specimen collection, injections, and general admin duties while adhering to HIPAA and OSHA standards.
Corewell Health Urgent Care in Macomb, MI seeks full-time Medical Assistants or EMTs for our clinic at 15959 Hall Rd Suite 104. The role requires MA/EMT training and certification, with a floating 8am–8pm schedule, three shifts weekly, and rotating weekends/holidays. Travel to multiple locations may be required.
Responsibilities include triage, vital signs, EMR documentation, lab specimen collection, injections, and general admin duties while adhering to HIPAA and OSHA standards.