Master Scheduler

Lentech Inc.

Fort Meade (MD)

On-site

USD 138,000 - 148,000

Full time

14 days+

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Lentech Inc. in Fort Meade, MD seeks a Senior Scheduler to design, maintain, and integrate detailed Master Program Schedules for complex acquisition programs.

You will work with development and operations teams to keep schedules current and link them to program-level plans using MS Project or Primavera. Requirements: TS.SCI with FSP through MD, twelve years of scheduling experience in similar scope, and a Bachelor's degree in a technical or business field.

Qualifications

  • 12+ years of scheduling experience in programs/contracts of similar scope and complexity.
  • Active TS.SCI with FSP through MD required.
  • Two years of demonstrated experience managing a schedule for an engineering program using MS Project or Primavera.

Responsibilities

  • Design, develop, and maintain detailed resource-loaded schedules for implementation, developmental and operational systems.
  • Work with developmental and operational teams to keep schedules current and integrated into Master Program Schedule.

Skills

Scheduling
MS Project

Education

Bachelor's degree in technical or business discipline
MS Project/Primavera training

Tools

MS Project
Primavera

Job description

Responsibilities
  • Responsible for designing, developing, and maintaining detailed resource-loaded schedules for implementation, developmental and operational systems.
  • Works with developmental and operational teams to develop detailed schedules and assists in keeping these schedules current.
  • Uses or recommends automated tools such as MS Project, Primavera or program mandated software.
  • Develops and or modifies project schedules and or the integration of multiple project schedules into an overall Master Program Schedule.
  • Maintains the overall Master Program /Project Schedule. Links project schedules with the overarching program, Investment Portfolio, functional area and/or other Integrated Master Plans (IMPs).
  • Provides hands-on development of layered schedules and IMPs that address how an acquisition project is progressing and how that project contributes to overarching requirements and objectives.
  • Maintains status on linkages and dependencies with related projects.
Requirements
  • Active and current TS.SCI w FSP through MD
  • MS Project proficiency
  • Twelve (12) years’ experience as a Scheduler in programs and contracts of similar scope, type, and complexity.
Education
  • Bachelor’s degree in a technical or business discipline from an accredited college or university is required.
  • Four (4) years of additional scheduling experience may be substituted for a bachelor’s degree.
  • A Master’s degree may be substituted for two (2) years of experience, reducing the requirement to ten (10) years of experience.
  • Shall have two (2) years of demonstrated experience managing a schedule for an engineering program involving hardware and software development and multiple sub-components using MS Project or Primavera.
  • Shall have successfully completed an advanced level MS Project or Primavera course and have demonstrated experience with MS Project and or Primavera.
  • Certification in either the Association for the Advancement of Cost Engineering (AACE) and or Planning and Scheduling Professional (PSP) is desired.

Salary range: $138,204.00 $147,596.00

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Master Scheduler
Master Scheduler

Lentech, Inc. • Fort Meade (MD)

On-site
USD 138,000 - 148,000
Scheduler
Scheduler

Lentech, Inc • Maryland

On-site
USD 138,000 - 148,000
Scheduler
Scheduler

Lentech, Inc • Bethesda (MD)

On-site
USD 138,000 - 148,000
Scheduler Skill Level 3
Scheduler Skill Level 3

Strategic Analysis Incorporated • Fort Meade (MD)

On-site
USD 90,000 - 130,000
Master Scheduler
Master Scheduler

Science Applications International Corp. • Kirtland (NM)

On-site
USD 80,000 - 120,000
Scheduler (SCHED), Level 3
Scheduler (SCHED), Level 3

Gladiatoremergence • Fort Meade (MD)

Hybrid
USD 83,000 - 123,000
Scheduler (SCHED), Level 1
Scheduler (SCHED), Level 1

Gladiatoremergence • Fort Meade (MD)

Hybrid
USD 42,000 - 69,000
Scheduler Skill Level 3
Scheduler Skill Level 3

Strategic Analytix • Fort Meade (MD)

On-site
USD 120,000 - 180,000
Program Scheduler
Program Scheduler

DCCA • Bethesda (MD)

On-site
USD 128,000 - 270,000
Healthcare benefits
Retirement plan
Education assistance
Master Program Scheduler | MS Project & Primavera
Master Program Scheduler | MS Project & Primavera

Strategic Analytix • Fort Meade (MD)

On-site
USD 120,000 - 180,000