Manufacturing Scheduler & Production Flow Optimizer

New Hampshire Ball Bearings, Inc

Peterborough (NH)

On-site

USD 55,000 - 85,000

Full time

14 days+

Get more replies from employers

Send a job-specific resume in minutes.

Job summary

New Hampshire Ball Bearings, Inc. in Peterborough, NH is seeking a production planning/scheduling professional with 4+ years in manufacturing and at least 2 years in planning. You will coordinate with manufacturing teams to optimize production, process MDRs/DMRs, and collaborate with Planners to resolve issues while ensuring smooth material flow.

Proficiency in MAPICS, and MS Office (Word/Excel) is required. Physical duties include standing and lifting up to 40 lbs. This role requires U.S.

Qualifications

  • HS Diploma or GED required.
  • Minimum of four (4) years of experience in manufacturing.
  • A minimum of two (2) years production planning or scheduling experience preferred.
  • Proficiency with record-keeping and adherence to procedures.

Responsibilities

  • Coordinate with manufacturing teams to optimize production to meet customer and business needs.
  • Process MDR's and DMR's to ensure continuous product flow.
  • Use MAPICs to perform transactions, perform cycle counts, and split lots, as needed.
  • Partner with Planners to understand current and projected issues and recommend solutions.
  • Offload pending jobs from work areas to reduce bottlenecking and maximize efficiency.
  • Maintain proficiency and understanding of the responsibilities for material handling, cribs, shipping and receiving.

Skills

Manufacturing knowledge
Production control
Reading & following SOPs
Interpersonal communication
Attention to detail

Education

HS Diploma or GED

Tools

MAPICS
MS Excel
MS Word
MS Office

Job description

New Hampshire Ball Bearings, Inc. in Peterborough, NH is seeking a production planning/scheduling professional with 4+ years in manufacturing and at least 2 years in planning. You will coordinate with manufacturing teams to optimize production, process MDRs/DMRs, and collaborate with Planners to resolve issues while ensuring smooth material flow.

Proficiency in MAPICS, and MS Office (Word/Excel) is required. Physical duties include standing and lifting up to 40 lbs. This role requires U.S.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Production Scheduler - Material Flow & Coordination
Production Scheduler - Material Flow & Coordination

New Hampshire Ball Bearings, Inc (NHBB) • Peterborough (NH)

On-site
USD 60,000 - 80,000
Strategic Production Planner
Strategic Production Planner

RadNet, Inc. • Laconia (NH)

On-site
USD 55,000 - 85,000
Scheduler
Scheduler

New Hampshire Ball Bearings, Inc • Peterborough (NH)

On-site
USD 55,000 - 85,000
Scheduler
Scheduler

New Hampshire Ball Bearings, Inc (NHBB) • Peterborough (NH)

On-site
USD 60,000 - 80,000
Planner
Planner

RadNet, Inc. • Laconia (NH)

On-site
USD 55,000 - 85,000
Strategic Materials Buyer & Supplier Coordinator
Strategic Materials Buyer & Supplier Coordinator

New Hampshire Ball Bearings, Inc • Wildwood Village (NH)

On-site
USD 45,000 - 65,000
Strategic Production Planner (MRP & Scheduling)
Strategic Production Planner (MRP & Scheduling)

Getinge • Merrimack (NH)

On-site
USD 65,000 - 90,000
Health insurance
401k plan with company match
Paid Time Off
+7
Process Engineer
Process Engineer

New Hampshire Ball Bearings, Inc. (NHBB) • Peterborough (NH)

On-site
USD 80,000 - 90,000
Personalized career development plans
Comprehensive benefits
Collaborative work environment
Unit Manager, Manufacturing
Unit Manager, Manufacturing

New Hampshire Ball Bearings, Inc • Wildwood Village (NH)

On-site
USD 80,000 - 110,000
Production Planning Supervisor
Production Planning Supervisor

Gabriele & Company • Bedford (MA)

On-site
USD 75,000 - 95,000
Competitive base salary
Performance-based bonuses
Comprehensive benefits package