Manufacturing Engineer - Lean, NPI & Uptime Impact

Senior Flexonics Inc. (Bartlett)

Bartlett (IL)

On-site

USD 70,000 - 85,000

Full time

6 days ago
Be an early applicant

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

Medical, dental, and vision insurance
Dependent Care FS
401(k) with company match
Paid time off (vacation, PTO, holidays
Short-term and long-term disability
Life insurance
EAP and Identity Theft Protection

Job summary

Senior Flexonics Inc. (Bartlett) is seeking a Manufacturing Engineer to support engineering and production efforts aimed at boosting productivity, uptime, safety, and quality on the shop floor.

The role involves leading manufacturing improvements, developing standard work, and collaborating with maintenance, quality, and design teams. The ideal candidate will have 3-5 years of manufacturing engineering experience, a Bachelor's in Engineering, and exposure to lean and Six Sigma.

Qualifications

  • Minimum 3-5 years' experience in Manufacturing engineering; automotive experience is a plus.
  • Bachelor's Degree in Engineering required.
  • Six Sigma training is a plus.
  • Lean background and continuous improvement mindset.
  • Strong collaboration and communication across teams.

Responsibilities

  • Lead engineering and production support to improve productivity and uptime.
  • Develop and implement standard work, work instructions, and manuals.
  • Support safety initiatives, LOTO, interlocks, and safe programming for equipment.
  • Provide manufacturing leadership during new product launches and APQP tasks.
  • Drive cost-saving and process-improvement projects through Kaizen and lean methods.

Skills

Manufacturing engineering experience
Lean principles
Six Sigma
Project management
Collaboration/communication
Problem solving
Mechanical/electrical/industrial

Education

Bachelor's Degree in Engineering

Job description

Senior Flexonics Inc. (Bartlett) is seeking a Manufacturing Engineer to support engineering and production efforts aimed at boosting productivity, uptime, safety, and quality on the shop floor.

The role involves leading manufacturing improvements, developing standard work, and collaborating with maintenance, quality, and design teams. The ideal candidate will have 3-5 years of manufacturing engineering experience, a Bachelor's in Engineering, and exposure to lean and Six Sigma.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Manufacturing Engineer — Lean, APQP & Product Launch
Manufacturing Engineer — Lean, APQP & Product Launch

Senior • Bartlett (IL)

On-site
USD 70,000 - 85,000
Competitive salary
Commission plan
Comprehensive benefits
+6
Aerospace Manufacturing Engineer - NPI & CI Leader
Aerospace Manufacturing Engineer - NPI & CI Leader

Senior Flexonics - GA Precision • Franklin (WI)

On-site
USD 85,000 - 105,000
Quality Engineer: Flexible Hours & Continuous Improvement
Quality Engineer: Flexible Hours & Continuous Improvement

Senior Flexonics Inc. (Bartlett) • Bartlett (IL)

On-site
USD 70,000 - 80,000
Medical
Dental
Vision
+10
Senior Manufacturing Engineer - Dielectric Coating Line
Senior Manufacturing Engineer - Dielectric Coating Line

Energy Jobline ZR • Bartlett (IL)

On-site
USD 68,000 - 100,000
401(k) match
Paid time off
Tuition reimbursement
+3
Lean Production Supervisor & Kaizen Leader
Lean Production Supervisor & Kaizen Leader

Senior Flexonics Inc. (Bartlett) • Bartlett (IL)

On-site
USD 65,000 - 90,000
Medical insurance
Dental insurance
Vision insurance
+2
Manufacturing Engineer
Manufacturing Engineer

Senior Flexonics Inc. (Bartlett) • Bartlett (IL)

On-site
USD 70,000 - 85,000
Medical, dental, and vision insurance
Dependent Care FS
401(k) with company match
+4
Manufacturing Engineer - Lean, NPI & DFM for High‑Mix
Manufacturing Engineer - Lean, NPI & DFM for High‑Mix

Ulti-Mate Connector, Inc. • Garden Grove (CA)

On-site
USD 90,000 - 120,000
Manufacturing Engineer – Lean Process & QMS
Manufacturing Engineer – Lean Process & QMS

Flex-N-Gate • Evart (MI)

On-site
USD 65,000 - 90,000
Medical & Dental Insurance
401(k) with company match
Tuition reimbursement
+1
Automated Manufacturing Operator
Automated Manufacturing Operator

Senior plc • Bartlett (IL)

On-site
USD 36,000 - 49,000
Medical insurance
401(k) plan with company match
Paid time off
Manufacturing Engineer - Lean, High-Mix & NPI
Manufacturing Engineer - Lean, High-Mix & NPI

LHH • Frederick (MD)

On-site
USD 100,000 - 115,000
Paid vacation
Company holidays
401k with company matching