Low Voltage Superintendent – Data Center Construction

Jupiter I, Llc

El Paso (TX)

On-site

USD 73,000 - 100,000

Full time

14 days+

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

401(k) with match
Medical, dental, and vision insurance
3 weeks PTO

Job summary

LINX is seeking a Low Voltage Superintendent to lead field operations on hyperscale data center and large-scale commercial construction projects across the USA. The role is senior-level, with on-site leadership, client coordination, and a focus on structured cabling and fiber install.

You will manage crews, ensure quality, and drive safety while coordinating with GCs and clients. This position requires extensive hands-on field work and travel across the USA.

Qualifications

  • 5+ years managing low voltage or structured cabling crews on commercial construction projects.
  • Experience with hyperscale data center clients such as AWS, Google, Microsoft, Meta, OCI, etc.
  • Hands-on mastery of low voltage installation across structured cabling, fiber optic systems, and associated pathways.

Responsibilities

  • Lead and supervise low voltage technicians and leads across medium to large-scale projects.
  • Set daily and weekly crew priorities, manage scheduling and staffing levels, and make real-time decisions.
  • Conduct hands-on technical training for technicians and leads covering installation methods, test equipment operation, and quality standards.
  • Own on-site execution from mobilization through close-out for structured cabling and related infrastructure.

Skills

Crew leadership
Quality control
Team training

Tools

Fluke Testers
OTDRs
Power meters

Job description

If you are unable to complete this application due to a disability, contact this employer to ask for an accommodation or an alternative application process.

Low Voltage Superintendent – Data Center Construction

Full Time El Paso, TX, US

3 days ago Requisition ID: 2397

Salary Range: $35.00 To $48.00 Annually

LINX is hiring a Low Voltage Superintendent to lead field operations on hyperscale data center, mission-critical, and large-scale commercial construction projects across the United States. This is a senior field leadership role — you'll run crews, own project quality, and be the person clients and GCs call when something needs solving on the spot.

If you've built your career running structured cabling and fiber on complex, high-stakes projects and you're ready to do that work for a company that's growing fast across the USA, this is the role.

Pay: $35.00–$48.00/hour based on experience, plus bonus opportunities.

What You'll Be Doing

This role splits roughly between crew leadership, project execution, and client-facing coordination. The majority of your time is on-site, running the work.

Field Leadership & Crew Management
  • Lead and supervise low voltage technicians and leads across medium to large-scale projects — hyperscale data centers and commercial construction projects.
  • Set daily and weekly crew priorities, manage scheduling and staffing levels, and make real-time decisions when conditions on-site change
  • Conduct hands-on technical training for technicians and leads — covering installation methods, test equipment operation, and quality standards
  • Support hiring decisions and help build the crew capacity needed to meet project demand
Project Execution & Quality Control
  • Own on-site execution from mobilization through close-out — structured cabling, high-density fiber optic networks, copper terminations (Cat6/Cat6A), pathway systems, and associated infrastructure
  • Operate and interpret results from test equipment including Fluke Testers, OTDR's & power meters — and ensure all testing documentation meets project and client standards
  • Manage materials on-site — receiving, staging, tracking, and flagging shortages or procurement issues to the project manager before they become schedule problems
  • Enforce compliance with LINX quality standards, customer contractual requirements, and project completion documentation at every phase
Safety & Compliance
  • Lead safety culture on-site — daily toolbox talks, hazard identification, incident reporting, and enforcement of OSHA and company safety policies
  • Maintain compliance with all project-specific safety plans, site access requirements, and documentation standards — particularly critical in data center and mission-critical environments where access controls and protocols are stringent
Coordination & Communication
  • Represent LINX in project meetings with GCs, trade contractors, owners, and clients — communicate schedule status, manpower levels, issues, and change order scope clearly and professionally
  • Coordinate with suppliers, project managers, and estimating on material needs, scope changes, and budget impacts
  • Participate in pre-bid walkthroughs and post-project reviews as needed
Requirements
Experience
  • 5+ years managing low voltage or structured cabling crews on commercial construction projects, with a track record of running multiple projects simultaneously
  • Experience with hyperscale data center clients such as AWS, Google, Microsoft, Meta, OCI etc.
  • Hands-on mastery of low voltage installation across structured cabling, fiber optic systems, and associated pathways — you can do the work yourself and teach others to do it right
Technical Skills
  • Proficiency with industry-standard test equipment and the ability to run tests, interpret results, troubleshoot failures, and produce clean documentation
  • Ability to read and interpret construction documents including scope of work, bill of materials, blueprints, and project schedules
  • Working knowledge of applicable industry standards — BICSI, Division 27, etc.
Leadership & Communication
  • Proven ability to lead, develop, and hold accountable a crew of 20-50 technicians across active jobsites
  • Strong written and verbal communication in English — you will interact directly with clients, GCs, and internal project teams regularly
  • Ability to manage change orders, timesheets, and staffing documentation accurately and on time
Certifications & Logistics
  • Valid driver's license required
Preferred (not required)
  • OSHA 30 certification
  • Manufacturer-specific test equipment certification
  • Ability to travel 100% across the USA for projects

Pay Rate: $35.00–$48.00/hour depending on experience Bonus: Performance-based bonus opportunities available

  • 401(k) with 50% employer match on first 5% contributed
  • Medical, dental, and vision insurance with FSA and HSA options
  • Short and long-term disability coverage
  • 3 weeks PTO (vacation and sick combined)
  • 8 paid holidays
  • Ongoing technical training and certification support
About LINX

Founded in 2003 by working industry practitioners, LINX has grown across the USA and has completed projects in all 50 states. We design, install, and support commercial network cabling, fiber, AV, security, and wireless systems for data centers, commercial buildings, and mission-critical environments.

We're growing fast because the market demands it — AI infrastructure buildout, data center expansion, and commercial construction activity across our markets are driving sustained project volume. When we hire at the superintendent level, it's because the pipeline is real.

Posting Deadline

This job posting is open until filled and may close at any time without notice.

We are an equal opportunity/affirmative action employer. We consider candidates regardless of race, color, religion, gender, sexual orientation, gender identity, national origin, disability, or status as a protected veteran, and encourage minorities, females, veterans, and individuals with disabilities to apply.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Low Voltage Superintendent – Data Center Construction
Low Voltage Superintendent – Data Center Construction

TeamLINX • El Paso (TX)

On-site
USD 48,000 - 66,000
401(k) with employer match
Medical, dental, and vision insurance
Disability coverage
+3
Low Voltage Superintendent – Data Center Construction
Low Voltage Superintendent – Data Center Construction

LINX • El Paso (TX)

On-site
USD 4,822,000 - 4,823,000
401(k) with employer match
Medical, dental, and vision insurance
Paid time off - 3 weeks
+3
Data Center Superintendent - Travel
Data Center Superintendent - Travel

Jupiter I, Llc • Fayetteville (GA)

On-site
USD 48,000 - 66,000
401(k) with employer match
Medical, dental, and vision insurance
Sick and vacation PTO
+2
Senior Data Center Low-Voltage Lead - Field Operations
Senior Data Center Low-Voltage Lead - Field Operations

Jupiter I, Llc • El Paso (TX)

On-site
USD 73,000 - 100,000
401(k) with match
Medical, dental, and vision insurance
3 weeks PTO
Low Voltage Superintendent – Data Center & Commercial Construction
Low Voltage Superintendent – Data Center & Commercial Construction

Team LINX LLP • Salt Lake City (UT)

Hybrid
USD 48,000 - 66,000
Bonus Opportunities
Cell phone allowance
401(k) with employer match
+1
Data Center Superintendent - Travel
Data Center Superintendent - Travel

LINX • Fayetteville (GA)

On-site
USD 48,000 - 66,000
401(k) with 50% employer match on the
Medical, dental, and vision insurance
Short and long-term disability
+4
Data Center Superintendent
Data Center Superintendent

LINX • Oklahoma City (OK)

On-site
USD 48,000 - 66,000
401(k) with 50% employer match on the
Medical, dental, and vision insurance
3 weeks PTO
+3
Data Center Superintendent - Travel
Data Center Superintendent - Travel

LINX • Lafayette (LA)

On-site
USD 48,000 - 66,000
401(k) with 50% employer match on the
Medical, dental, and vision insurance
Short and long-term disability
+5
Data Center Superintendent - Trave;
Data Center Superintendent - Trave;

LINX • Columbus (OH)

On-site
USD 48,000 - 66,000
401(k) with 50% employer match on 5%
Medical, dental, and vision insurance
3 weeks PTO (vacation and sick)
+3
Data Center Superintendent - Trave;
Data Center Superintendent - Trave;

Jupiter I, Llc • Columbus (OH)

On-site
USD 48,000 - 66,000
401(k) with 50% employer match
Medical, dental, and vision insurance
Disability coverage
+4