A complete application in a minute
Tailored resume and cover letter, ready to send.
Trillium Construction in Stafford, VA is seeking a Crane Operator to support precast concrete and/or structural steel erection on a data center project. You will operate a Link-Belt LS-278 crawler crane with about 180 feet of boom and perform precise lifts under the supervision of the erection crew.
Required NCCCO certification and OSHA 30, with lattice-boom crawler crane experience preferred. Daily inspections are expected; orientation and pre-employment screenings are required.
Trillium Construction in Stafford, VA is seeking a Crane Operator to support precast concrete and/or structural steel erection on a data center project. You will operate a Link-Belt LS-278 crawler crane with about 180 feet of boom and perform precise lifts under the supervision of the erection crew.
Required NCCCO certification and OSHA 30, with lattice-boom crawler crane experience preferred. Daily inspections are expected; orientation and pre-employment screenings are required.