K-8 Substitute Teacher (Part-Time) Impactful Classrooms

Archden

Denver (CO)

Hybride

USD 20 664 - 34 440

Temps partiel

14 jours+

Obtenez une réponse de cet employeur

Votre CV et votre lettre de motivation, adaptés exactement à ce que l’employeur recherche.

Passez les filtres ATS

Résumé du poste

A local education institution is seeking a K-8th Grade substitute teacher in Denver, Colorado. Responsibilities include implementing lesson plans, supervising students, and ensuring their safety during school activities. Applicants must pass background checks and complete training through the PDIS online service. This is a part-time position with no associated benefits.

Qualifications

  • Must pass multiple background checks.
  • Complete necessary paperwork and training.

Responsabilités

  • Carry out sub-plans as directed by the lead teacher.
  • Supervise students throughout the school day.
  • Ensure children's safety through active participation and observation.

Description du poste

Description

As a K-8th Grade substitute, you will be responsible for carrying out the sub-plans as directed by the lead teacher in the classroom, and supervising the class of students throughout the day. Some of these tasks include: greeting students as they arrive; supervising children during activities such as lunch, recess, specials (as needed), classroom lessons and activities; making sure children are safe at all times of the day through active participation, observation and intervening when necessary, and/or when asked to by the administration; interacting with all students and staff with kindness and respect.

Requirements

Individual staff members will need to pass multiple background checks, as well as complete necessary paperwork and training in order to be in the K-8th Grade classrooms. Training will be completed on an online service titled PDIS and staff members will be compensated for their time to do so. We would like to fill this position within a month. There are no benefits associated with this job as it is part-time.

Obtenez votre examen gratuit et confidentiel de votre CV.

ou faites glisser et déposez votre fichier ici.

Similar jobs

Postes similaires à comparer

Substitute Teacher (K-8) - Assumption Catholic School
Substitute Teacher (K-8) - Assumption Catholic School

Archdiocese of Denver • Denver (CO)

Sur place
USD 20 664 - 34 440
Substitute Teacher - K-8
Substitute Teacher - K-8

Teton Science Schools • Victor (ID)

Sur place
USD 21 000 - 34 000
K-8 Substitute Teacher - Flexible Part-Time Role
K-8 Substitute Teacher - Flexible Part-Time Role

Michigan Association of School Boards • Saginaw (MI)

Sur place
USD 21 000 - 30 000
Substitute Teacher K8
Substitute Teacher K8

Teton Science Schools • Victor (ID)

Sur place
USD 20 664 - 34 440
Substitute Faculty - K-8
Substitute Faculty - K-8

Teton Science Schools • Jackson (WY)

Sur place
USD 21 000 - 34 000
Substitute Faculty K8
Substitute Faculty K8

Teton Science Schools • Jackson (WY)

Sur place
USD 20 664 - 34 440
K-8 School Substitute: Impact, Support & Benefits
K-8 School Substitute: Impact, Support & Benefits

Legacy Traditional Schools • Texas

Sur place
USD 25 000 - 32 000
Part-Time K-12 Substitute Teacher — Impactful Classroom Support
Part-Time K-12 Substitute Teacher — Impactful Classroom Support

Young World Physical Education • Mount Holly (NC)

Sur place
USD 20 664 - 34 440
K-8 School Substitute — Inspire Learning & Support
K-8 School Substitute — Inspire Learning & Support

Legacy Traditional Schools • Arizona

Sur place
USD 17 000 - 25 000
Industry-leading pay
Referral bonuses
Paid time off
+6
Dynamic Daily Substitute Teacher - K-8 (Part-Time)
Dynamic Daily Substitute Teacher - K-8 (Part-Time)

Diocese of Allentown • Hometown (PA)

Sur place
USD 18 450 - 27 675