Inspire Middle School Math Teacher – Full-Time Impact

Sylvania

Kalamazoo (MI)

On-site

USD 48,000 - 93,000

Full time

14 days+
Application generator

Don’t send a generic resume — generate a resume and cover letter tailored to this exact role.

Get past ATS filters

Job summary

Milwood Magnet School in Kalamazoo, part of Kalamazoo Public Schools, seeks a Middle School Mathematics Teacher (1.0 FTE) to deliver engaging instruction to grades 6–8 and contribute to a positive learning environment.

The successful candidate will hold a four-year degree, Michigan teaching certificate with Math endorsement, and demonstrate strong communication skills. This full-time, 10-month position offers a competitive KEA salary schedule.

Qualifications

  • Four-year degree from an accredited teacher preparation program.
  • Valid Michigan Teaching Certificate in the area of study required.
  • Must be Highly Qualified in the content area with the endorsement of Math (EX), Grades 6-8 or 6-12.
  • Demonstrated skill in oral and written communication.

Responsibilities

  • The Teach District approved the curriculum.
  • Meet and instruct assigned classes in the location and at the time designated.
  • Plan a program of study that meet the individual needs, interests, and ability of the students.
  • Create a classroom environment that is conducive to learning and appropriate to the maturity and interests of the students.
  • Take all necessary and reasonable precautions to protect students, equipment, materials, and facilities.
  • Employ a variety of instructional techniques and instructional media, consistent with the physical limitations of the location provided and the needs and capabilities of the individuals or student groups involved.
  • Establish and maintain reasonable standards and procedures for pupil behavior to achieve an effective learning atmosphere.
  • Guide the learning process toward the achievement of curriculum goals and—in harmony with the goals—establishes clear objectives for all lessons, units, projects, and the like to communicate these objectives to students.
  • Identify students for special education referrals on a regular basis, seeking the assistance of district specialists as required.
  • Evaluate pupils’ academic and social growth, keep accurate records, and prepare progress reports.
  • Available to students and parents for education-related purposes outside the instructional day.

Skills

Oral and written communication

Education

Four-year degree from an accredited teacher preparation program
Michigan Teaching Certificate in area of study
Endorsement Math (EX), Grades 6-8 or 6-12

Job description

Milwood Magnet School in Kalamazoo, part of Kalamazoo Public Schools, seeks a Middle School Mathematics Teacher (1.0 FTE) to deliver engaging instruction to grades 6–8 and contribute to a positive learning environment.

The successful candidate will hold a four-year degree, Michigan teaching certificate with Math endorsement, and demonstrate strong communication skills. This full-time, 10-month position offers a competitive KEA salary schedule.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Middle School Math Teacher
Middle School Math Teacher

Sylvania • Kalamazoo (MI)

On-site
USD 48,000 - 93,000
Middle School Math Teacher - Inclusive & Impactful
Middle School Math Teacher - Inclusive & Impactful

Kelloggsville Middle School • Grand Rapids (MI)

On-site
USD 48,000 - 60,000
Inspiring Middle School Science Teacher | 1.0 FTE
Inspiring Middle School Science Teacher | 1.0 FTE

Sylvania • Kalamazoo (MI)

On-site
USD 6,000 - 93,000
Dynamic Middle School Math Educator
Dynamic Middle School Math Educator

Hamtramck Public Schools • Hamtramck (MI)

On-site
USD 52,000 - 62,000
Inspiring Middle School Math Teacher for Grades 6–8
Inspiring Middle School Math Teacher for Grades 6–8

Sylvania • Michigan

Hybrid
USD 42,000 - 64,000
High School Math Teacher — Inspire, Grow, Impact Students
High School Math Teacher — Inspire, Grow, Impact Students

CS Partners • Southfield (MI)

On-site
USD 45,000 - 65,000
Health Insurance: Medical, Vision, &–s
Life, ADD, STD, LTD 100% paid by theem
Voluntary Plans Available
Math Teacher (Long-Term Substitute) - Middle School
Math Teacher (Long-Term Substitute) - Middle School

Memspa • Michigan

On-site
USD 40,000 - 60,000
Inspiring Secondary Math Teacher - Full-Time, Tech-Driven
Inspiring Secondary Math Teacher - Full-Time, Tech-Driven

Young World Physical Education • Kingsley (MI)

On-site
USD 50,000 - 60,000
MS Math Teacher
MS Math Teacher

Gaming and Technology Academy of Saginaw • Saginaw (MI)

On-site
USD 52,000 - 66,000
Empowering Middle & High School Math Teacher
Empowering Middle & High School Math Teacher

Sylvania • Flint (MI)

On-site
USD 48,000 - 75,000
Health insurance
Dental insurance
Vision insurance